MONTHYEARML18152B3531999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Surry Power Station,Units 1 & 2.With 991012 Ltr ML18152B6651999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Surry Power Station Units 1 & 2.With 990915 Ltr ML18152B3791999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Surry Power Station,Units 1 & 2.With 990811 Ltr ML18152B3911999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Surry Power Station,Units 1 & 2.With 990713 Ltr ML18152B4341999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Surry Power Station,Units 1 & 2.With 990614 Ltr ML18152B4161999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr ML18152B6511999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 ML18152B7331999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Surry Power Station,Units 1 & 2.With 990310 Ltr ML18152B5421999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Surry Power Station,Units 1 & 2.With 990210 Ltr ML18152B6011998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Surry Power Station,Units 1 & 2.With 990115 Ltr ML18152B5721998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Surry Power Station,Units 1 & 2.With 981214 Ltr ML18152B6241998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Surry Power Station Units 1 & 2.With 981111 Ltr ML18152B6881998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Surry Power Station Units 1 & 2.With 981012 Ltr ML18153A3271998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Surry Power Station,Units 1 & 2 ML18153A3161998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Surry Power Station Units 1 & 2.W/980807 Ltr ML18152B7621998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Surry Power Station,Units 1 & 2.W/980707 Ltr ML18153A3141998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Surry Power Station,Units 1 & 2.W/980610 ML18152B8161998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Surry Power Station Units 1 & 2.W/980508 Ltr ML18153A2951998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sps,Units 1 & 2.W/ 980408 Ltr ML18153A2871998-02-28028 February 1998 Monthly Operating Repts for Feb 1998 for Surry Power Station,Units 1 & 2.W/980313 Ltr ML18153A3671998-01-31031 January 1998 Monthly Operating Repts for Jan 1998 for Surry Power Station,Units 1 & 2 ML18153A3521997-12-31031 December 1997 Monthly Operating Repts for Dec 1997 for Surry Power Station,Units 1 & 2.W/980113 Ltr ML18153A3861997-11-30030 November 1997 Monthly Operating Repts for Nov 1997 for Surry Power Station,Units 1 & 2.W/971211 Ltr ML18153A3981997-10-31031 October 1997 Monthly Operating Repts for Oct 1997 for Surry Power Station Units 1 & 2.W/971113 Ltr ML18153A4501997-09-30030 September 1997 Monthly Operating Repts for Sept 1997 for Surry Power Station,Units 1 & 2.W/971010 Ltr ML18153A4421997-08-31031 August 1997 Monthly Operating Repts for Aug 1997 for Surry Power Station,Units 1 & 2.W/970915 Ltr ML18153A4291997-07-31031 July 1997 Monthly Operating Repts for Jul 1997 for Surry Power Station,Units 1 & 2.W/970812 Ltr ML18153A4241997-06-30030 June 1997 Monthly Operating Repts for June 1997 for SPS.W/970711 Ltr ML18153A4161997-05-31031 May 1997 Monthly Operating Repts for May 1997 for Surry Power Station Units 1 & 2 ML18152A5521997-04-30030 April 1997 Monthly Operating Repts for Apr 1997 for Surry Power Station Units 1 & 2.W/970513 Ltr ML18153A4171997-04-30030 April 1997 Corrected Page 3 of 19 to MOR for Apr 1997 for Surry Power Station Unit 1 ML18152A4051997-03-31031 March 1997 Monthly Operating Repts for Mar 1997 for Surry Power Station Units 1 & 2.W/970414 Ltr ML18152A5121997-02-28028 February 1997 Monthly Operating Repts for Feb 1997 for SPS.W/970312 Ltr ML18153A4941997-01-31031 January 1997 Monthly Operating Repts for Jan 1997 for Surry Power Station,Units 1 & 2.W/970213 Ltr