Similar Documents at Surry |
---|
Category:MONTHLY OPERATING ANALYSIS REPORT
MONTHYEARML18152B3531999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Surry Power Station,Units 1 & 2.With 991012 Ltr ML18152B6651999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Surry Power Station Units 1 & 2.With 990915 Ltr ML18152B3791999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Surry Power Station,Units 1 & 2.With 990811 Ltr ML18152B3911999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Surry Power Station,Units 1 & 2.With 990713 Ltr ML18152B4341999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Surry Power Station,Units 1 & 2.With 990614 Ltr ML18152B4161999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr ML18152B6511999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 ML18152B7331999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Surry Power Station,Units 1 & 2.With 990310 Ltr ML18152B5421999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Surry Power Station,Units 1 & 2.With 990210 Ltr ML18152B6011998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Surry Power Station,Units 1 & 2.With 990115 Ltr ML18152B5721998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Surry Power Station,Units 1 & 2.With 981214 Ltr ML18152B6241998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Surry Power Station Units 1 & 2.With 981111 Ltr ML18152B6881998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Surry Power Station Units 1 & 2.With 981012 Ltr ML18153A3271998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Surry Power Station,Units 1 & 2 ML18153A3161998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Surry Power Station Units 1 & 2.W/980807 Ltr ML18152B7621998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Surry Power Station,Units 1 & 2.W/980707 Ltr ML18153A3141998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Surry Power Station,Units 1 & 2.W/980610 ML18152B8161998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Surry Power Station Units 1 & 2.W/980508 Ltr ML18153A2951998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sps,Units 1 & 2.W/ 980408 Ltr ML18153A2871998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Surry Power Station,Units 1 & 2.W/980313 Ltr ML18153A3671998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Surry Power Station,Units 1 & 2 ML18153A3521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Surry Power Station,Units 1 & 2.W/980113 Ltr ML18153A3861997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Surry Power Station,Units 1 & 2.W/971211 Ltr ML18153A3981997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Surry Power Station Units 1 & 2.W/971113 Ltr ML18153A4501997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Surry Power Station,Units 1 & 2.W/971010 Ltr ML18153A4421997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Surry Power Station,Units 1 & 2.W/970915 Ltr ML18153A4291997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Surry Power Station,Units 1 & 2.W/970812 Ltr ML18153A4241997-06-30030 June 1997 Monthly Operating Repts for June 1997 for SPS.W/970711 Ltr ML18153A4161997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Surry Power Station Units 1 & 2 ML18152A5521997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Surry Power Station Units 1 & 2.W/970513 Ltr ML18153A4171997-04-30030 April 1997 Corrected Page 3 of 19 to MOR for Apr 1997 for Surry Power Station Unit 1 ML18152A4051997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Surry Power Station Units 1 & 2.W/970414 Ltr ML18152A5121997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for SPS.W/970312 Ltr ML18153A4941997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Surry Power Station,Units 1 & 2.W/970213 Ltr ML18152A4041996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Surry Power Station Units 1 & 2.W/970110 Ltr ML18153A6441996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Surry Power Station Units 1 & 2.W/961211 Ltr ML18153A6301996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Surry Power Station Units 1 & 2.W/961114 Ltr ML18153A0861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Surry Power Station Units 1 & 2.W/961014 Ltr ML18152A5491996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Surry Power Station Units 1 & 2.W/960913 Ltr ML18153A0421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Surry Power Station Units 1 & 2.W/960814 Ltr ML18153A0221996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Surry Power Station Units 1 & 2.W/960711 Ltr ML18152A4031996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Surry Power Station Units 1 & 2.W/960613 Ltr