Docket Nos. 50-280 and 50-281
.e UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555 Novemeber l*, 1984 LICENSEE:
Virginia Electric and Power Company (VEPCO)
FACILITY:
Surry Power Station, Unit Nos. 1 and 2
SUBJECT:
SUMMARY
OF MEETING HELD ON OCTOBER 24, 1984 TO DISCUSS APPENDIX R REANALYSIS STATUS The subject meeting was held in Bethesda, Maryland between NRC and VEPCO representatives. A list of attendees is attached.
The purpose of the meeting was to allow VEPCO to present to the staff the status of its Appendix R reanalysis.
VEPCO currently has a request for exemptions (July 6, 1984) and will supplement its request about November 30, 1984.
The enclosure provides details of the meeting.
Enclosures:
As stated cc w/enclosures; See next page
/s/JDNeighbors J. D. Neighbors, Project Manager Operating Reactors Branch #1 Division of Licensing OFFICE..... 9~
SURNAME *
- J~.i g,bbo.r. s.;.p.s........................................................................................................................
DATE..
- ..,. ~ -~
- V..~~. * * * * * * * * * * * * *"" * * * * "* * * * * * *" * * * * * * * * * * * *" * *"" * "* * *" * "" * * * * * """ * * *" * * * * * * *.. * * * * * * * *"" * * * * * * * "" * "" * *".. * * *
- NRC FORtvl 31_8 110/801 NRCM 0240 OFFICIAL RECORD COPY U.S. _GPO 1983-400*247..
. ~.
~ *-.- -*. - --~-:
~ l --,_\\*=****""*"***** **-**------- ---------*-*-.
-.* J._ _____ *~----~*- _:_, ***-*
I.
e Mr. W. L. Stewart Virginia Electric and Power Company cc:
Mr. Michael W. Maupin Hunton and Williams Post Office Box 1535 Richmond, Virginia 23213 Mr. J. L. Wilson, Manager Post Office Box 315 Surry, Virginia 23883 Donald J. Burke, Resident Inspector Surry Power Station U.S. Nuclear Regulatory Corrmission Post Office Box 166, Route 1 Surry, Virginia 23883 Mr. Sherlock Holmes, Chairman Board of Supervisors of Surry County Surry County Courthouse Surry, Virginia 23683 W. T. Lough Virginia Corporation Cormnission Division of Energy Regulation Post Office Box 1197 Richmond, Virginia 23209 Regional Radiation Representative EPA Region III Curtis Building - 6th Floor 6th and Walnut Streets Philadelphia, Pennsylvania 19106 Mr. J. H. Ferguson Executive Vice President - Power Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261 James P. 0 1 Reilly Regional Administrator - Region II U.S. Nuclear Regulatory Commission Suite 2900 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 James B. Kenley, M.D., Co1TTTiissioner Department of Health 109 Governor Street Richmond, Virginia 23219 e
Surry Power Station*
Units 1 and 2 Attorney Genera 1 1101 East Broad Street Rich~ond, Virginia 05602
I i
e e
- -** -**- --.:~:*.* *_:_ ** *--~---.' <.:.*_
- ----~----*-*:-
ENCLOSURE 1 LIST OF AT:TENDEES AT 10/24/84 APPENDIX R. MEET! NG.
NRC D. Neighbors P. Hearn J. Wilson J. Stang VEPCO E. Grecheck H. Blake R. Carroll R. Bayer H. Mi 11 er J. Hegner H. Fontecilla
i;,.
i 1
N w
c::
V) 0
_J u z w
/
VEPCQ.
SURRY POWER STATION APPENDIX.'R' MEETING
- Concerns
- *p1ans
- Schedules t
r I
,I
__,_ -............. --.--*--*-*'-""""""***---~----****-**-****"'""--***-.--*----4....... -.......,'.,..,. ___.,,.. *.. ' --
--~~~
-~...... _..,,...., *.* :. -~*.! ~*. ---~---
. \\
e e
INTRODUCTION 0
0 0
0 0
APPRECIATE THE OPPORTUNITY TO ~ET \\"IITH YOU TODAY TO DISCUSS THE STATUS OF APPENDIX RAT SURRY.
SPECIFICALLY:
- OUR CONCERNS
- OUR PLAN FOR RESOLVING THOSE CONCERNS IDENTIFYING THOSE ~tJDIFICATIONS WHICH CAN'T BE COMPLETED ON THE.
PREVIOUSLY IDENTIFIED SCHEDULES,
- AND TELLING YOU WHEN THEY WILL BE DONE, HAVE VEPCO PEOPLE INTRODUCE THEMSELVES (IF THIS HASN'T ALREADY OCCURRED)
THIS MEETING REPRESENTS VEPCO'S LATEST EFFORT ro MA.HITAIN OUR cmITINUING DIALOG WITH THE NRC ON THIS COMPLEX ISSUE,. SINCE OUR INITIAL MEETING IN JANUARY., 1984.,
WE'VE t,ET INFORrWJ.Y WITH YOU ABOUT ONCE A ~"ONTH.