ML18152A4041996-12-31031 December 1996 Monthly Operating Repts for Dec 1996 for Surry Power Station Units 1 & 2.W/970110 Ltr ML18153A6441996-11-30030 November 1996 Monthly Operating Repts for Nov 1996 for Surry Power Station Units 1 & 2.W/961211 Ltr ML18153A6301996-10-31031 October 1996 Monthly Operating Repts for Oct 1996 for Surry Power Station Units 1 & 2.W/961114 Ltr ML18153A0861996-09-30030 September 1996 Monthly Operating Repts for Sept 1996 for Surry Power Station Units 1 & 2.W/961014 Ltr ML18152A5491996-08-31031 August 1996 Monthly Operating Repts for Aug 1996 for Surry Power Station Units 1 & 2.W/960913 Ltr ML18153A0421996-07-31031 July 1996 Monthly Operating Repts for Jul 1996 for Surry Power Station Units 1 & 2.W/960814 Ltr ML18153A0221996-06-30030 June 1996 Monthly Operating Repts for June 1996 for Surry Power Station Units 1 & 2.W/960711 Ltr ML18152A4031996-05-31031 May 1996 Monthly Operating Repts for May 1996 for Surry Power Station Units 1 & 2.W/960613 Ltr ML18153A4571996-04-30030 April 1996 Monthly Operating Repts for Apr 1996 for Surry Power Station Units 1 & 2.W/960513 Ltr ML18153A6871996-03-31031 March 1996 Monthly Operating Repts for Mar 1996 for Sps,Units 1 & 2. W/960412 Ltr ML18153A5291996-02-29029 February 1996 Monthly Operating Repts for Feb 1996 for SPS.W/960313 Ltr ML18153A5931996-01-31031 January 1996 Monthly Operating Repts for Jan 1996 for Surry Power Station.W/960212 Ltr ML18153A5741995-12-31031 December 1995 Monthly Operating Repts for Dec 1995 for Surry Power Station Units 1 & 2.W/960111 Ltr ML18153A5551995-11-30030 November 1995 Monthly Operating Repts for Nov 1995 for Surry Power Units 1 & 2.W/951212 Ltr ML18153A6691995-10-31031 October 1995 Monthly Operating Repts for Oct 1995 for Surry Power Station Units 1 & 2.W/951113 Ltr ML18153A7861995-09-30030 September 1995 Monthly Operating Repts for Sept 1995 for Surry Power Station Units 1 & 2.W/951013 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML18152B3531999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Surry Power Station,Units 1 & 2.With 991012 Ltr ML18152B6651999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Surry Power Station Units 1 & 2.With 990915 Ltr ML18152B4421999-08-27027 August 1999 LER 99-006-00:on 990802,determined That Plant Was Outside of App R Design Basis Due to Fire Barrier Deficiencies. Caused by Original Plant Design Deficiencies.Fire Watches Were Established & Mods Have Been Completed.With 990827 Ltr ML18152B4411999-08-27027 August 1999 LER 99-005-00:on 990731,effluent Radiation Monitors Were Declared Inoperable.Caused by Degraded Heat Trace Circuits for Monitors Sample Suction Line.Degraded Heat Trace Circuit Was Replaced & Addl Heat Trace Is Being Installed ML18151A3981999-08-13013 August 1999 SPS Unit 2 ISI Summary Rept for 1999 Refueling Outage. ML18152B3771999-08-13013 August 1999 LER 99-004-00:on 990714,TS Violation Due to non-safety Related Fans Effect on CR Boundary Was Noted.Cause of Event Has Not Yet Been Determined.Cable Spreading Room Doors Were Operned to Reduce Pressure in Rooms ML18152B3791999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Surry Power Station,Units 1 & 2.With 990811 Ltr ML18152B3911999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Surry Power Station,Units 1 & 2.With 990713 Ltr ML18152B4341999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Surry Power Station,Units 1 & 2.With 990614 Ltr ML20195E2401999-05-31031 May 1999 Rev 2 to COLR for SPS Unit 2 Cycle 16 Pattern Ag ML18152B4181999-05-18018 May 1999 LER 99-002-00:on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With 990518 Ltr ML18152B4161999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr ML18152B4111999-04-28028 April 1999 LER 99-003-00:on 990331,potential Loss of Charging Pumps Was Noted.Caused by Main CR Fire.Station Deviation Was Issued on 