ML18153A4571996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Surry Power Station Units 1 & 2.W/960513 Ltr ML18153A6871996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Sps,Units 1 & 2. W/960412 Ltr ML18153A5291996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for SPS.W/960313 Ltr ML18153A5931996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Surry Power Station.W/960212 Ltr ML18153A5741995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Surry Power Station Units 1 & 2.W/960111 Ltr ML18153A5551995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Surry Power Units 1 & 2.W/951212 Ltr ML18153A6691995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Surry Power Station Units 1 & 2.W/951113 Ltr ML18153A7861995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Surry Power Station Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML18152B3531999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Surry Power Station,Units 1 & 2.With 991012 Ltr ML18152B6651999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Surry Power Station Units 1 & 2.With 990915 Ltr ML18152B4421999-08-27027 August 1999 LER 99-006-00:on 990802,determined That Plant Was Outside of App R Design Basis Due to Fire Barrier Deficiencies. Caused by Original Plant Design Deficiencies.Fire Watches Were Established & Mods Have Been Completed.With 990827 Ltr ML18152B4411999-08-27027 August 1999 LER 99-005-00:on 990731,effluent Radiation Monitors Were Declared Inoperable.Caused by Degraded Heat Trace Circuits for Monitors Sample Suction Line.Degraded Heat Trace Circuit Was Replaced & Addl Heat Trace Is Being Installed ML18151A3981999-08-13013 August 1999 SPS Unit 2 ISI Summary Rept for 1999 Refueling Outage. ML18152B3771999-08-13013 August 1999 LER 99-004-00:on 990714,TS Violation Due to non-safety Related Fans Effect on CR Boundary Was Noted.Cause of Event Has Not Yet Been Determined.Cable Spreading Room Doors Were Operned to Reduce Pressure in Rooms ML18152B3791999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Surry Power Station,Units 1 & 2.With 990811 Ltr ML18152B3911999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Surry Power Station,Units 1 & 2.With 990713 Ltr ML18152B4341999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Surry Power Station,Units 1 & 2.With 990614 Ltr ML20195E2401999-05-31031 May 1999 Rev 2 to COLR for SPS Unit 2 Cycle 16 Pattern Ag ML18152B4181999-05-18018 May 1999 LER 99-002-00:on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With 990518 Ltr ML18152B4161999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr ML18152B4111999-04-28028 April 1999 LER 99-003-00:on 990331,potential Loss of Charging Pumps Was Noted.Caused by Main CR Fire.Station Deviation Was Issued on 990331.With 990428 Ltr ML18152B6511999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 ML18153A2741999-03-29029 March 1999 LER 99-002-00:on 990301,prematurely Released Fire Watches Resulted in Violation of TS 3.21.B.7.Caused by Inadequate Procedure.Procedure for Opening & Sealing Fire Stops Was Revised on 990212 ML18153A2681999-03-19019 March 1999 LER 98-013-01:on 981122,turbine/reactor Tripped on High Due to Short Circuit in Summator for MSL C Loop Channel III Flow Transmitter.Replaced 1-MS-FT1494 Summator & Module Repair Procedure Revised.With 9903190 Ltr ML18152B7331999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Surry Power Station,Units 1 & 2.With 990310 Ltr ML18152B5421999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Surry Power Station,Units 1 & 2.With 990210 Ltr ML18151A3031999-01-29029 January 1999 ISI Summary Rept for 1998 Refueling Outage,Including Form NIS-1, Owners Rept for ISIs & Form NIS-2, Owners Rept for Repairs & Replacements. ML18152B7261999-01-21021 January 1999 LER 99-001-00:on 981222,auxiliary Feedwater Pipe Support Missed Surveillance.Caused by Personnel Error.Station Deviation Rept Was Submitted.Two Supports in Question Received Required Code Insp & Were Found Acceptable ML18152B6011998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Surry Power Station,Units 1 & 2.With 990115 Ltr ML18152B5781998-12-16016 December 1998 LER 98-014-00:on 981126,manual Reactor Trip in Response to Main Feedwater Regulating Valve Failure Occurred.Caused by Dislocation of Retaining Clip in Positioner.Control Room Operators Placed Unit in Safe,Shutdown Condition ML18152B5811998-12-16016 December 1998 LER 98-013-00:on 981122,turbine/reactor Trip on High SG Level Occurred.Caused by Instrument Failure.Control Room Operators Placed Unit in Safe,Shutdown Condition ML18152B7121998-12-0404 December 1998 LER 98-S01-00:on 981105,noted Failure to Deactivate