ML18142A269

From kanterella
Jump to navigation Jump to search
Forwards Summary of 841109 Meeting W/Util at Region II Re 10CFR50 Fire Protection Reanalysis,Util Proposed Interim Collection Arrangement & Compensatory Measures for Reactor Coolant Pump Oil Leak Collection Capability
ML18142A269
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/14/1984
From: Olshinski J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8501180456
Download: ML18142A269 (3)


Text

..

DlEC 14 1984 Virginia Electric and Power Company ATTN:

Mr. W. L. Stewart, Vice President Nuclear Operations P. 0. Box 26666 Richmond, VA 23261 Gentlemen:

SUBJECT:

MEETING

SUMMARY

- DOCKET NOS. 50-280 AND 50-281 This letter refers to the meeting conducted at your request in the NRC Region II office on November 9, 1984.

The meeting related primarily to the 10 CFR 50.48 and 10 CFR 50 Appendix R Fire.Protection reanalysis for the Surry Facility.

Also discussed was VEPCO's proposed interim collection arrangement and asso-ciated compensatory measures for the Unit 1 reactor cool ant pump oi 1 1 eak collection capability. Enclosed is a summary of the meeting topics.

It is our opinion that this meeting was beneficial, and provided for a better understanding of the NRC's Fire 'Protection requirements and VEPCO's Appendix R reanalysis effort.

In accordance with Section 2.790 of NRC's "Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the Enclosure will be placed in NRC's Public Document Room.

Should you have any questions concerning this matter, we will be pleased to discuss them.

Enclosure:

Meeting Summary w/att cc w/encl:

Si nee rely, Original Signed by John A. Olshinski John A. Olshinski, Director Division of Reactor Projects J. H. Ferguson, Chief Operating Officer W. S. Mistr, Manager - Security R. F. Saunders, Station Manager bee w/encl:

NRC Resident Inspector Document Control Desk Commonwealth of Virginia Ri#

TEConlon 12/io /84 8501180456 12f4-- -

PDR ADOCK 05000280 F

PDR RIO~~

AHerdt 12/\\Cl /84

~

RI!

~.1 0, $1(1

'9

,fi p

1 VBrownlee IE...sr*

12/ ll /84 1~11,/y,1 12/1~ /84

e ENCLOSURE MEETING

SUMMARY

Licensee:

Virginia Electric and Power Company Facility: Surry Docket Nos.:

50-280 and 50-281 License Nos.:

DPR-32 and DPR-37 A management meeting was held in the NRG Region II office on November 9, 1984, to discuss VEPC0 1s 10 CFR 50.48 and 10 CFR 50 Appendix R Fire Protection reanalysis effort for the Surry facility.

The major items discussed in these areas are as follows:

Appendix R reanalysis completion schedule; Appendix R reanalysis modifications and their schedule for completion; requests for exemptions; modifi-cations for which completion may not meet current commitments, reasons and justifications for the delay, projected completion schedules, and compensatory measures.

Additionally, at this meeting VEPCO presented an outline of their proposal for an interim oil leak collection arrangement for a Unit 1 reactor coolant pump for one cycle of operation.

This proposal will be formally submitted to the Region at a later date.

Attachment:

Attendance Li st

)

,u ATTACHMENT ATTENDANCE LIST Attendance at the VEPCO/NRC Region II meeting on November 9, 1984:

VEPCO R. Hardwick, Manager, Nuclear Programs N. Clark, Director, Safety Evaluation and Control H. Miller, Assistant Station Manager J. Hegner, Licensing, Senior Staff Engineer L. Warnick, Fire Protection, Staff Engineer NRG Region II H. Dance, Chief, Reactor Projects Section 2A T. Conlon, Chief, Plant Systems Section W. Miller, Fire Protection Engineer G. Wiseman, Fire Protection Engineer P. Madden, Fire Protection Engineer B. Jones, Regional Counsel

,