THESE t*'l:ETINGS HAVE BEEN VERY BENEFICIAL, IN ADDITION., WE CONTINUE OUR DIALOGUE
't'HTH OTHER UTILITIES AND PLAN TO OBSERVE OTHER INSPECTIONS WHERE POSSIBLE, WE WANT TO CONTINUE TO MA.KE SURE THAT THERE ARE NO SURPRISES - NEITHER TO VEPCO NOR NRC - AND THAT VEPCO SENIOR MANAG8"1ENT HAS BEEN CLOSELY MJN ITOR ING OUR APPEND IX. R EFFORT I WE WISH TO DOONSTRATE THAT VEPCO CONTINUES TO WORK IN GOOD FAITH AND CONTINUES TO MA.KE OUR BEST EFFORT TO ACHIEVE COf'1iPLIANCE WITH APPENDIX R.
'. ~-***. *-*--...... __.......... ~~*-*-***-*******..... -..* u.... **--**-*'- *-..,..... -**,-e" --* -**
- ,:' *... '*' *. ~.. :.*.,. ~-,..,,*.~-*.....,,..,,,.,, -**
l....... ~-, ***, ***
- ----~
-~****. _.,,.,. *~*... -*
CHROi~OLDGY e
e 0
0 0
0 0
0 0
VEPCO'S INITIAL APPENDIX R ANALYSIS \\-/AS COMPLETED IN 1982.
IN 0cTOBER L983 WE EMBARKED ON A REANALYSIS AND MET WITH YOU IN JANUARY 1984 TO ADVISE YOU OF THE SCOPE AND SCHEDULES OF OUR REANALYSIS, WE MET WITH YOU ON JULY 3., 1984 TO DISCUSS THE STATUS OF APPENDIX RAT NORTH ANNA.
As \\'E COM"-1ITTED IN JANUARY., WE SUBMITTED DESCRIPTIONS OF r'ODIFICATIONS AND EXEMPTION REQUESTS FOR SURRY ON JULY 6., 1984. (THIS LATER BEC.AJ,1f KNOM'J AS OUR PHASE 1 SUE/'1ITIAL - PHASE 2 IS SCHEDULED FOR SLIBMITIAL BY Nov, 30)
THE CONCERNS WE IDENTIFIED FOR NORTH AANA ARE EQUALLY APPLICABLE TO SURRY:
- QUALITY AND SAFETY ARE OUR HIGHEST PRIORITIES, WE DON'T INTEND TO JEOPARDIZE EITHER., SOLELY TO MEET SCHEDULES,
- ALTHOUGH OUR RESOURCES AND t,1ANAGEMENT CAPABILITIES ARE CONSIDERABLE., THEY ARE NOT LIMITLESS, IN FACT., THE UORTH ANNA OUTAGES DID HAVE A DEFINITE IM.PACT ON SURRY ACTIVITIES, AND WE HAVE TO KEEP THINGS IN PERSPECTIVE, SUBSTANTIAL AS IT t,1AY SEEM AT TIMES., THE APPENDIX R WJRK IS ONLY ONE ASPECT.OF THE t,1ANY ACTIVITIES ONGOING DURING A REFUELING OUTAGE, ALL THESE ACTIVITIES ARE PLANNED., ESTIMATED, AND SCHEDULED, As YOU ARE AWARE., VEPCO HAS A FIVE YEAR PLAN FOR CAPITAL It-PROV8'ENT PROJECTS, APPENDIX R IS JUST ONE OF THESE ITEMS, THE FIVE YEAR PLAN INTEGRATES ALL THESE ACTIVITIES IN A PLANNED., STRUCTURED., AND CONTROLLED ~WINER.
LET ME FIRST DISCUSS THE RESOURCES THAT HAVE BEEN INVOLVED IN THE SURRY APPENDIX R EFFORT.
- ~-*** -
- ___,. _______, _______ :._i __.__,_.. : *...
e e
B~GINEERING MM1PO\\:JER SLIDE 0
0 0
THIS SLIDE IS AN UPDATE OF THE A/E AND VEPCO APPENDIX R tl\\ll.NHOURS/Ix)LLARS GRAPH PRESENTED AT THE JULY 3 NORTH ANNA PRESENTATION, THIS GRAPH REPRESENTS APPENDIX R ENGINEERING FOR BOTH NORTH ANNA AND SURRY, SINCE THE NORTH ANNA PRESENTATION., A/E DOLLARS SPENT FOR I\\PPENDIX R HAVE INCREASED BY APPROXIt-1ATELY 80% AND VEPCO ENGINEERING DOLLARS HAVE INCREASED BY APPROXIMATELY 50%,
THIS SLIDE IS CUMJLATIYE, PLEASE NOTE THE SLOPE OF THE CURVES, THE EXPENDITURE OF DOLLARS AND m-JPOWER HAS CONTINUED TO INCREASE AT THE S.C\\ME RATE AS SHOWN AT TI-iE JULY PRESENTATION, THE RATE OF INCREASE WAS APPROXIMATELY t5 MILLION PER MJNTH FOR JUNE TI-iRU SEPTEMBER 1984,
M~N\\-\\DUR~
120\\"
\\\\Ol'l I OOl'l 901<.