Station Access Badge.Caused by Human Error.Licensee Will Now Deactivate Station Badges Before Clearance Is Revoked & Process for Badge Deactivations Have Been Strengthened ML18152B7041998-12-0101 December 1998 LER 98-012-00:on 981102,noted That EDGs Were Concurrently Inoperable.Caused by Required Testing Per TS 3.16.B.1.a.2. Redundant EDG Was Returned to Svc within Two Hour Period, Following Satisfactory Testing.With 981201 Ltr ML18152B7081998-11-30030 November 1998 Rev 0 to COLR for Surry 1 Cycle 16,Pattern Un. ML18152B5721998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Surry Power Station,Units 1 & 2.With 981214 Ltr ML18152B6161998-11-0606 November 1998 LER 98-011-00:on 981008,diesel Driven Fire Pump Failed to Start During Performance of Monthly Operability Test.Caused by Faulty Overspeed Trip Device Failure.Diesel Driven Fire Pump Declared Inoperable ML18152B6241998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Surry Power Station Units 1 & 2.With 981111 Ltr ML18152B6081998-10-23023 October 1998 LER 98-010-01:on 980715,intake Canal Level Probes Were Inoperable Due to Marine Growth.Caused by Design of Canal Level Instrumentation.Canal Level Probes Will Continue to Be Monitored More Closely ML18152B6881998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Surry Power Station Units 1 & 2.With 981012 Ltr ML18153A3271998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Surry Power Station,Units 1 & 2 ML18152B7811998-07-31031 July 1998 LER 98-010-00:on 980715,low Intake Canal Level Instrument Channel I Was Declared Inoperable to Allow Testing of Intake Canal Level Probe 1-CW-LE-102.Subject Probe Was Cleaned by Diver,Tested & Channel I Was Returned to Operable Status ML18153A3161998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Surry Power Station Units 1 & 2.W/980807 Ltr ML18152B7621998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Surry Power Station,Units 1 & 2.W/980707 Ltr ML18153A2581998-06-0303 June 1998 LER 98-009-00:on 980509,nonisolable Leak of Reactor Coolant Pump Seal Injection Line Weld,Was Discovered.Caused by Lack of Fusion or Thermal Fatigue Coupled W/Vibration Stress Due to Loose Rod Hanger.Rcp Seal Injection Line Removed ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML18153A3141998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Surry Power Station,Units 1 & 2.W/980610 ML18152B8241998-05-22022 May 1998 LER 98-008-00:on 980228,auxiliary Ventilation Fans Were Noted in Condition Outside of Design Basis.Caused by Failure to Recognize Potential Impact of Certain Design Basis Accident Scenarios.No Corrective Actions Needed ML18152B8161998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Surry Power Station Units 1 & 2.W/980508 Ltr ML18152B7951998-04-29029 April 1998 LER 98-007-00:on 980330,radiation Monitors Were Declared Inoperable.Caused by Change in Operating Temperature Range. Preplanned Alternate Method of Monitoring Was Initiated IAW TS Table 3.7-6 ML18153A2511998-04-22022 April 1998 LER 98-006-00:on 980324,unisolable Through Wall Leak of RCP Thermowell Was Noted.Cause of Leak Is Unknown.Rtd Will Be Replaced ML18153A2521998-04-22022 April 1998 LER 98-005-01:on 980212,fire Watch Insp Exceeded One Hour. Caused by Lack of Attention to Detail by Individual Involved.Individual Involved Was Coached on Requirement to Perform Fire Watch Patrols within Required Time Frame ML20217P9941998-04-0707 April 1998 Safety Evaluation Granting Licensee Third 10-yr Inservice Insp Program Relief Requests SR-018 - Sr-024 ML18153A2951998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sps,Units 1 & 2.W/ 980408 Ltr ML18153A2391998-03-13013 March 1998 LER 98-005-00:on 980212,fire Watch Insp Frequency Exceeded One H Occurred.Category 2 Root Cause Evaluation Being Conducted to Determine Cause of Event.Station Deviation Issued ML18153A2341998-03-0909 March 1998 LER 98-003-00:on 980226,no Procedural Guidance for Maintaining EDG Minimum Fuel Supply During Loop,Was Identified.Caused by Absence of Procedural Instructions. Deviation Rept Submitted to Document Deviating Condition ML18153A2301998-03-0606 March 1998 LER 98-004-00:on 980206,fire Watch Was Released Prematurely Resulting in Violation of Ts.Caused by Inadequate Planning of Repair Activity.Work Orders Will Include Ref to Applicable Procedures Developed to Assist in Repairs ML18153A2251998-03-0404 March 1998 LER 98-002-00:on 980202,automatic Turbine Trip Resulted in Automatic Reactor Trip.Caused Degraded Generator Voltage Regulator sub-component Failure.Placed Plant in Safe Hot SD & Replaced Intermittent Relay & Relay Socket 1999-09-30
[Table view] |
Text
- ' ~ ~:, .. .-;-:::.:* *,;. *- -- ':**.
