Text
~,
II>-- ---
Docket Nos. 50-280, 50-281
EA 87-181
OEC 2 9 1987
Virginia Electric and Power Company
ATTN:
Mr. W. L. Stewart, Vice President,
Nuclear Operations
Post Office Box 26666
Richmond, Virginia 23261
Gentlemen:
SUBJECT:
(NRC INSPECTION REPORT NOS. 50-280/87-21 AND 50-281/87-21)
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
W. E. Holland on July 5 - August 29, 1987.
The inspection included a review of
selected activities authorized at the Surry Power Station.
The report document-
ing this inspection was sent to you by letter dated September 16, 1987.
The
NRC concerns relative to these findings were discussed in an Enforcement
Conference held on September 24, 1987.
Documentation of this conference was
sent to you by letter dated October 16, 1987.
The first violation described in the enclosed Notice of Violation involved a
failure to perform and document the Station Nuclear Safety and Operating
Committee (SNSOC) reviews for evaluation of unreviewed safety questions as
required by Technical Specifications and 10 CFR 50.59.
The NRC staff considers
violations of 10 CFR 50.59 to be of significant regulatory concern.
Normally,
a violation of 10 CFR 50.59, where an amendment is required but not sought, is
classified as a Severity Level III violation. The first example under viola-
tion A.I is of that type.
However, in this case, because of the lack of
specificity of the turbine valve testing commitment and the low safety signif-
icance of the failure to do that testing, the first violation described in the
enclosed Notice has been classified as a Severity Level IV violation. The
other examples under violation A.I would not have required an amendment.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your response,
you should document the specific actions taken and any additional actions you
plan to prevent recurrence. After reviewing your response to this Notice,
including your proposed corrective actions and the results of future inspec-
tions, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements .
'8801120005 871229
ADOCK 05000280
,,,
Q
It: o /
Virginia Electric
and Power Company
- 2 -
DEC 2 9 1987
In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosures
will be placed in the NRC Public Document Room.
The responses directed by this letter and its enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
Should you have any questions concerning this letter, please conta~t us.
Enclosure:
cc w/encl:
D. L. Benson, Station Manager
N. E. Hardwick, Manager - Nuclear
Programs and Licensing
Sincerely,
ORIGINAL SIGNED BY
M. L. ERNST
J. Nelson Grace
Regional Administrator.
,/ "
Virginia Power
and Electric Company
bee w/encls:
NRC Resident Inspector
Document Control Desk
Commonwealth of Virginia
SECY
CA
J. Taylor, DEDO
T. Martin, DEDRO
L. Chandler, OGC
J. Lieberman, OE
J. Luehman, OE
J. N. Grace, RI!
Enforcement Coordinators
RI, RI!, RIII, RIV, RV
F. Miraglia, NRR
8. Hayes, OI
S. Connelly, OTA
E. Jordan, AEOD
F. Ingram, PA
D. Nussbaumer, GPSP
- 3 -
- ~n ~
yes
l!if 187
11
/B~c)[{ fl\\~7
{ ~4
~e,r
~;mai"
OGC°tu'\\ /.;
R *RII
LChandl er cf3-
JNG
ce
111r /87
11/ /87
11/
DEC 2 9 1987
R~
GRJenk ns
'
'
ll/ / /87
~
~rf1l,r'
~ ~~'\\,.\\
D:OE J\\ ~
Jlieberma
11/ /87
..,1 '
RI I
MErnst
11/ /87