Informs of 841108-09 in-process Audit of Detailed Control Room Design Review to Clarify Aspects of Review Process & Evaluate Results of Review to Date.Access to Control Room Area & Simulator for NRC Requested
ML18142A083
Person / Time
Site: Surry, North Anna, 05000000
Issue date: 10/19/1984
From: Varga S
Office of Nuclear Reactor Regulation
To: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 8411030266
Download: ML18142A083 (2)


Text

October 19, 19~4 Docket Nos. 50-280/281 and 50-338/339 Mr. W. L. Stewart Vice President - Nuclear Operations Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261

Dear Mr. Stewart:

DISTRIBUTION Docket File LPDR PDR Gray File #1 DEisenhut JPartlow JNGrace CParrish DNeighbors ORB#l Rdg ORB#3 Rdg LEngle Gray File #3 OELD EJordan RFerguson LA #3 An in-process audit of the Detailed Control Room Design Review (DCRDR) for Surry and North Anna Power Station will be conducted by the NRC and its consultants from Lawrence Livermore National Laboratory (LLNL).

We have consulted with your staff and agreed upon the dates of November 6-9, 1984 at the Surry Power Station.

The purpose of the audit is to clarify certain aspects of the review process, to confirm that the review is being conducted appropriately, and to evaluate the results of the review to date.

In preparation for the audit, please make the following arrangements to facilitate the review process:

1.

Make available review team personnel knowledgeable of the DCRDR tasks/processes and be ready to discuss or respond to NRC staff questions during the audit.

2.

Be able to provide documentation of the review results to date, including HED's identified, and any review materials, such as task collection forms, as part of the audit.

3.

Provide for access to the Surry control room area and simulator for the NRC staff and its contractors.

We also request clearance to bring camera equipment onsite to take photographs in the control room, simulator or other areas which may assist in evaluating the DCRDR and help in documenting the audit.

4.

Provide for conference or office space for both the NRC staff's meetings with the licensee's review team and for the NRC audit team to meet privately.

r *-

Mr. W. October 19, 1984 Our team personnel are Joel Kramer of NRC and Jack Savage and Jim Moore of LLNL.

The Surry Project Manager may attend part of the time.

A tentative agenda is enclosed.

Enclosure:

As stated cc w/enclosure:

See next page OR~

DNe, ors ;ps 10{\\ 4 ORB~

LEngle IOffJ/84

/s/SVarga Steven A. Varga, Chief Operating Reactors Branch #1 Division of Licensing M

C-~DL Mi 11 er 0!/1184 CE:DL S rga

~

,t,q/84