801<.
70"'
l>OK SOK 20K IOK L[f:i[NO
- A/E OOLLAR5 VIRG\\N\\I\\ /\\ND (LEC1R \\Ci POWER COMPANY APPENDIX ~R" ENG\\NEER\\NG
........... A/E MANHDUR~
VEPC.O f'\\ANHOUR~
VEPCO D0Ll~R5
~'
/
,r.**
~"....
_.,,,.. ~***
~...........
- 9-...... ~
~...............
~... ~.......
~...........
~..........
...........a.:
.. ~............
~............. --...
... ~......,.......... ~.................,-.:
DEti3 FEBB+
Mt\\RB4*
JUt\\B+
JULB+
REV. NO DESCRIPTION BY
~
DOLLARS "OCOK
~SOt>K.
500()1(.
45001'-. *-
4000"'
3500"'
3000~
25001'.
2000"'
ISOOI\\
.e
\\00{)1(,
5001'1 DRAWN DY PREL ISS DATE PLAN APR FINAL ISS DATE ENGRAPR PCN IOC::,0::,,:NS.:...:T ::..:APC:...R--'----1.
e SURRY CftP IT AL BUDGIT SLIDE 0
0 0
THE GROWTH OF THE APPENDIX R PERCENTAGE OF THE 1984 SURRY CAPITAL BlJDGET IS INDICATIVE OF VEPCO'S EFFORT TO r-EET OUR Cot'MITMENTS.
As OF JANUARY 1., 1984 $1.8.
MILLION WAS BUDGETED FOR APPENDIX R.
(THIS WAS BEFORE THE IM'ACT OF THE REANALYSIS EFFORT).
As OF SEPTEMBER lJ 1984J THE.PROJECTED AMJUNT TO BE SPENT FOR SURRY ON APPENDIX R THIS YEAR WAS $7,9
- MILLION, ALJloST A FOURFOLD INCREASE,
!50 45 40
......_3!5 0
C)
C) c, 30 0 Cl --
X 25 CJ) a::: zo
~
0 Cl HJ 10 SURRY CAPITAL BUDGET LEGEND
~
OTHER NRC REQUIREMENTS JANUARY 1. 1984 SEPTEMBER 1.1 984 PERIOD r:::1 NRC APPENDIX "R"
~*oTHI!:~.
l
--*---*-------------------------------~
t e
APPENDIX R ~'DDIFICATIONS AT SURRY 0
As OF MARCH 1., 1984 THERE WERE A TOTAL OF 15 APPENDIX R MJDIFICATIONS.
0 THESE ARE THE 7 CATEGORIES OF r,oniFICATIONS RESULTING FROM THE ORIGINAL 1982 ANALYSIS.
0 UPON INITIATION OF OUR APPENDIX R REANALYSIS., IT WAS IDENTIFIED THAT CHANGES TO THE ORIGINAL t'ODIFICATIONS WERE NECESSARY AND THAT ADDITIONAL t'ODIFICATIONS WERE NEEDED.
foR EXAfv1PLE., WE WERE ABLE TO:
CANCEL 3 ORIGINAL fvtlDIFICATIONS t1A.JOR RE\\\\IRITES OF 5 ORIGINAL MJDIFICATIONS r1o.JoR HEADINGS IN THE RIGI-IT HAND COLUM-J REPRESENT SOM: 31 ADDITIONAL rDDIFICATIONS.
IT HAS A~AYS BEEN VEPCO'S INTENTION TO COMPL..ETE THE APPENDIX Rf'IODIFICATIONS AS SOON AS POSSIBLE., AND VEPCO WILL C()fvFLETE ALL OF THE RB~INING ORIGINAL fvtlDIFICATIONS ACCORDING TO OUR COt'MITI-ENT DATES.
lbwEYER., WE CANNOT CCMPLETE ALL OF THE REANALYSIS r,,'ODIFICATIONS BY TI-IE TIME STIPULATED IN OUR.
ORIGINAL APPENDIX R COM'1111'1ENTS.
THE t'ODIFICATIONS AND THEIR SCHEDULES WILL BE DISCUSSED IN DETAIL LATER.