. POW 34:..04
/* ... e e VIRGINIA ELECTRIC AND POWER COMP ANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT 87-11 APPROVED: ~L ~~
STATIONMAAGER
. :'f -'.. - -... .: **:.;:.- -,-. *.**.-... *--:-=.,_
e 1 SECTION PAGE Operating Data Report - Unit No. l 01 Operating Data Report - Unit No. 2 02 Unit Shutdowns and Power Reductions - Unit No. 1 03 Unit Shutdowns and Power Reductions - Unit No. 2 04 Average Daily Unit Power Level - Unit No. 1 05 Average Daily Unit Power Level - Unit No. 2 06 Summary of Operating Experience - Unit No. 1 07 Summary of Operating Experience - Unit No. 2 07 Facility Changes Requiring NRG Approval 08 Facility Changes That Did Not Require NRG Approval 09 Tests and Experiments Requiring NRG Approval 10 Tests and Experiments That Did Not Require NRC Approval 11 Other Changes, Tests and Experiments 12 Chemistry Report 13 Fuel Handling - Unit No. 1 14 Fuel Handling - Unit No. 2 15 Procedure Revisions That Changed the Operating Mode Described in the FSAR 16 Description of Periodic Test Which Were Not Completed Within the Time Limits Specified in Technical Specifications 17
OPERilING DAL\ REPORT DOCKET NO. 50-280 DAn: 12/4/87 COMPLEIED BY L. A. warren TELEPHONE 804-35 7-3184 OPERAIING Sl:AIUS
- 1. Unit Name: Surry Unit 1 Notes
- 2. Reporting Period: ll/Ol/87 to 11/30/87
- 3. Licensed Thermal Power (MWt): 2441
- 4. Nameplate Rating (Gross MWe): -84..,..7""'.""'"5_ _ _ _ __
- 5. Design Electrical Rating (Net HWe): 788
- 6. Maximum Dependable Capacity (Gross HWe): 820
- 7. Maximum Dependable Capacity (Net MWe): 781
- 8. If Changes Occur in Capacity Ratings (Items Number 3 lbrough 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720.Q SQ 16. a 130968 0
- 12. Number of Hours Reactor Was Critical 601. 6 5468.3 8401J.6
- 13. Reactor Reserve Shutdown Hours o.o 0.0 JZH. :i
- 14. Hours Generator On-Line 601.5 5423.3 82277 I 6
- 15. Unit Reserve Shutdown Hours 0.0 o.o 3736.2
- 16. Gross Thermal Energy Generated (MWH) 1459400.6 12958784.1 191031642.6
- 17. Gross Elect.rical Energy Generated (MWH) 494080.0 4308930.0 61806848.0
- 18. Net Electrical Energy Generated (MWH) 470286 4092185.0 58614156.0
- 19. Unit Service Factor 83.5% 67. 7% 62.8%
- 20. Unit Available Factor 83.5% 67. 7% 65. 7%
- 21. Unit Capacity Factor (Using MDC Net) 83.6% 65.4% 57.9%
. 22. Unit Capacity Factor (Using DER Net) 82. 9% 64.8% 56.8%
- 23. Unit Forced Rate 16~5% 17 .6% 17. 7%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Refueling Outage AQril 8 1 48 days
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRITICALITY INI?IAL ELECIRICITY COMMERCIAL OPERATION (9/77)
OPERATING DAU REPOR'.r DOCKET No. _.;;.5....
