From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18149A177 List:
References
86-199, NUDOCS 8606100202
Download: ML18149A176 (2)


Text

'*.*

e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261 W. L. STEWABT VICE PRESIDENT NUCLBAB 0PBBATIONS-

)

June 5, 1986 Dr. J. Nelson Grace Regional Administrator

. Region II U.S. _Nuclear_ Regulatory Commission Suite 2900 101 Marietta St., N.W.

Atlanta, Georgia 30323

Dear Dr. Grace:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 REVISIONS TO EMERGENCY PLAN IMPLEMENTI~G PROCEDURES Serial No.

NO/REB/acm Docket Nos.

License Nos.86-199 50-280 50-281 DPR-32 DPR-37 10 CFR 50.54(q) requires changes being made to the Emergency Plan, which do not require prior NRC approval, be submitted to the NRC within thirty days after the change is made.

Due to a clerical error, Revision 3 of Surry Power Station Emergency Plan Implementing Procedure (EPIP) - 2.02 was misplace~ during distribution.

When the error was discovered, Mr.

A. J. Ignatonis of your staff was notified.

We informed him that an internal audit of both the North Anna and Surry EPIPs would be performed to determine the extent of this problem. No $'4-milar problems were discovered with the North Anna EPIPs.

However, it was,determined that another Surry procedure, Revision O of Surry Power Statipn EPIP-4.27, had not been submitted within the thirty day requirement.

The Emergency Planning Staff has investigated these. incidents and has initiated the following measures to prevent recurrence.

Based upon station approval of a revision to an EP or EPIP, the Stat:j.on will be responsible to make an entry into the Commitment Tracking System (CTS) identifying the commitment to submit the revised procedure to the NRG within thirty days.

Concurrently, the Station Emergency Planning Staff will forward the revised procedure to Corporate Emergency Planning for processing and transmittal.

Together, these actions should prevent recurrence of the above mentioned oversights.

Enclosed find a copy of the Surry Power Station EPIPs 2.02 and 4.27 to

. update your files.

~**

W. L. Stewart Enclosures 0606100202 gt888~ao PDR ADOCK PDR F

,._i VIRGINIA ELECTRIC AND POWER COMPANY TO Dr. J. Nelson Grace cc:

Document Control Desk (2) '

Mr. Lester S. Rubenstein, Director (w/o enclosu~es)

PWR Project Directorate No. 2 Division of PWR Licensing-A NRC Senior Resident Inspector (w/o enclosures)

Surry Power Station Mr. Chandu P. Patel (w/o enclosures)

NRC Surry Project Manager PWR Project Directorate No. 2 Division of PWR Licensing-A

.,