Appendix "R' Modli'fications at Surry Power Station Original 1982 Analysis Modifications EOG Control Isolation RCS Cold Leg Temperature Indications Steam.Generator Pressure Indications Excore Neutron Flux Monitoring System Emergency MCC Control Transformer Fuse Installation Emergency Switchgear Rooms (ESR) Halon System Vital Bus Main Breaker Replacement Appendix *n* Reanalysis Modifications ACS Hot Leg Temperature Indication In-Containment Instrument Cable Protection Remote Monitoring Panel Power Supply AHR Pump Radiant Energy Shield Charging Pump Cooling Water Radiators Emergency Lighting Upgrade Emergency Communications Upgrade ln-Coritainment Valves Spurious Operations Protection Main Steam System Valves Fire Protection ESR and Control Room Ventilation Auxiliary Building Ventilation RCS Pressure Control & Boron Addition Auxiliary Building Cable Tray Fire Stops CCW Pump Cable Repair Auxiliary Building Smoke Detectors Fire Damper lnprovements Fuel Oil Transfer Pump Manhole Cable Protection
- Appendix *n* DC Fuse Installation In-Containment Cable Tray Covers &
Fire Stops EDG #3 Power Isolation
e C!J,1ULATIVE Nlr:IBER OF MJDIFICATIONS AND CHJlNGES TO r-t)DIFICATIONS 0
0 0
THE NUtviBER OF NEW MJDIFICATIONS AND CrWJGES TO M)DIFICATIONS HAS CONTINUED TO CLIM3 SINCE ~CH., 1984.
Now ~-IE HAVE A CUMJL.ATIVE TOTAL OF 61 CHANGES, THIS GRAPH SHOWS TH:REANALYSIS TO BE A VERY DYl'W1IC PROCESS lliAT HAS GREATLY INCREASED THE APPENDIX R SCOPE OF ~RK TO BE PERFORMED DURING THE CURRENT l.L'JIT 1 REFUELING OUTAGE, FACK-UP GRAPH INCLUDES:
A.
THE 15 ORIGINAL M:JDIFICATIONS B.
CANCELLATION OF 3 ORIGINAL MJDIFICATIONS C.
OiANGES IN SCOPE FOR 5 ORIGINAL MJDIFICATIONS D,
M.AJOR REWRITES OF 5 ORIGINAL fvODIFICATIONS E.
31 NEW DCPs AND 8'./Rs RESULTING FROM THE REANALYSIS F, 2 APPENDIX R REPAIR PROCEDURES
60 55 50 45 40
(/)
z 2 35
~
"'t
~ 30 LL Q
0 25
- I 20 15
- 10.
5
.CUMULATIVE NO. OF MODIFICATIONS AND CHANGES TO MODIFICATIONS FALL FEB MAR APR MAY JUN JUL AUG SEP OCT 1982 1984 e
- +
SURRY UNIT 1 N'JN-APPENDIX R DESH1J CfW~GES AND EHR'S OOW IN PROGRESS 0
THIS GRAPH REPRESENTS THE STATION MJDIFICATIONS TAKING PL.ACE DURING THE REFUELING OUTAGE, As YOU CAN SEE THE AMJUNT OF 'M'.:lRK INV'OLVING STATION M)DIFICATIONS IS QUITE AMBITIOUS, 0
THE St,1ALL NUMBER OF ITEMS NOTED BY ASTERISKS ARE ITEMS THAT ARE NOT NRC REQUIRED,
Surry Unit 1 Non-Appendix *n*
Design Changes & Engineering Work Requests 'Now In Progress80-498 Radiation Monitors80-49C, D&E Technical Support Center 81-119C&D Data Acquisition Sys~ lnstl.
81-119H 81-1191' 82-09 EQ TSC Equipment lnstl.
Control Room Equip. lnstl.
Limit Switch Replacement 82-35 GDC MOV Aerate/Replacement 82-37 GDC-17 MCC Control Xformer Replacement 82-39 GDC-17 34.5* KV Reactor Trip 82-41 GDC-17 ASST A&C 6KV Cable Mods.
- 83-148
- 83-14C
- 83-14D
- 83-14F 83-27 83-32 83-40 Crane Enclosure Booster PUMP Installation Lighting &. Refurbish Crane Decon. Bldg. Roof &
Drip Protection E. 0. Containment Transmitters E.O. Containment Transmitters Switchgear RM/Cable Spread Rm. Ventilation 83-41 Conta_inment High Range Rad. Monitors 83-47 LEOF Data Link
- 83-48 Laundry Upgrade
- 84-04 Boron lnjt. Tank Removal 84-06 Reactor Brkt. Shunt Trip Unit I 84-07 Reactor Brkr. Shunt Trip Unit II 84-09 EQ RCS RTD Replacement
- 84-11 Training Center Fire Main
- 84-17 Moisture Sep. Reheater Mods.
84-26 Secondary Access Control Bldg.
- 84-47 4th Pass Drain Line lnstl.
- 84-49 Guide Tube Replacomsnt
- 84-58 Boric Acid Tnmsfor Piping 84-60 EDG#3 Louver Control
- Not Required Dy NRC
- \\
i* *.