990331.With 990428 Ltr ML18152B6511999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 ML18153A2741999-03-29029 March 1999 LER 99-002-00:on 990301,prematurely Released Fire Watches Resulted in Violation of TS 3.21.B.7.Caused by Inadequate Procedure.Procedure for Opening & Sealing Fire Stops Was Revised on 990212 ML18153A2681999-03-19019 March 1999 LER 98-013-01:on 981122,turbine/reactor Tripped on High Due to Short Circuit in Summator for MSL C Loop Channel III Flow Transmitter.Replaced 1-MS-FT1494 Summator & Module Repair Procedure Revised.With 9903190 Ltr ML18152B7331999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Surry Power Station,Units 1 & 2.With 990310 Ltr ML18152B5421999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Surry Power Station,Units 1 & 2.With 990210 Ltr ML18151A3031999-01-29029 January 1999 ISI Summary Rept for 1998 Refueling Outage,Including Form NIS-1, Owners Rept for ISIs & Form NIS-2, Owners Rept for Repairs & Replacements. ML18152B7261999-01-21021 January 1999 LER 99-001-00:on 981222,auxiliary Feedwater Pipe Support Missed Surveillance.Caused by Personnel Error.Station Deviation Rept Was Submitted.Two Supports in Question Received Required Code Insp & Were Found Acceptable ML18152B6011998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Surry Power Station,Units 1 & 2.With 990115 Ltr ML18152B5781998-12-16016 December 1998 LER 98-014-00:on 981126,manual Reactor Trip in Response to Main Feedwater Regulating Valve Failure Occurred.Caused by Dislocation of Retaining Clip in Positioner.Control Room Operators Placed Unit in Safe,Shutdown Condition ML18152B5811998-12-16016 December 1998 LER 98-013-00:on 981122,turbine/reactor Trip on High SG Level Occurred.Caused by Instrument Failure.Control Room Operators Placed Unit in Safe,Shutdown Condition ML18152B7121998-12-0404 December 1998 LER 98-S01-00:on 981105,noted Failure to Deactivate Station Access Badge.Caused by Human Error.Licensee Will Now Deactivate Station Badges Before Clearance Is Revoked & Process for Badge Deactivations Have Been Strengthened ML18152B7041998-12-0101 December 1998 LER 98-012-00:on 981102,noted That EDGs Were Concurrently Inoperable.Caused by Required Testing Per TS 3.16.B.1.a.2. Redundant EDG Was Returned to Svc within Two Hour Period, Following Satisfactory Testing.With 981201 Ltr ML18152B7081998-11-30030 November 1998 Rev 0 to COLR for Surry 1 Cycle 16,Pattern Un. ML18152B5721998-11-30030 November 1998 Monthly Operating Repts for Nov 1998 for Surry Power Station,Units 1 & 2.With 981214 Ltr ML18152B6161998-11-0606 November 1998 LER 98-011-00:on 981008,diesel Driven Fire Pump Failed to Start During Performance of Monthly Operability Test.Caused by Faulty Overspeed Trip Device Failure.Diesel Driven Fire Pump Declared Inoperable ML18152B6241998-10-31031 October 1998 Monthly Operating Repts for Oct 1998 for Surry Power Station Units 1 & 2.With 981111 Ltr ML18152B6081998-10-23023 October 1998 LER 98-010-01:on 980715,intake Canal Level Probes Were Inoperable Due to Marine Growth.Caused by Design of Canal Level Instrumentation.Canal Level Probes Will Continue to Be Monitored More Closely ML18152B6881998-09-30030 September 1998 Monthly Operating Repts for Sept 1998 for Surry Power Station Units 1 & 2.With 981012 Ltr ML18153A3271998-08-31031 August 1998 Monthly Operating Repts for Aug 1998 for Surry Power Station,Units 1 & 2 ML18152B7811998-07-31031 July 1998 LER 98-010-00:on 980715,low Intake Canal Level Instrument Channel I Was Declared Inoperable to Allow Testing of Intake Canal Level Probe 1-CW-LE-102.Subject Probe Was Cleaned by Diver,Tested & Channel I Was Returned to Operable Status ML18153A3161998-07-31031 July 1998 Monthly Operating Repts for July 1998 for Surry Power Station Units 1 & 2.W/980807 Ltr ML18152B7621998-06-30030 June 1998 Monthly Operating Repts