Forwards Two of Three Safety Injection Accumulators Inoperable, AEOD Technical Review Rept
ML18141A112
Person / Time
Site: Surry Dominion icon.png
Issue date: 08/11/1983
From: Zukor D
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
To: Seyfrit K
NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD)
Shared Package
ML18141A113 List:
References
TASK-AE, TASK-T328 AEOD-T328, NUDOCS 8309220152
Download: ML18141A112 (2)


Text

i *~,,~.

I

~,.. __

~._.

AUG 11 1983 MEMORANDUM FOR:

Karl V. Seyfrit~ Chief Reactor Operations An'~Jysis Branch Office for Analysis and Evaluation of Operational Data THRU:

\\fayne Lanning, Lead Engineer Reactor Sys terns 2 React'Pr Operations Analysis Branch FROM:

Dorothy Zukor, Engineer Reactor Systems 2 Reactor Operations Analysis Branch AE0D/T328

SUBJECT:

nm OF THREE ECC'~S ACCUMULATORS INOPERABLE.l\\T SURRY 1 This event was caused by not following procedures.

The operator was reinstructed and disciplined.

Jhi? eve*rrt:.wafo:r,ii}i\\irarll,},categorized as a significant event because it appeared that two of the three ECCS accumulators would not have been avai-lable for injection.

Upon further investigation, it was found that technically they were inoperable but actually would have injected on an S. I.

Distribution:

. ~,t'R(\\,/ff PR ROAB CF D. ::Z.ukor, ROAB W. Lanning, ROAB K. Seyfrit, C/ROAB T. Ippolito, DD/AEOD C. Heltemes, D/AEOD

--8309220152 830811 PDR ADOCK 05000280 y

8.

PDR

~-~UV Dorothy akbr, Engineer Reactor Systems 2 Reactor Operations Analysis Branch OFFICE *.***** ~.Q~~.f.'t~...... BQ~.~-~-.fr/i~ ~--*********************.. _..............................................................................................

SURNAMElt D.Z.ul<.ur.;.bg...... ~.... WL.9nn.1J.f.g.... ***********o************........................ ************************ ************************ *******11****************

DATE *

.... ?/.... 1,.. !.~J.... _,.§l.1?... 1.§1..............................,...............................................................................................

NRC FORM318 (10-80) NRCM 0240 OFFICIAL R l!cCORD COPY USGJ>():1981-33&-960

f.*-

UNITED STATES TLJcLEAR REGULATORY COMMISSI~

WASHINGTON, D. C. 20555 AUG 111983 MEMORANDUM FOR:

Karl V. Seyfrit, Chief Reactor Operations Ana~ysis Branch Office for Analysis and Evaluation of Operational Data THRU:

Wayne Lanning, Lead Engineer Reactor Systems 2 Reactor Operations Analysis Branch FROM:

  • Dorothy Zukor, Engineer Reactor Systems 2 Reactor Operations Analysis Branch AEOD/T328

SUBJECT:

TWO OF THREE ECCS ACCUMULATORS INOPERABLE AT SURRY 1 This event was caused by not following procedures.

The operator was.

reinstructed and disciplined.

Thi~:LER was originally categorized as a significant event because it appeared that two of the three ECCS accumulators would not have been available for injection.

Upon further investigation, it was found that technic~lly they were inoperable but actually would have inject,ed on

  • an S. I.

~~~

Dorothy Z~~r, Engineer Re.actor Sys terns 2 Reactor Operations Ana lys*i s Branch

.