Application for Amends to Licenses DPR-32 & DPR-37,changing Section 3.7, Instrumentation Sys & Section 4.1, Operational Safety Review, Per Generic Ltr 83-28.Fee Paid
ML18144A012
Person / Time
Site: Surry  Dominion icon.png
Issue date: 10/31/1985
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18144A013 List:
References
85-211C, GL-83-28, NUDOCS 8511140190
Download: ML18144A012 (3)


Text

/.

e e

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261

w. L. STEWART VICE PRESIDENT NUCLEAR OPERATIONS October 31, 1985 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U.S.

Nuclear Regulatory Commission Washington, D.

C.

20555 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNITS 1 AND 2 PROPOSED TECHNICAL SPECIFICATIONS CHANGES Serial No.

NO/EJL:acm Docket Nos.

License Nos.

85-211C 50-280 50-281 DPR-32 DPR-37 Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating License Nos. DPR-32 and DPR-37 for Surry Ptwer Station Units 1 and 2.

Our letter dated August 29, 1985 (Serial No. 85-211B) regarding your request for additional information for Generic Letter 83-28 Item 4.5.3 outlined our plan to propose changes to the Technical Specifications that would modify the surveillance intervals associated with several of the reactor trip functions. This is the follow-up to that letter.

We are proposing changes to Section 3. 7, Instrumentation Systems, and Section 4. 1, Operational Safety Review.

The proposed changes to Section 3.7 would reformat and upgrade Table 3.7-1, Reactor Trip Instrumentation Operating Conditions, to more closely conform to the Standard Technical Specifications.

The proposed changes to Section 4.1 would add a surveillance requirement for the reactor trip system interlocks and modify some of the surveillance requirements for portions of the reactor protection system instrumentation channels in accordance with Standard Technical Specifications and other appropriate source documents. Several other changes are also b.~ing proposed for this section of the Technical Specifications.

\\

The proposed changes to the Technical Specifications are provided in.

A discussion of the proposed changes to the Technical Specifications is provided in Attachment 2.

In accordance with 10 CFR Part 170 an Application Fee of $150 is also enclosed.

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Cqntrol Staff. It has b~en determin~d that this change does not pose an unreviewed safety

(

  • 85.11140190 851031.

1 PDR ADOCK 05000280 I

p PDR

e VIRGINIA ELECTRIC AND PowER COMPANY TO Mr. Harold R. Denton question as defined in 10 CFR 50. 5,9 and does not pose a significant hazards consideration as defined in 10 CFR 50. 92.

If you have any questions, or need additional information to process this request, please contact us.

Very truly yours, W. L. Stewart Attachments:

1.

Proposed Technical Specification Changes for Surry Units 1 and 2

2.

Discussion of Proposed Changes

3.

Application Fee cc:

Dr. J. Nelson Grace Regional Administrator NRC Region II Mr. D. J. Burke NRC Resident Inspector Surry Power Station Mr. Terence Chan NRC Project Manager-Surry Operating Reactors Branch No. 1 Division of Licensing Mr. Charles Price Department of Health 109 Governor Street Richmond, Virginia 23219

.I COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND

)

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by R.H. Leasburg who is Senior Vice President -

Engineering and Construction, of Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company; and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this ~\\

day of D~\\~~, 19 ~S" My Commission expires: \\=--e__~ h.,~i-'-'