for June 1998 for Surry Power Station,Units 1 & 2.W/980707 Ltr ML18153A2581998-06-0303 June 1998 LER 98-009-00:on 980509,nonisolable Leak of Reactor Coolant Pump Seal Injection Line Weld,Was Discovered.Caused by Lack of Fusion or Thermal Fatigue Coupled W/Vibration Stress Due to Loose Rod Hanger.Rcp Seal Injection Line Removed ML20248F7441998-05-31031 May 1998 Reactor Vessel Working Group,Response to RAI Regarding Reactor Pressure Vessel Integrity ML18153A3141998-05-31031 May 1998 Monthly Operating Repts for May 1998 for Surry Power Station,Units 1 & 2.W/980610 ML18152B8241998-05-22022 May 1998 LER 98-008-00:on 980228,auxiliary Ventilation Fans Were Noted in Condition Outside of Design Basis.Caused by Failure to Recognize Potential Impact of Certain Design Basis Accident Scenarios.No Corrective Actions Needed ML18152B8161998-04-30030 April 1998 Monthly Operating Repts for Apr 1998 for Surry Power Station Units 1 & 2.W/980508 Ltr ML18152B7951998-04-29029 April 1998 LER 98-007-00:on 980330,radiation Monitors Were Declared Inoperable.Caused by Change in Operating Temperature Range. Preplanned Alternate Method of Monitoring Was Initiated IAW TS Table 3.7-6 ML18153A2511998-04-22022 April 1998 LER 98-006-00:on 980324,unisolable Through Wall Leak of RCP Thermowell Was Noted.Cause of Leak Is Unknown.Rtd Will Be Replaced ML18153A2521998-04-22022 April 1998 LER 98-005-01:on 980212,fire Watch Insp Exceeded One Hour. Caused by Lack of Attention to Detail by Individual Involved.Individual Involved Was Coached on Requirement to Perform Fire Watch Patrols within Required Time Frame ML20217P9941998-04-0707 April 1998 Safety Evaluation Granting Licensee Third 10-yr Inservice Insp Program Relief Requests SR-018 - Sr-024 ML18153A2951998-03-31031 March 1998 Monthly Operating Repts for Mar 1998 for Sps,Units 1 & 2.W/ 980408 Ltr ML18153A2391998-03-13013 March 1998 LER 98-005-00:on 980212,fire Watch Insp Frequency Exceeded One H Occurred.Category 2 Root Cause Evaluation Being Conducted to Determine Cause of Event.Station Deviation Issued ML18153A2341998-03-0909 March 1998 LER 98-003-00:on 980226,no Procedural Guidance for Maintaining EDG Minimum Fuel Supply During Loop,Was Identified.Caused by Absence of Procedural Instructions. Deviation Rept Submitted to Document Deviating Condition ML18153A2301998-03-0606 March 1998 LER 98-004-00:on 980206,fire Watch Was Released Prematurely Resulting in Violation of Ts.Caused by Inadequate Planning of Repair Activity.Work Orders Will Include Ref to Applicable Procedures Developed to Assist in Repairs ML18153A2251998-03-0404 March 1998 LER 98-002-00:on 980202,automatic Turbine Trip Resulted in Automatic Reactor Trip.Caused Degraded Generator Voltage Regulator sub-component Failure.Placed Plant in Safe Hot SD & Replaced Intermittent Relay & Relay Socket 1999-09-30
[Table view] |
Text
. , v.
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION MONTHLY OPERATING REPORT REPORT 87-12 APPROVED: Jwin:ct. ;t_ $ ~
STATION MANAGER r 8802030027 871231 F-~
1 kDR ADOCK 05000280 PDij. 1
i SECTION PAGE Operating Data Report - Unit No. l 1 Operating Data Report - Unit No. 2 2 Unit Shutdowns and Power Reductions - Unit No. l 3 Unit Shutdowns and Power Reductions - Unit No. 2 4 Average Daily Unit .Power Level- Unit No. l 5 Average Daily Unit Power Level - Unit No. 2 6 Summary of Operating Experience - Unit No. 1 7 Summary of Operating Experience - Unit No. 2 7 Facility Changes Requiring NRC Approval 8 Facility Changes That Did Not Require NRC Approval 9 Tests and Experiments Requiring NRC Approval 10 Tests and Experiments That Did Not Require NRC Approval 11 Other Changes, Tests and Experiments 12 Chemistry Report 13 Fuel Handling - Unit No. 1 14 Fuel Handling - Unit No. 2 15 Procedure Revisions That Changed the Operating Mode 16 Described in the FSAR Description of Periodic Test Which Were Not Completed Within 17 the Time Limits Specified in Technical Specifications