0-_2_0_1_ __
DATE ____1~2:.i. ./4""'/. : 8c.:. 7___
COMPLE'.IED BY L, A, warren IELEPHONE 804-357-3184 OPERATING SLUUS
- l. Unit Name: Surry Unit 2 Notes
- 2. Reporting Period: 11/01/87 to 11/30/87
- 3. Licensed thermal Power (MWt): _.:::.2.a1-4.1;.4.!,. l______
- 4. Nameplate Rating (Gross MWe): _,.,8.1;.4"""7,~5~-----
- 5. Design Electrical Rating (Net MWe): 788
- 6. Maximum Dependable Capacity (Gross MWe): 820
- 7. Maximum Dependable Capacity (Net MWe): 781
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 720.0 8016.0 127848.0
- 12. Number of Hours Reactor Was Critical 720.0 6149.0 84259.8
- 13. Reactor Reserve Shutdown Hours o.o 0.0 328.1
- 14. Hours Generator On-Line 720.0 6094.2 82934.6
- 15. Unit Reserve Shutdown Hours o.o o.o 0.0
- 16. Gross Ihennal Energy Generated (MWH) 1749200.9 14500880.7 194293354.3
- 17. Gross Electrical Energy Generated (MWH) 579940 4755145.0 63082969.0
- 18. Net Electrical Energy Generated. (MWH) 551944 4514985.0 59800509.0
- 19. Unit Service Factor 100% 76% 64.9%
- 20. Unit Available Factor 100% 76% 64.9%
- 21. Unit Capacity Factor (Using MDC Net) 98.2% 72.1% 6(:f .6%
- 22. Unit Capacity Factor (Using DER Net) 97.3% 71.5% 59.4%
- 23. Unit Forced Rate o.o 24 % 14.4%
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
Maintenance/Snyb~er Qutage Oei;:ember .§.- 2 l, l 9BZ
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to C0111Dercial Operation): Forecast Achieved INinAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (9/77)
- .... ' ........... ..~---' A----~.,
,,*.i PAGE 3 UNIT SHUIOOWNS AND POWER REDUCTIONS DOCKET NO. _...,,s,...o_-_28_0~-----
UNIT NAME __S_u_r_ry...._U ___n_it......l _ _ __
REPORI OONTH November 1987 DA"'E 12/04/87 COMPLETED.....BY --~L__._A_._V__J..;a;::.r,_r.::;e.:. :n.....____
TELEPHONE __8_0_4_-_3_5_7-_3_1_8_4___ X_3_s_s_*~
... Cl D .
C .,
D .,
~
N C
D C ~ LICENSEE E :r C
II in II D 'D II II II
. C I)
NO. DATE a. II
- , II D I)
EVENT .. 'D D 'D CAUSE & CORREC'IIVE ACTION tO
>, D II .r: :::, ex II D a. D I- :::, J:
~
II ex II .r: C REPORI # ~ CJ E D
CJ PREVENT RECURRENCE 0 Ill
- E: 3 CJ D
0
",: ~
87-09 11-3-87 s o.o B Unit was reduced to 72% power, 590 ~1W s to 11 allow performing PT-29. l "Turbine Valve Cycling Test."
87-10 11-25-87 F 118. 5 A 1 Unit was shutdown ctue to a leak on 11 C 11 S/G )
Secondary fl*1anway. Manway was replaced and unit returned to service. ,'.,
- t I
e 1{t I!
II;
(:*i l 2 3 F: Forced Reason: Method: Exhibit G - lnst1'Uctions S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or test 2 - Manual Scram. Entry Sheets for Licensee C - Refueling 3 - Automatic Scram. Event Report (LER) File D - Regulatory Restriction 4 - Other (Explain) (NUREG 0161)
E - Operator Training & License Examination 5
F - Administrative Exhibit l - Same Source G - Operational Error (Explain)
(9/77) H - Other (Explain)
PAGE4 0 1
UNIT SHUI'DOWNS AND POWER REDUCTIONS 28
- ry D~~T N~ ---~-~__ b. n""1. .t. __2______*J DATE 12/4/87 ~
COMPLETED BY L. A. Warren '),
REPORT MONTH November 1987 TELEPHONE 804-357-3184 X355 *~:
~.:
... .... "'0 ...
