ML18152B583
| ML18152B583 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 12/18/1998 |
| From: | Berkow H NRC (Affiliation Not Assigned) |
| To: | Ohanlon J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18152B584 | List: |
| References | |
| TAC-MA1999, NUDOCS 9812280254 | |
| Download: ML18152B583 (3) | |
Text
- .....
- I e
Mr. J.P. O'Hanlon Senior Vice President - Nuclear Virginia.Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060 December 18, *1 998.
Distribution
-.Docket File PUBLIC PDll-2 RF J. Zwolinski E. Dunnington G. Edison H. Berkow T. Harris (SE)
OGC ACRS L. Plisco, Rll D. Fischer
SUBJECT:
SURRY POWER STATION, UNIT 1 - INSERVICE TESTING PROGRAM, REVISION 1, RELIEF REQUEST NO. P-11 (TAC NO. MA 1999)
Dear Mr. O'Hanlon:
By letter dated May 4, 1998, Virginia Electric and Power Company submitted a*request for relief from certain ASME Code inservice testing requirements at Surry Power Station, Unit 1.
Our evaluation and conclusions are contained in the enclosed Safety Evaluation. Your proposed alternative testing and expanded acceptance criteria in Relief Request P-11 are authorized pursuant to 10 CFR 50.55a(a)(3)(ii) based on determinations that the proposals provide reasonable assurance of operational readiness arid that compliance with the Code would res*u1t in a hardship without a compensating increase in the level of quality and safety.
This concludes our efforts on this issue and we are, therefore, closing out TAC No. MA1999.
Docket No. 50-280
Enclosure:
As stated cc w/encl: See nextpage Sincerely,
,q~Jg,in-c;i L~i ~oe(Lby:
- nercert N.*oerkow, Director Project Directorate 11-2 Division of Reactor Projects - 1/11 Office of Nuclear Reactqr Regulation FILENAME - G:\\SURRY\\MA 1999.L TR OFFICIAL RECORD COPY *See previous concurrence OFFICE PM:PDll-2*
LA:PDll-2*
NAME GEdison:cn DATE 11/23/98 11/17/98 COPY.
Yes/No 9812280254 981218 PDR ADOCK 05000280 P
PDR D:PDll-2 OGC*
MYoung
/'-Jib /98 12 /4/98 Yes/No Yes/No
/A\\
v" \\J \\
y\\ '
e UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555--0001 Mr. J. P. O'Hanlon Senior Vice President - Nuclear Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060 December 18, 1998
SUBJECT:
SURRY POWER STATION, UNIT 1 - INSERVICE TESTING PROGRAM, REVISION 1, RELIEF REQUEST NO. P-11 (TAC NO. MA1999)
Dear Mr. O'Hanlon:
By letter dated May 4, 1998, Virginia Electric and Power Compar:,y submitted a request for relief from certain ASME Code inservice testing requirements at Surry Power Station, Unit 1.
Our evaluation and conclusions are contained int.he enclosed Safety Evaluation. Your proposed alternative testing and expanded acceptance criteria in Relief Request P-11 are authorized pursuant to 1 O CFR 50.55a(a)(3)(ii) based on determinations that the proposals provide reasonable assurance of operational readiness and that compliance with the Code would result in a hardship without a compensating increase in the level of quality and safety.
This concludes our efforts on this issue and we are, therefore, closing out TAC No. MA 1999.
Docket No. 50-280
Enclosure:
As stated cc w/encl: See next page Sincerely,
.~
H bert N. Berkow, irector oject Directorate 11-2*
Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
e Mr. J. P. O'Hanlon Virginia Electric and Power Company cc:
Mr. Donald P. Irwin, Esq.
. Hunton and Williams Riverfront Plaza, East Tower 951 E. Byrd Street Richmond, Virginia 23219 Mr. E. S. Grecheck Site Vice President Surry Power Station Virginia Electric and Power Company 5570 Hog Island Road Surry, Virginia 23883 Senior Resident Inspector Surry Power Station U. S. Nuclear Regulatory Commission 5850 Hog Island Road Surry, Virginia 23883 Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 Dr. W. T. Lough Virginia State Corporation Commission Division of Energy Regulation P. 0. Box 1197 Richmond; Virginia 23209 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth Street, SW, Suite 23T85 Atlanta, Georgia 30303 Robert B. Strobe, M.D., M.P.H.
State Health Commissioner Office of the.Commissioner Virginia Department of Health P.O. Box 2448 Richmond, Virginia 23218 Surry Power Station Office of the Attorney General Commonwealth of Virginia 900 East Main Street Richmond, Virginia 23219 Mr. J. H. McCarthy, Manager Nuclear Licensing & Operations Support Innsbrook Technical Center Virginia Electric and Power Company 5000 Dominion Blvd.
Glen Allen, Virginia 23060 Mr. R. C. Haag U.S. Nuclear Regulatory Commission Atlanta Federal Center 61 Forsyth St., SW, Suite 23T85 Atlanta, Georgia 30303 Mr. W. R. Matthews Site Vice President North Anna Power Station Virginia Electric and Power Company P. 0. Box 402 Mineral, Virginia 23117