.:J-SURRY lJHT 1 APPBIDIX R DESIG'l CJ-W'.IGES Pi'ID &ffis ~OH IN PROGRESS 0
THERE ARE PR~SENTLY 22 M:lDIFICATIONS \\'KJRKING DURING THE CURRENT OUTAGE, 0
THIS EFFORT REPRESENTS ABOUT 40% TO 50% OF THE RESOURCES IN MJNIES AND MANP0.-/1:R BE I NG EXPENDED DUR ING THIS OUTAGE, 0
THE APPENDIX R \\'KJRK FOR tHE UPCOMING l}.JIT 2 REFUELING OUTAGE WILL BE OF SIMILAR fviAGNITUDE.
r 83-33 83-36 83-37 Surry Unit 1 Appendix *R
- Design Changes & Engineering Work Requests Now in Progress Excore Flux Monitors Steam Generator Pressure Transmitters RCS Cold Leg RTD'a 84-66 In-Containment Valves Spurious Operations Protection 83-39A EOG #1 Control & Power Isolation 84-XX Emergency Communications Upgrade (Unit #1 Containment Only) 83-46 Emergency MCC Control Trans-former Fuse Installation 84-01 ESR Halon System 84-08 Remote MonitQring Panel Power Supply 84-20 RCS Hot Leg.Temperature Indication 84-22 Containment Instrument Modifications 84-24 Emergency Lighting Upgrade 84-42 RHR Pump Heat Shield
- EWR 84-223 Aux. Bldg. Cable Tray Firestops EWR 84-262 Back-Up Antenna Installation EWA 84-263 Appendix *R' DC Fuses EWR 84-274 Fuel Oil Transfer Pump Manhole Modifications EWR 84-279 CCW Pump Template and Couplings.
EWR 84-281 Aux. Bldg. Smoke Detectors EWR 84-282 Turb. Bldg. /ESR Damper Relocation EWR 84-AAA Damper Access Text (Unit #1)
EWR 84-888 Containment Cable Tray Covers
- and Firestops e
- _... --~.,. --* '
-e SURRY APP8IDIX R l"ODIFICATIONS RJR 1984 0
0 THIS TRANSPARENCY IS VERY BUSY AND IS INTENDED TO DEPICT THE WJRK EFFORT INVOLVED AND SI-OWS THE ONE-LINE CONSTRUCTION SCHEDULES FOR THE APPENDIX R PROJECTS TO BE COM'LETED IN 1984., WITH THE EXCEPTION OF THE EMERGENCY LIGHTING MJDIFICATION.
THIS WILL BE DISCUSSED LATER, A MJRE LEGIBLE COPY OF THE SCHEDULE WILL BE INCLUDED WI1H THE HANDOUT TO BE DISTRIBUTED AT THE CONCLUSION OF THIS PRESENTATION
OCP U-101 IINIT I ICI HOf LU tUlf'lHTUlt( INOtCITtON DCP 14*111 UNU I co*na,,..NT INIIR'UU(NT IIOOI.
DCP 14*14* UNIU l&I UlUtGl-.CY LIOHflM U*G*IDI DCP IJ-3S1 UNIT I pt<>tl:[ NlUUION,LU. MONITOlftlt!J IYITlll auaull I
13 NOUNT lll(UQf[
10 DCP 1.1-,s, UtllT I 0:1',JlL"!
UUII GCIIUIAIOII "tUISUfll HANIINlltltll O
CONDUIT DUJIIDl CONT.
IT llPl[IIIUI BURRY APPENDIX 'R' IIOOIFICATIDNS FOR 1984
~£0J'O~t.
Ot,,*tt\\'f~[ltM 0,,1111:-wu, 0 o-,AU!JLPA, blGHII 0
1f."V1Cl BLOG. LIGHT\\ U*t MS'WHl.10ff'9cJ!* I TUIII LIGHT\\, U-1 WS';'H LIGHUO O U-1 tutta LIOH19 o-l:OUa="~*-=c,.oNO=u,,11_,,o.;c.,a,.e"'u... ou=*.,,**.. *..
t.,.co,.,.,..,,,_. -----------<O GO-"D['-'l"'[.,,_c,.,10,::0:,.5.,:l_,C.,,<IM>=Ue.:llc..:"'::,S,a<D.,rc.,c,,.o::,N,:I "'---OO _,,ccceD.. b.. 1-oO'-'l'U!..o CABU:
e I
O *fHNSIIIUUII a",u~
C,tOl.l J ""'o
- ~:0,:-..0::.T~':.'1~~ ~:.l... POWUI IUPPL'f 0_.t,.A\\lil'"""M(""'-Nf:..&L"C,eONO=U:..:.ll _____________
.;o.,i.fA_,f5'(J.,'fc.,0 D
CCMCIUII fflSIOl CQIIT.
