J Docket Nos. 50-280 and 50-281 Mr. D. S. Cruden e
Vice President - Nuclear Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261
Dear Mr. Cruden:
June 29, 1988 ~
DISTRIBUTION Docket File NRC & Local PDRs PD I I-2 Rdg.
SVarga, 14/E/4 GLainas, 14/H/3 LOlshan, 13/0/1 CPatel OGC EJordan, 3302MNBB BGrimes, 9/A/2 ACRS(lO)
Gray File
SUBJECT:
GENERIC LETTER 88-03, "STEAM BINDING OF AUXILIARY FEEDWATER PUMPS" (TAC NOS. 67280 AND 67281)
I On February 17, 1988, Generic Letter 88-03, "Steam Binding of Auxiliary Feedwater Pumps," was issued.
The generic 1 etter requested a 11 1 i censees of operating pressurized water reactors (PWRs) and holders of construction permits for PWRs to confirm that appropriate procedures are in place, and will be maintained, to minimize the occurrence of steam binding of 1the auxiliary feedwater (AFW) ptimps.
The procedures require monitoring fluid conditions within the AHJ system each shift during times when the system is required to be operable, and recognizing steam binding and restoring the AFW system to operable status should steam binding occur.
Your response, dated May 23, 1988, confirmed that the necessary procedures are in place at Surry Units 1 and 2.
However, your response did not specifically address your commitment to maintain such procedures.
Per the telecon between myse 1f and T. Shaub of your staff on June 28, 1988, it is understood that you will maintain these procedures as requested by the generic letter. Thus, your response to Generic Letter 88-03 is satisfactory and no further action is necessary.
This completes our action on this issue.
cc:
See next page L~2 DM\\f--N i:!r 06/lV88 Cl)f PM:PIJII-2 CPatel:bd 06/.2q/88 Sincerely, Original signed by Chandu P. Patel, Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation
e Mr. D. S. Cruden Virginia Electric and Power Company cc:
Mr. Michael W. Maupin Hunton and Williams Post Office Box 1535 Richmond, Virginia 23212 Mr. David L. Benson, Manager Surry Power Stat i ori Post Office Box 315 Surry, Virginia 23883 Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission Post Office Box 166, Route 1 Surry, Virginia 23883 Mr. Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 W. T. Lough Virginia Corporation Commission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 C. M. G. Buttery, M.D., M.P.H.
Department of Health 109 Governor Street Richmond, Virginia 23219 Surry Power Station Attorney General Supreme Court Building 101 North 8th Street Richmond, Virginia 23219