I,
- e PAGE 1 OPERA?ING DUA REPORl:
DAl'E COHPIZrED BY DOCKET NO. _.......,50,...,.-.:.:;2~80~-
1/6/88 L.A. Warren TELEPHONE --=0"""'04.,. ._. , .3;,,;.;57"-3;..;. 1;;;;.04~
OPERATING STArUS -------
- 1. Unit Name: Surry Unit 1 Notes
- 2. Reporting Period: Dec. 01 thru Dec. 31 1 1987
- 3. Licensed Ihe1'111&1 Power (MWt): 2441
- 4. Nameplate Rating (Gross MWe): 847.5
- 5. Design Electrical Rating (Net MWe): _7_8_8_...,._..,....---
- 6. Maximum Dependable Capacity (Gross MWe): 820
- 7. Maximum Dependable Capacity (Net HWe): . 781
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9, Power Level To Which Restricted, If Any (Ne*t HWe):
- 10. Reasons For Restrictions, If Any:
Ibis Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.0 8760.0 131712.0
- 12. Number of Hours Reactor Was Critical 709.9 617811 8422~.4
- 13. Reactor Reserve Shutdown Hours o.o o.o 3ZZ4.5
- 14. Hours Generator On-Line 693.6 6116.9 82921 I 2
- 15. Unit Reserve Shutdown Hours o.o 0.0 3736.2
- 16. Gross Ihetmal Energy Generated (MWH) 1688578.8 14647362.9 192720221.4
- 17. Gross Electrical Energy Generated (MWB) 568325.0 4877255.0 62375173.0
- 18. Net Electrical Energy Generated (MWH) 541220.0 4633405.0 59155376.0
- 19. Unit Service Factor 93.2% 69.8% 63%
- 20. Unit Available Factor 93.2% 69.8% 65.8%
- 21. Unit Capacity Factor (Using MDC Net) 93.1% 67. 7% 58.1
- 22. Unit Capacity Factor (Using DER Net) 92.3% 67.1% 57.%*
- 23. Unit Forced Rate 6.8% 16.9% 17 .6%
- 24. Shutdowns Scheduled Over Next 6 Months (!ype, Date, and Duration of Each):
Refueling Outage April 8, 48 Days
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIAL CRil'ICALil'Y IN!l'IAL ELECTRICITY COMMERCIAL OPERATION (9/77)
e e PAGE 2 OPERArlNC DAIA REPOltt ooaa:r IIO. _,...50...,.-..;;;2;.;.8~1_ _
DA?!
<XlfPLE'tED BY
-~----;..;;..--
1/06/88 L. A. Warren l'!LEPBONE 804-357-3184 OPERAI'ING S'tAIUS
- 1. Unit Nue: Surry Unit 2 Motes
- 2. Reporting Period: Dec. 01 thru Dec, 31, 1987
- 3. Licensed Ihennal Power (HWt): 2441
- 4. Nameplate Rating (Gross Mile): 847.5 5.
6.
Design Electrical Rating (Met HWe): 788 Muimwll Dependable Capacity (Gross HWe): 820
- 7. Maximum Dependable Capacity (Net MWe): 781
- 8. If Changes Occur in Capacity Ratings (Items Number 3 l'hrough 7) Since Last Report, Give Reasons:
- 9. Power Level To Which Restricted, If Any (Net MWe):
- 10. Reasons For Restrictions, If Any:
Ihis Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period 744.0 8760.0 128592.0
- 12. Number of Hours Reactor Was Critical 406.2 6555.2 84666.0
- 13. Reactor Reserve Shutdown Hours o.o o.o 328.1
- 14. Hours Generator On-Line 363.7 6457.9 83298.3
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Ihet111al Energy Generated (MW) 877008.4 15377889.1 195170362.7
- 17. Gross Electrical Energy Generated (MWH) 289855.0 5045000.0 63372824.0
- 18. Net Electrical Energy Generated (!Ml) 275968.0 4790953.0 60076477.0
- 19. Unit Service Factor 48.9% 73. 7% 64.8%
- 20. Unit Available Factor 48.9% 73. 7% 64.8%
- 21. Unit Capacity Factor (Using MDC Net) 47 .5% 70% 60.0
- 22. Unit Capacity Factor (Using DER Net) 47.1% 69.4% 59.3%
Unit Forced Rate 0 22.9% 14.4%
23.
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
- 25. If Shut Down At End Of Report Period Estimated Date of Startup:
- 26. Units In Test Status (Prior to C0111Dercial Operation): Forecast Achieved INITIAL CRITICALm IN1T1AL !L!C'l'IUCm COMMERCIAL OPERilION (9/77)
UN 1T Sll\n'OOWNS AND POWER REl>IIC1'1 ONR DOCKET NO. 50-28 0 UNIT NAME ---:S::-µ_r_r_y-:U~n-it_,.l_ _ __
DATE l /6/ 88 .
cOHPLE'IED sY ---:1~."'"A"""."--w-a_r_r_e_o____
December 1987 REPORl' MONTH
TELEPHONE 804-357-3184
C 0 N C
0 0
'O DI 0
.... *u C .,
LICENSEE E :r C IJ 111
...,. *. ::c IJ II
- , C II NO. DATE 0 0
.c II EVENT ..
