Docket Nos. 50-280 and 50-281 March 1, 1985

  • MEMORANDUM FOR:

Roger D. Walker, Acting Director Division of Project and Resident Programs Region II FROM:

Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation Distribution Docket file ORB#l ROG NRC PDR

  • LPDR Memo file HThompson CParrish KJohnston DNeighbors GLainas

SUBJECT:

LICENSING ACTION REVIEWS FOR SURRY POWER STATION Your assistance is requested in conducting a review of the enclosed submittal from the Virginia Electric and Power Company, dated September 21, 1982, for Surry Power Station Units 1 and 2.

The product expected from you as a result of your reviews is a complete safety evaluation report.

Your reviewers should use the Standard Review Plan (SRP) and Standard Technical Specifications (STS) as guidance in determining acceptance criteria, recognizing, of course, that for operating reactors, the criteria in these documents are not requirements.

In accordance with NRR Office Letter No. 44, each safety evaluation performed by a technical division shall have a separate SALP input provided.

For purposes of these reviews, the Regional personnel involved are considered part of the technical divisions. Therefore, we are requesting that your forwarding memorandum contain a SALP input for each safety evaluation performed.

Work for the VEPCo submittal concerning the proposed changes has been discussed with W. Rankin of your staff.

The TAC numbers for the reviews are 56910 and 56911 for Surry 1 and 2, respectively.

The requested completion date is May 31, 1985.

Contact with the licensee on this review effort or any significant additional information deemed necessary should be obtained through the NRR Project Manager or with his concurrence.

The Project Manager for this plant is Don Neighbors and he can be reached at 492-4837.

Enclosure:

As stated ORB#l:DL:tf/. ~~rs KJohnston s

02/27/85

~ 5 8503120490 850301 PDR ADOCK 05000280 p

PDR Original signed bi Frank J. Icii:;.

0 aglia Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation BC~A AD,DL 1~ton SVarga GLa'i s

020--g/85 02~ /85 3///85

°';"'

(,

\\_..

Docket Nos. 50-280 and 50-281 MEMORANDUM FOR:

FROM:

SUBJECT:

e UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 March 1, 1985 Roger D. Walker, Acting Director Division of Project and Resident Programs Region II Hugh L. Thompson, Jr., Director Division of Licensing Office of Nuclear Reactor Regulation LICENSING ACTION REVIEWS FOR SURRY POWER STATION Your assistance is requested in conducting a review of the enclosed submittal from the Virginia Electric and Power Company, dated September 21, 1982, for Surry Power Station Units 1 and 2.

The product expected from you a~ a result of your reviews is a complete safety evaluation report.

Your reviewers should use the Standard Review Plan (SRP) and Standard Technical Specifications (STS) as guidance in determining acceptance criteria, recognizing, of course, that for operating reactors, the criteria in these documents are not requirements.

In accordance with NRR Office Letter No. 44, each safety evaluation performed by a technical division shall have a separate SALP input provided.

For purposes of these reviews, the Regional personnel involved are considered part of the technical divisions. Therefore, we are requesting that your forwarding memorandum contain a SALP input for each safety evaluation performed.

Work for the VEPCo submittal concerning the proposed changes has been discussed with W. Rankin of your staff. The TAC numbers for the reviews are 56910 and 56911 for Surry 1 and 2, respectively.

The requested completion date is May 31, 1985.

Contact with the licensee on this review effort or any significant additional information deemed necessary should be obtained through the NRR Project Manager or with his concurrence.

The Project Manage~ for this plant is Don Neighbors and he can be reached at 492-4837.

Enclosure:

As stated