llitVUT[ll l*hl D
IIODIFICAtlON O
JJfvt,nu 1-11 D
!!'9Dlf!C81t9N o OCP 9.J-4!h UNIT I mmmLm18QNIOOL... OOMU OCP IJ-311* UNIT I IDO *1 CONIIIOL & POWl' laCN.,IUICMI OCP 14-0h UNITII Ill 1111 HALON IYIIJ(.11 OCP 14-411 UNIT I 11:HII PUWf'..r..u IHl(LD DCP 14-591 UNIT I llf-CONUINll(NJ VILV[I 1Pun1oue OPf.lllATIONS PIIOIIC11DII De, 14-111:1 UNI I lllf.ftG[NCY COINUfhCAIIONI Ul"QIIIOl 1..,,aLLAtHHI or HALON IJIJJMI JO! won 1 1 a IWft 1*-11 J1 au ** ILDO. CULi UIH JIMITOPI UNIII Ill lW* 14-ltll IICR-d' INTlllH lfOHO(
...... Ill lWIII 14-IU1 APPINCIII( W DC JUHi u** '
,... **-*,., run OM. 1111111,u,UMP ILINHOLI MOOI, UIIIII Ill f:~.*:il"' CCW PUIIP HIIP\\.ATll I COUPLINOI lWIII 14-Uh AUii:. ILDO. IIIM)l(I Dl1tCU>RI UIIIII Ill lWII U-lllt TUIIL ILDQ./UI DAlff'U lllLOCITIOII UNlllll 111 t** 14-AHI DAW[lt lCC(II tlll o**n 1 CIU IIOTl U lWtl 14-111111 CONUI-NT Cl.Ill 1RH COYUII I HIIITDf'I 0
WDIALU0" Of 11.C.C. rusts "41) 0 D DUCJHN!S a [9Vl'IKN1 I COttPWI J,r IHllLD 0 tNIUALL IH3LO 0 P[VICO, C0"0UIT a daLl ou,s,or CONT.
O COJIDUIT I CHL[.,.SIO( CONT.
r1111 9TOf"S -
0,UJ[ ft,011.LUTION O
roaM J,9Hf,t 0
fAI TU!Pl..Atl t COUPLI~
0 attlC1Df1JS.CONDUITICAIU0 flit O flltl-lftlAII'
~
~
O yopw1ca110.. l!I IHHD ON Tl!'
WAUOOWN l>---ARED TO 77 DAYS FOR UN IT 1.
550 500 450 400 350 100 50 e
e SURRY POWER STATION CUMULATIVE CONSTRUCTION MANPOWER REQUIREMENTS AUGUST I* I 984 -
DECEMBER 3 I* I 984 TOTAL REQUIRED ELECTRICAL MECHANICAL CIVIL 30 6
13 20 27 3
10 17 24 1
8. 15 22 29 5
12 19 26 3
10 17 24 31 AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER 1984 r
l'.:
11 e
e SURRY LNITS 1 & 2 APPENDIX R MJDIFICATIONS l.NABLE TO ~£ET CURRENT COM'1ITM:NTS 0
Now FOR THE REASON WE CAM: TO BETHESDA TODAY:
0 THE FOLLOWING TRANSPARENCY SHOWS THE 6 SURRY APPENDIX R MJDIFICATIONS THAT
\\'ON'TBE COMDL.ETED AS PREYIOUSLY IDENTIFIED AND M-IERE APPROPRIATE.,
SCHEDULE EXEMDTIONS WILL ~E SUBMITIED, 0
THE CGM=>ENSATORY MEASURES ASSOCIATED WITH EACH MJDIFICATION ARE SHOWN, 0
ALL OF THESE MJDIFICATIONS ARE RECENTLY IDENTIFIED AND RESULT FROM THE REANALYSIS, 0
I WILL GIVE A BRIEF DESCRIPTION OF EAa-i-OF THE 6 fvDDIFICATIONS ALONG WITH OUR PROPOSAL FOR COMPLETION, FINAL Cot'MITMENTS FOR COWLETION WILL BE MADE NO LATER 11iAN NOVEMBER 30., 1984
- BACK-UP OCP 84-XX ti-JITS 1 & 2 8-ERGENCY CoMiJNICATIONS UPGRADE, l.NIT 1 REDUNDANT CONTAINMENT ANTENNA WILL BE INSTALLED DURING ll'JlT 1 REFUELING, NoN-DUTAGE hORK TO BE COM'LETED BEFORE THE START OF UNIT 2 REFUELING, UNIT 2 REDUNDANT CONTAINMENT ANTENNA TO BE INSTALLED DURING THE UNIT 2 REFUELING, DCP 84-YY l}JIT 1 Mt\\IN STEAM ISOLATION VALVES FIRE PROTECTION.