II
'tJ D
D 'O CAUSE 6 CORRECIIVE ACIION tO
- a. D II :,
- , <<. .c REPORl' I ~u E U PREVEN'J: RECURRENCE 0
I 1/J C J
D u
D 0
87-10 12/01/87 F 50.4 A 1 Unit was shutdown due to a leak on Secondary manway. Manway was replaced 11 c 11 SIG e
and unit returned to service.
e l 2 3 4 r: Forced 'flea11on: Method: Exhibit G - lnstn,ctions Schedule d A - Equ 1pment ai 1ure (E Kp 1ai) n l - Manual for Pre p ar ation of Data S1 B - Halntenance or Ie11t 2 - Manual Scram, Entry Sheets for Licensee C - Refueling 3 - Automatic Scram. Event Report (LER) File D - Regulatory Re11triction 4 - Other (Explain) (N\JREG 0161)
E - Operator training 6 License Examination s
r- Administrative Exhibit 1 - Same Source G - Operational Error (Explain)
(9/77) H - Other (Explain)
_ PAGE 4 UNIT SH\Tl'OOWNS AND POWER REDUCTIONS 50 281 DOCKET NO. - - - - - - - - - - -
UNIT NAME _ _. .,S,_u,., r,. .,ry+-o.U.;;;.._n,;;,,;it.. .;;.2_._ __
DATE 1/6/88 COMPLETED BY ---=-1--.-:A~.~W.,..a_r_r_e_n____
REPORT MONTH December 1987
TELEPHONE _8_0_4_-_35~7_-._3.... 18_4=-----------
~
-II C
D -.
II N
C D
D Cl!
C D
u LICENSEE E :r C
11 on
'O II II II
... s:....
NO. DATE a. :J II D II EVEN! C II I-D
- I:
II II s:. :J IX II
'O D
D
- a. D
't:I CAUSE & CORRECTIVE ACTION TO 0
- J ~
IX II rn C REPORT~ ;:; (J E CJ D PREVENT RECURRENCE
- E )I (J D
0 87-09 12-08-87 s 380.3 H 1 Unit was shutdown for scheduled Maintenanc99 outage.
e l 2 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A - Equipment Failure (Explain) 1 - Manual for Preparation of Data B - Maintenance or Test 2 - Manual Scram. Entry Sheets for Licensee C - Refueling 3 - Automatic Scram. Event Report (LER) File D - Regulatory Restriction 4 - Other (Explain) (NUREG 0161)
E - Operator Training & License Examination F - Administrative s Exhibit 1 - Same Source G - Operational Error (Explain)
(9/77) H - Other (Explain)
e PAGE 5 AVERAGE DAILY UNrr POWER LEVEL DOCKET NO. 50-280 UNI'! Sura Unit 1 DAtE 1L6L88 COMPLE'IED BY L; A. wsu::i::~m
'r!LEPHONE 804-357-3184 K>N'.rB December 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 0 17 783 2 0 18 783
'3 665 19 782 4 786 20 784 5 787 21 782 6 786 22 781 7 786 23 782 8 781 24 782 9 781 25 782 10 784 26 781 11 785 27 783 12 786 28 783 l'3 787 29 787 14 788 '30 788 l '5 784 '31 788 16 783 INSTRUCTIONS On this form.at, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
e AVERAGE DAILY tlfIT POWER LEVEL 50_-_2=0_1~~~-
DOaErNO .......
PAGE 6 UNU' Surry Unit 2 om: 1/6/8 8 CCMPLEIED BY L. A. Warren
?ELEPBOHE 804-357-3184
!llN'l'B December 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 762 17 0 2 764 18 0 1 768 19 0 4 755 20 0 r:; 762 21 0 6 770 22 0 7 768 2'3 0 8 359 24 598 9 0 25 784 10 0 26 784 11 0 27 782 0 28 783 12 0 29 783 11 0 '30 781 14 0 11 780 1r:;
0 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
e PAGE 7
SUMMARY
OF OPERATING EXPERIENCE MONTH/YEAR _-=D=E=C=E.;;..;M=B=E=R'-'I:;..a9__8.;.._7 Listed below in chronological sequence by unit is a summary of operating experiences for this month which required load reductions or resulted in significant non-load related incidents.