.~
C
-I) 0
~
II N
C 0
0 1J Cl
....C m
...... u LICENSEE eI)
- r I)
C I)"'
NO. DATE 0.
m
~
0
- x:
m I)
Ill 0
.c I)
.c I)
Ill C
EVENT REPOR:r m
~o 1J o
C 0
0.
e0 ID 1J 0
0 CAUSE & CORRECTIVE ACllON IO PREVENT RECURRENCE 0 CD
- f: >
0 0 ;
0 .\
'J e
\
NO \JE DURING THIS PERIOD .. I I
f"
\
I
.\
- i<
..~-
1 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Teet 2 - Manual Scram. Entry Sheets for Licensee C - Refueling 3 - Automatic Scram. Event Report (LER) File D Regulatory Restriction 4 Other (Explain) (NllREG 0161)
E - Operator Training & License Examination 5
F - Administrative Exhibit 1 - Same Source G - Operational Error (Explain)
(9/77) H - Other (Explain)
e e AVERAGE DAILY UNIT POWER LEVEL OOCKE'l NO.
UNIT
~-------
50-280 Surry Unit 1 DATE 12/04/87 COMPLETED BY L. A. warren
'l'ELEPHONE 804-357-3184
~NTH November 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 789 17 791 2 788 18 789 1 785 19 789 4 786 20 789 5 785 21 787 6 788 22 783 7 789 21 781 8 788 24 765 9 788 25 719 10 789 26 6 11 790 27 0 12 791 28 0 11 791 29 0 14 791 10 0 1'5 790 11 16 791 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
'" ~ ..
e e AVERAGE DAILY UNI'! POWER LEVEL DOCKE'! NO. 50-281 mm:
---=~"""'-------
Surry Unit 2 DAIE 12/04/87 COMPLE'IED BY L. A. Warren TELEPHONE 804-357-3184 X355 MON'!H November 1!1B7 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 769 17 766 2 769 18 764 1 768 19 763 4 764 20 766 5 767 21 769 6 768 22 769 7 768 21 768 8 768 24 769 9 767 25 768 10 766 26 764 11 765 27 764 12 769 28 765 11 768 29 764 14 766 30 764 15 766 11 767 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
- ' . ~ .-~-,~-a *,.
e e
SUMMARY
OF OPERATING EXPERIENCE MONTH/YEAR _----=.N.:....;O:;...;V;.;;;;E=M=B=E=R.:......::.::19=8~7 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT ONE 11-01-87 0000 This reporting period begins with the unit at 100% power, 830 MW's.
11-03-87 1107 Commenced rampdown to allow performing PT-29.1 at 150 MW/hr.
1239 Holding power at 72%, 590 MW's.
1331 Commenced power increase at 150 MW /hr.
1540 Unit at 100% power, 830 MW's.
11-25-87 2001 Commenced rampdown for repair of 11 C 11 S/G Manway at 150 MW /hr.
11-26-87 0129 Generator off the line.
0135 Manually tripped reactor for shutdown.
0435 Commenced plant cooldown.
1000 RCS < 350°F, 450 psig.
2234 RCS< 200°F.
11-30-87 2400 This reporting period ends with the unit at CSD on RHR.
UNIT TWO 11-01-87 0000 This reporting period begins with the unit at 100% power, 810MW's.
11-08-87 1135 New run-time record for Virginia Power set by Surry Unit II, breaking the old record set by North Anna of 216 days, 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br />, and 58 minutes.
11-30-87 2400 This reporting period ends with the unit at 100% power, 810 MW's.
e e F AGILITY CHANGES REQUIRING NRC APPROVAL MONTH/YEAR NOVEMBER 1987 NONE DURING TIIlS PERIOD
e e PAGE 9 FACII.JTY CHANGES THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR _ _ _ _ N_O_V_E_M_B_E_R_1_9_87_ _
NONE DURING TlllS PERIOD
.! ,.*.,,-._.~ '--**-
PAGE 10 e e TESTS AND EXPERIMENTS REQUIRING NRC APPROVAL MONTH/YEAR
- - -NOVEMBER
1987 NONE DURING TIIlS PERIOD
PAGE 11 e e TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRC APPROVAL MONTH/YEAR _______ __
NOVEMBER_;;;_,,;:_..::...;_
1987 NONE DURING TIIlS PERIOD
-*~**** ..... -.:
. . *::.:-~. . :**, ~ .. _:;:: ,** : ....
e e OTHER CHANGES. TEST AND EXPERIMENTS MONTH/YEAR NOVEMBER 1987 NONE DURING TIIlS PERIOD
e VIRGINIA POWER SURRY POWER STATION CHEMISTRY REPORT
_ _-.:.:N..;:O;..:.V-=E~M-=-=B~E~R~- 19 87 PRIMARY COOLANT ANALYSIS UNIT NO. 1 UNIT NO. 2 MAX. MIN. AVG. MAX. MIN. AVG.