THIS r-DDIFICATION GUARDS AGAINST TI-lESE VALVES FROM BEING IN AN UNDESIRED POSITION AFTER A FIRE, UNITS 1 & 2 NON-ouTAGE hORK WILL BEGIN PRIOR TO TI-IE IJNIT 2 REFUELING...
(}.JJT 2 WORK WILL BE COM'LETED DURING THE lJNIT 2 REFUELING, IJNIT 1 FINAL TIE-INS WILL BE DONE DURING THE NEXT OUTAGE OF SUFFICIENT DURATION TO COMPLETE THE WJRK,
i
\\,,... ~
I
~.,
- SURRY !JHTS 1 & 2 AF9ID1x R r*TIDIFICATIONS LNABI£ Th CURR8IT mnrn*9ITS (CONT'D 0
DCP 84-:ZZ liHTS 1 & 2 CHARGING Pt.IMPS CooL°ING WATER RADIATORS, WE ANTICIPATE STARTING NON-OUTAGE CONSTRUCTION ON APRIL 15, 1985, DELIVERY OF THE RADIATOR SKIDS IS ANTICIPATED ON JULY L 1985.
FINAL TIE-INS ARE EXPECTED TO BE r-1ADE DURING THE 1985 FALL
~1AINTB}ANCE OUTAGES FOR l.JNITS 1 & 2, DCP 85-AA l.NITS 1 & 2 CoNTROL ROOM AND EMERGENCY SWITCHGEAR ROOMS VENTIUffION, WE ANTICIPATE STARTING NON-OUTAGE WJRK IN FEBRUARY, 1985.
ll'JIT 2 TIE-INS WILL BE PERFORMED DURING THE UNIT 2 REFUELING OUTAGE, UNIT 1 TIE-INS WILL BE PERFORM.ED DURING THE NEXT OUTAGE OF SUFFICIENT DURATION TO COfv\\OLETE THE WORK, DCP 85-BB l}JJTS 1 & 2 AUXILIARY Bull.nING VENTILATION.
WE ANTICIPATE STARTING NON-OUTAGE WJRK IN FEBRUARY., 1985, - (}HT 2 TIE-INS WILL BE PERFORMED DURING THE l}.JIT 2 REFUELING OUTAGE,.
~IT 1 TIE-INS WILL BE PERFORMED DURING THE NEXT OUTAGE OF SUFFICIENT DURATION TO COM'LETE THE WJRK.
B'ffi 85-DDD
~IT 1 ca1 PtJ.1Ps AND RHR Pl.M's 41ffN BREAKER CoNTROL PROTECTION.
THIS MJDIFICATION WILL BE PERFORMED DURING THE NEXT OUTAGE OF SUFFICIENT DURATION TO COWLETE TI-IE-\\'ORK AFTER TI-IE 1984 I.A'JIT 1 REFUELING OUTAGE.
THE DATES USED /lEO\\/E ARE BASED UPON CONCEPTUAL INFORt1!\\TION, OUR FINAL C~ITI-1ENTS FOR COMPLETION OF TI-IIS \\iORK WILL BE t-W)E NO LATER TH.AN NoVEMBER 30., 1984.
Surry Units 1 & 2 Appendix *n* Reanalysis Modifications Unable to Meet Current Commitments
- 1. DCP 84-XX - Units 1 & 2 - Emergency Communications Upgrade Compensatory Measure:
Automatic Fire Detection & Suppression in the Cable
- spreading Room. Fire Watches in Emergency Switchgear Rooms and Control Room. Temporary Antenna (EWR 84-262).
- 2. DCP 84-YY - Unit 1 - Main Steam System Valves Fire Protection
. Compensatory Measures: Fire Watches in Emergency Switchgear Rooms and Control Room
- 3. DCP 84-ZZ - Units 1 & 2 - Charging Pump Cooling Water Radiators Compensatory Measure:
Fire Watches in Emergency Switchgear Rooms, Mechanical Equipment Room #3, and the Auxiliary Building.
- 4. DCP 85-AA - Units 1 & 2 -*Control Room & Emergency Switchgear Room. Ventilation Compensatory Measure:
Fire Watches in Emergency Switchgear Rooms and Mechanical Equipment Room #3.
'~
- 5. DCP 85-BB - Units 1 & 2 - Auxiliary Building Ventilation Compensatory Measure:
Fire Watches in Emergency Switchgear Rooms and Auxiliary Building.
I* t
Compensatory Measure:
Fire Watches in the Emergency Switchgear Rooms
\\~
e SURRY lllITS 1 & 2 APPENDIX R rffiIFICATIONS THAT Mll.Y !'(ff f'ffi CURRENT C!Jt1ITIENTS 0
THE PREVIOUS TRANSPARENCY DISPLAYED THE M)DIFICATIONS THAT WILL NOT BE COf,flLETED AS PREVIOUSLY COPMITIED.