UNIT ONE 12-01-87 0000 This reporting period begins with the Unit at CSD on RHR.
0805 RCS> 200° F.
1453 RCS > 350°F /450 psig.
12-02-87 1008 Reactor critical.
12-03-87 0224 Generator on line, increasing power at 150 MW /hr.
0909 Unit at 100% power, 830 MW's~
12-31-87 2400 This reporting period ends with the Unit at 100% power, 830 MW's.
UNIT TWO 12-01-87 0000 This reporting period begins with Unit at 100% power, 810 MW's.
12-08-87 0005 Commenced plant shutdown for scheduled outage.
0506 Generator off the line~
0523 Reactor shutdown.
1400 RCS < 350°F /450 psig.
12-09-87 0833 RCS< 200°F.
12-15-87 1800 RCS drained to mid-nozzle.
12-18-87 0148 RCS filled and vented.
2230 Bubble established in pressurizer~
12-21-87 0304 RCS> 200°F.
0956 RCS > 350°F /450 psig.
12-22-87 0655 Reactor critical.
12-24-87 0125 Generator on line, increasing power at 150 MW /hr.
1310 Unit at 100% power, 820 MW's.
12-31-87 2400 This reporting period ends with the Unit at 100% power, 820 MW's.
- PAGE 8 FACILITY CHANGES REQUIRING NRC APPROVAL MONTH/YEAR DECEMBER 1987 NONE DURING THIS PERIOD
_j
PAGE 9 FACIIJTY CHANGES THAT DID NOT REQUIRE NRG APPROVAL MONTH/YEAR _ _ _D_E_C_E_M_B_E_R_l_98_7_ _
S2-87-81 TV-SS-200B Administratively Closed 12/18/87 Failing TV-SS-200B closed evaluated based on its affect on DBA and dilution accident bases. It has been determined that the probability and the consequence of these accidents are not increased and an unreviewed safety question is not created.
SI-87-160 1-SI-P-lB Seal HD Tank Washer 12/10/87 Allowed using non CAT-I washer in seal head tank accumulator for 1-SI-P-lB.
EWR-87-193B Evaluate Removal of Low HP Turbine Delta P Trip Units 1 &2 EWR-87-205H Evaluate ES Piping fl.1iscellaneous/Unit 2 EWR-87-206A Evaluate SD Piping Miscellaneous/Unit 2 EWR-87-236B Addition of Drain for l-MS-PCV-102B/Unit 1 EWR-87-330A Evaluate EPH Main Transformers/Unit 2 EWR-87-337 Evaluate Capping FW Thermocouple/Unit 2 EWR-87-390 Evaluate of Acceptability for Chesterton Valve Packing Materials/Units 1 & 2 EWR-87-402 Evaluate RC Valve Parts/Units 1 &2 (1/2-RC-MOV-1590-1595/2590-2595)
EWR-87'.""404 Evaluate CH Valve (1-CH-FCV-l l 13A)/Unit 1 EWR-87-413 Suitability Evaluation for CH Valve (2-CH-276)/Unit 2 EWR-87-416B FW Loop Seal Pipe Repair/Unit 2
PAGE 10 e
TESTS AND EXPERIMENTS REQUIRING NRG APPROVAL MONTH/YEAR DECEMBER 1987 NONE DURING THIS PERIOD
PAGE 11 TESTS AND EXPERIMENTS THAT DID NOT REQUIRE NRG APPROVAL MONTH/YEAR _ _ _ _D_E_C_E_M_B_E_R_I9_8_7_ _
2-PT-1.1 NIS Trip Channel Test Prior to Start-up 2-ST-2 10 Steam Generator Auxiliary Feedwater Pump 2-FW-P-2
....... ;-_:.t* -
PAGE 12 e
OTHER CHANGES. TEST AND EXPERIMENTS MONTH/YEAR ________ D-=E=C-=E=M=B-=E,..,.R.._.1...,9....8..._7_
2-0P-3.1 2% Reactor Power to Hot Shutdown 2-0P-3.2 Unit Cooldown from HSD to 350/450 2-0P-3.3 Unit Cooldown from 350/450 to CSD
