Application for Amends to Licenses DPR-32 & DPR-37,revising Audit Frequency of Station Security Plan to Occur at Least Once Per 12 Months.Safety Evaluation Encl.Fee Paid
ML18149A184
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/16/1986
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Rubenstein L
Office of Nuclear Reactor Regulation
Shared Package
ML18149A185 List:
References
86-365, TAC-61783, TAC-61784, NUDOCS 8606190419
Download: ML18149A184 (4)


Text

e e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWART V1cE PRESIDENT NUCLEAR OPERATIONS June 16, 1986 Mr. Harold R. Denton, Director Serial No.86-365 Office of Nuclear Reactor Regulation NO/PML/acm Attn: Mr. Lester S. Rubenstein, Director Docket Nos. 50-280 PWR Project Directorate No. 2 50-281 Division of PWR Licensing-A License Nos. DPR-32 U.S. Nuclear Regulatory Commission DPR-37 Washington, D.C. 20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 PROPOSED TECHNICAL SPECIFICATION REVISED AUDIT FREQUENCY OF THE STATION SECURITY PLAN Pursuant to 10 CFR 50. 90, Virginia Electric. and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for Surry Power Station Unit Nos.

1 and 2.

The proposed change would revise the Audit Frequency of Surry Power Station's Security Plan to occur at least once per 12 months instead of 24 months. This change would make the requirements of the Technical Specifications consistent with the requirements of 10 CFR 73.40(d) and Station practice.

The proposed change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and by the Safety Evaluation and Control Staff. As indicated in the attached Safety Evaluation, it has been determined that this request does not involve an unreviewed safety question as defined in 10 CFR 50.59 nor does it pose a significant hazards consideration as defined in 10 CFR 50.92.

We have evaluated this request in accordance with the criteria in 10 CFR 170.12. A voucher check in the amount of $150 is enclosed as an application fee.

Very truly yours, W. L. Stewart 8606190419 860616 PDR ADOCK 05000280 p PDR

e VIRGINIA ELECTRIC AND POWER COMPANY TO Harold R. Denton Attachments

1. Proposed Technical Specification Change
2. Safety Evaluation
3. Voucher Check cc: Dr. J. Nelson Grace Regional Administrator NRC Region I I NRC Senior Resident Inspector Surry Power Station Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219 Mr. Chandu P. Patel NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A

e COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND )

The foregoing* document was* acknowledged befo.re me, in and for the City and Commonwealth aforesaid, today by W. L. Stewart who is Vice President -

Nuclear Operations, of Virginia Electric and Power Company. He is duly authorized to . execute and file the foregoing document in behalf of that Company,

  • and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this \~ day of , 19 ~ lo

~\)Q1<..

....,---, 19 3C\

My Commission expires:

~~\-~(,,__~\\ \C)

. Nota~y Pu6lic (SEAL)

S/001

ATTACHMENT 1 PROPOSED TECHNICAL SPECIFICATION CHANGE

.SURRY POWER STATION UNIT NOS. 1 AND 2