0 THE FOLLOWING 00 M)DIFICATIONS fl'AY NOT BE COMPLETED BY THE END OF THE ~IT 1 REFUELING OlJTAGE.
THE REASONS ARE GIVEN BELOW:
- 1. EtllfRGENCY LIGHTING UPGRADE.
EMERGENCY LIGHTING FOR l}J IT l OUT AGE RELATED AREAS., SUCH AS lHE MAIN STEAM VALVE 1-busE., WILL BE COMPLETED DURING THE CURRENT ~IT 1 REFUELING.
CRAFT PEOPLE ASSIGNED TO THE MJDIFICATION WILL CONTINUE TO WORK THE PACKAGE THROUGHOUT THE ~IT 1 OUTAGE.
l-b\\'1EVER., SHOULD ADDITIONAL ~POWER BE REQUIRED TO FINISH THE SCHEDULED OUTAGE RELATED M:>DIFICATIONS., THIS ~POWER WJULD BE PULLED OFF THE 81:RGENCY LIGHTING JOB TO SUPPORT THE OUTAGE RELATED WJRK.
SHOUl.:.D THIS BE il-!E CASE., THE EtERGENCY LIGHTING UPGRADE WOULD BE COM.PLETED BEFORE THE START OF THE ~IT 2 REFUELING OUTAGE.
CoMPENSATORY MEASURES.
PoRTABLE LANTERNS ARE LOCATED IN TI-IE CONTROL ROOM.
- 2. l.JNIT 1 AIR OPERATED VALVE ~DIFICATIONS.
THE NEED FOR TI-IIS MJDIFICATION WAS JUST RECENTLY IDENTIFIED BY TI-IE REANALYSIS.
ENGINEERING AND/OR ~TERIALS MA.Y NOT BE AVAILABLE FOR INSTAUATION DURING TI-IE CURRENT REFUELING.
IF THIS SHOULD BE THE CASE., TI-IE M)DIFICATION OF THESE INSIDE CONTAINMENT VALVES WOULD BE PERFORt-E) DURING TI-IE NEXT OUTAGE OF SUFFICIENT DURATION TO COT'IPLETE THE ~RK.
CoMPENSATORY ~SURES.
REPAIR PROCEDURE WILL BE USED TO ESTABLISH ALTERNATIVE LET OOWN.
I I
I I
.1 Surry Units 1 &. 2 Appendix *R' Reanalysis Modifications
- That May Not Meet Current Commitments
- 1. Emergency Lighting Upgrade - Units 1 & 2 e
Reason:
Should Additional Manpower be Required to Complete the Unit #1 Outage Related Work during this Refueling, lighting Installation in Non-Outage Related Areas will be Postponed~
If Postponed, the Emergency Lighting Upgrade would be Complete" before the Start of the 1985 Unit #2 Refueling.
Compensatory Measure:
Portable Lanterns are Located in the Control Room.
- 2. EWR 85-CCC - Unit 1 Air Operated Valves Modification (Letdown) e Reason:
Engineering and/or materials may not be available for installati~n during the current refueling., If delayed, this modification would be performed during the next outage of sufficient. duration to complete the work.
Compensatory Measure:
Repair Procedure will be Us~d to Establish Alternative Letdowr,.
- ~
Cil~CLLSION IN CoNCLUSION:
0 0
0
.EVEN WITH THE EXTENSIVE SCOPE OF APPENDIX "R"., VEPCO ~GElv'fNT IS Cel11ITTED TO f>WJAGE AND PRIORITIZE THIS WORK IN A DETERMINED EFFORT TO MEET COM-1ITTED SCHEDULES, VEPCO PL.ANS TO PROVIDE THE NRC WITH A SURRY (DELTA) REPORT AS WE DID FOR NORTH AANA.
THIS REPORT WILL HIGHLIGHT THE DIFFERENCES IN THE SER AND THE CURRENT REANALYSIS.
WE ARE EXPENDING ALOT OF RESOURCES., BOTH MA.NPOWER AND PONEYi ON OUR EFFORT TO BE IN FULL COMPLIANCE WITH APPENDIX "R" IN THE NEAR FUTURE.
WITH OUR PRESENT SCHEDULES WE WILL COMPLETE ALL KNOWN APPENDIX R" MJDIFICATIONS WITHOUT THE NEED OF ANY ADDITIONAL REFUELING OUTAGES.
IT IS OUR INTENTION TO BE IN FULL COMPLIANCE WITH APPENDIX "R" BY THE END OF 1985.
.J e
MEETING
SUMMARY
D!STRIBUTION OPERATING REACTORS BRANCH NO. 1
,>-oocl<et or Centra 1-r;-i-e-*,
--L-NRC-PDR~---
Loca l PRO ORB#l Rdg J. Partlow (Emergency Preparedness only)
Steve Varga Project Manager OELD E. Jordan J. N. Grace ACRS ( 10)
NSIC Gray File Plant Service List CParrish NRC Participants