':.- .... ,~ .*
e VIRGINIA .POWER SURRY POWER STATION CRF.MISTRY REPORT
19 December 87 PRIMARY COOLANT UNIT NO. 1 UNIT NO. 2 ANALYSIS MAX. MIN. AVG. MAX. MIN. AVG.
Gross Radioact., µCi/ml L .60 E+O 2.90 E-2 8.46 E-1 8.59 E-1 ~.30 E-2 2.36 E-1 Suspended Solids. ppm o.o o.o o.o o.o o.o o.o Gross Tritium, µCi/ml 8.50 E-2 2.70 E-2 5.00 E-2 ~.15 E-1 4.40 E-2 1.57 E-1 131 Iodine * µCi/ml 2.93 E-2 4.39 E-3 8.30 E-3 1.04 E-3 3.35 E-~ 5.04 E-4 Il'31 / 11'3 l 0.18 0.10 0.14 0.23 0.07 0.15 Hydrogen, cc/kg 41.9 25.1 33.3 30.8 4.4(l) 22.5 Lithium, ppm 1.46 0.55 0.75 1.82 0.61 1.18 Boron-10. ppm* 289 33 66 252 85 169 Oxygen, (DO)* ppm <0.005 <0.005 <0.005 3.2< 2 > <0.005 0.225 Chloride, ppm <0.010 <0.001 0.003 <0.010 0.002 0.004 pH@ 25 degree Celsius 6.85 5.58 6.63 6.57 5.97 6.28
- Total Boron X 0.196 REMARKS: Unit 1: LiOH additions on 12-1-87@ 0125 (1510g); 12-2-87@ 0110 (910g);
12-2-87@ 1815 (275g); 12-4-87@ 1735 (324g). Total LiOH added - 3019g. Deborating bed placed in service for LiOH removal on 12-9-87 from 1451 to 1718; 12-14-87 from 1420 to 1603; 12-17-87 from 1825 to 1944; 12-27-87 from 1915 to 2115; 12-29-87 from 0440 to 0623. Unit 2: LiOH additions on 12-18-87@ 2000 (1300g); 12-22-87@ 0515 (350g). Total LiOH added - 1650g. CAT bed 1n service for LiOH removal on 12-27-87 from 1820 to 2243; 12-29-87 from 1030 to 1300; 12-31-87 from 0350 to 0640.
(1) Unit 2 was at 0% power and degassing (2) Unit 2 was at cold shutdown
UNIT _.._
e FUEL HANDLING
- PAGE 14 DATE Dec. 1987 NEW OR DATE NUMBER OF NEW OR SPENT SPENT FUEL SHIPPED OR ASSEMBLIES ASSEMBLY ANSI INITIAL FUEL SHIPPING RECEIVED PER SHIPMENT ENRICHMENT SHIPMENT#
' ' CASK ACTIVln LEVEL NONE DU UNG TIIlS P IERIOD
PAGE 15 e -e UNIT 2 FUEL HANDLING DATE Dec, 1987 NEW OR DATE NUMBER OF HEW OR SPENT SPENT FUEL SHIPPED OR ASSEMBLIES ASSEMBLY ANSI INITIAL FUEL SHIPPING SHIPMENT I RECEIVED PER SHIPMENT I I !NllICHtfENT CASK ACTIVIn
- .~. LEVEL NONE DUF lIN G TIIlS PJ RIOD
"°:-.. ,*.*. ~.,.,., ! * *. . . ,- ,.-***-~* : .** .,
PAGE 16 e
PROCEDURE REVISIONS THAT CHANGED THE OPERATING MODE DESCRIBED IN THE FSAR DECEMBER 1987 MONTH/YEAR --------
NONE DURING TIITS PERIOD
.. -~-.. : ._: -~ , .. - ... ,. . .:- .
PAGE 17 e e DESCRIPTION OF PERIODIC TEST WHICH WERE NOT COMPLETED WITHIN THE TIME LIMITS SPECIFIED IN TECHNICAL SPECIFICATIONS MONTH/YEAR DECEMBER 1987 NONE DURING TIBS PERIOD
e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261
- w. L. STEWART VICE PRESIDENT NUCLEAR 0PEBATI0NS January 15, 1988 U. S. Nuclear Regulatory Commission Serial No.88-007 Attn: Document Control Desk NO/DAS:vlh Washington, D. C. 20555 Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 Gentlemen:
VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS I AND 2 MONTHLY OPERATING REPORT Enclosed is the Monthly Operating Report for Surry Power Station Units 1 and 2 for the month of December 1987.
Very truly yours, Enclosure cc: U. S. Nuclear Regulatory Commission 101 Marietta Street, N. W.
Suite 2900 Atlanta, GA 30323 Mr. W. E. Holland NRC Senior Resident Inspector Surry Power Station