ML18142A821

From kanterella
Jump to navigation Jump to search
R. E. Ginna - 04/26/1977 Letter Implementation of Procedures to Prevent Reactor Coolant Pump (RCP) Starts While in the Water Solid Condition
ML18142A821
Person / Time
Site: Ginna Constellation icon.png
Issue date: 04/26/1977
From: White L
Rochester Gas & Electric Corp
To: Schwencer A
Office of Nuclear Reactor Regulation
References
Download: ML18142A821 (2)


Text

NRC FQAM 195 y-ve)

U.S. NUCLEAR AEGUI.ATORYCO SSION NRC DISTRIBuTION FoR PART 50 DOCKET MATERIAL DOC++UMIIFR~

F ILE NUMBER TO:

~

Mr. Ai Schwencer..

FROM:

Rochester Gas

& Elect.

Corp'ochester, New York L. D. White Jri DATE OF OOCUMENT

'/26/77 OATE RECEIVED 4/29/77

~

TTE A RIGINAL OPY DESCRIPTION ONOTOAIZEO Nc LASS IF I E 0 PROP INPUT FORM ENCLOSURE NUMBER OF COPIES RECEIVED PLANT NAME:

Ginna No~ l (1-P.)

Ltri consisting of imformation regarding reactor coolant pump starts while in water solid condition. ~. ~ i

@gg!8@'

jgi3$

IIIIVi 0

RJL SAFETY SSEGNED AD:

FOR ACTiON/INFORMATION CTPi E

~

L C ASST PROJECT MANAGER LIC ASST 0

RC PDR OELD GOSSECK & STAFF MEPC HANAUER HARLESS LPDR ~

TIC:

NSIC:

SLB:

ACR G/

E PROJECT MANAGEMENT BOYD P

COLLINS HOUSTON PETERSON MELTZ HELTEMES SKOVHOLT INTERNALD SYSTEMS SAFETY HEINEMAN SCHROEDER ENGENEERENG MACARR BOSNAK SIHWEIL PAWL CK REACTOR SAFE ROSS NOVAK ROSZTOCZY CHECK

'AT& I RUTBERG EXTERNALDISTRIBUTION

'HAT LAB REG V IE LA PDR CON ULTANT !

IST RI BUTION PLANT SYSTEMS TEDESCO 0

IPPOLITO OPERATING REACTORS STELLO OPERATING TECH EISENHUT UL KSON OR S TE SAFE ERNST BALLARD YOUNGBLOOD SITE TECH GAKGLL STEPP HULMAN SITE ANALYSIS VOLLMER BUNCH J,

COLLINS KRE ER

,CG TROL NUMBER 77134OO21

ROCHESTER GAS AHD ELECTRIC CORPORATIOH

~

89 EAST AVEHUE, ROCHESTER, H.Y. I4649 LEON O WHITE. JR VICE ~IICS>PENT

+jglatOP(

S ~ - CiI April 26, 1977 Director of Nuclear Regulation ATTN:

Mr. A. Schwencer, Chief Operating Reactors Branch Cl U.

S. Nuclear Regulatory Commission Washington, D.

C.

20555 4

Dear Mr. Schwencer:

Your letter of April 1, 1977 requested that we implement procedures to prevent reactor coolant pump (RCP) starts while in the water solid condition or, in the event such starts could not be avoided, to include procedural steps to ensure that an acceptable reactor coolant system (RCS) temperature profile exists prior to starting a reactor coolant pump.

As discussed in our letter of February 24, 1977, there are times when reactor coolant pump starts are necessary while in the water solid condition.

Therefore we will revise our operating procedures to include non-optional prerequisite stdps while in a water solid condition to determine the reactor coolant system temperature profile before starting a reactor coolant pump.

Appropriate measures will be specified to achieve an acceptable profile prior to starting the pump.

In addition, we will conduct a review of our procedures to ensure that they are consistent with our February 24, 1977 submittal.

These procedural revisions and reviews will be completed prior to startup at the end of our present refueling and main-tenance outage.

Sincerely,

~

P.'.

L

'r(, P X

L. D. White, Jr.

LDW:af 7713400J1