Gross Radioact., uCi/ml 1. 36E+O 1.00E-3 9.45E-l ?_ _ ATJ:;'_ l .. ~hl:'- l ?. .. 1 7F.- 1 Suspended Solids, ppm o.o o.o o.o o.o o.o o.o Gross Tritium, µCi/ml l.20E-l 1. 02E-l l.09E-l 1. 97E-l L65E-l 1~80E-l 131 9.82E-l 4. 77E-3 Iodine , uCi/ml l.12E-l l.18E-: l. lOE-4 9.32E-4 1111 / 1111 0.19 0.10 0.13 0.22 0.18 0.20 Hydrogen, cc/kg ~0.3 31.5 t35.2 ~7. 4 '5. 0 25.9 Lithium, ppm 0.87 0.53 0.76 Ll6 0~93 L03 Boron-10, ppm* 320.3 49.9 112.1 109.6 94.1 101. 7 Oxygen, (DO), ppm 0.005 0.005 0.005 0.005 0~005 0.005 Chloride, ppm 0.010 0.001 0.005 0~010 0.001 0.005 pH@ 25 degree Celsius 6.81 5.62 6.62 6.64 6~51 6.57
- Boron-10 = Total Boron X 0.196 REMARKS: Unit 1: The CAT bed was placed in service for lithium removal on 11-25-87 at 0130 and removed from service on 11-25-87 at 0409. On 11-25-87 at 2001 the unit began rampdown to cold shutdown to repair steam leak on 11 C 11 steam generator manway.
Unit 2: The CAT bed was placed in service on 11-08-87 at 2145 and removed from service on 11-09-87 at 1815.
e e UNIT 1 FUEL HANDLING DATENovember 1987 NEW OR DATE NUMBER OF NEW OR SPENT SPENT FUEL SHIPPED OR ASSEMBLIES ASSEMBLY ANSI INITIAL FUEL SBIPPINC SHIPMENT# RECEIVED PER SHIPMENT I I ENRICHMENT CASK ACTIVI'n LEVEL NONE DUR [NG TIIlS PE lUOD
e e UNIT FUEL HANDLING DATE Nobember 1987 NEW OR DATE NUMBER OF NEW OR SPENT SPENT FUEL SHIPPED OR ASSEMBLIES ASSEMBLY ANSI INITIAL FUEL SHIPPING SHIPMENT I RECEIVED PER SHIPMENT I ENRICHMENT
' CASK ACTIVIT"i LEVEL NONE DURJ NG THIS PE UOD
. . **. *:. r .* :* ::***. ~. ..**
PAGE '16 --
e PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR MONTH/YEAR NOVEMBER 1987 NONE DURING TlilS PERIOD
. -- .::- -_-:-,*.::-- ;*;::,,:-._., ~-- ,_:-*.~:* .;_ -.
- e DESCRIPTION OF PERIODIC TEST WHICH WERE NOT COMPLETED WITHIN THE TIME UMITS SPECIFIED IN TECHNICAL SPECIFIC A TIO NS MONTH/YEAR November 1987 PT-24.SC Units 1 & 2 Smoke and Thermal Detectors -
Robershaw System
J VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261
- w. L. STEwAnT VICE PRESIDENT NUCLEAR OPERATIONS December 15, 1987 U. S. Nuclear Regulatory Commission Serial No.87-739 Attn: Document Control Desk NO/DAS:vlh Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37
\,
Gent 1emen,:
- VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of November 1987.
Very truly yours, Q\~.
W. L. Stewart Enclosure cc: U.S. Nuclear Regulatory Commission 101 Marietta Street, N. W.
Suite 2900 Atlanta, GA 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station