ML18141A112
| ML18141A112 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 08/11/1983 |
| From: | Zukor D NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD) |
| To: | Seyfrit K NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD) |
| Shared Package | |
| ML18141A113 | List: |
| References | |
| TASK-AE, TASK-T328 AEOD-T328, NUDOCS 8309220152 | |
| Download: ML18141A112 (2) | |
Text
i *~,,~.
I
~,.. __
~._.
AUG 11 1983 MEMORANDUM FOR:
Karl V. Seyfrit~ Chief Reactor Operations An'~Jysis Branch Office for Analysis and Evaluation of Operational Data THRU:
\\fayne Lanning, Lead Engineer Reactor Sys terns 2 React'Pr Operations Analysis Branch FROM:
Dorothy Zukor, Engineer Reactor Systems 2 Reactor Operations Analysis Branch AE0D/T328
SUBJECT:
nm OF THREE ECC'~S ACCUMULATORS INOPERABLE.l\\T SURRY 1 This event was caused by not following procedures.
The operator was reinstructed and disciplined.
Jhi? eve*rrt:.wafo:r,ii}i\\irarll,},categorized as a significant event because it appeared that two of the three ECCS accumulators would not have been avai-lable for injection.
Upon further investigation, it was found that technically they were inoperable but actually would have injected on an S. I.
Distribution:
. ~,t'R(\\,/ff PR ROAB CF D. ::Z.ukor, ROAB W. Lanning, ROAB K. Seyfrit, C/ROAB T. Ippolito, DD/AEOD C. Heltemes, D/AEOD
--8309220152 830811 PDR ADOCK 05000280 y
- 8.
~-~UV Dorothy akbr, Engineer Reactor Systems 2 Reactor Operations Analysis Branch OFFICE *.***** ~.Q~~.f.'t~...... BQ~.~-~-.fr/i~ ~--*********************.. _..............................................................................................
SURNAMElt D.Z.ul<.ur.;.bg...... ~.... WL.9nn.1J.f.g.... ***********o************........................ ************************ ************************ *******11****************
DATE *
.... ?/.... 1,.. !.~J.... _,.§l.1?... 1.§1..............................,...............................................................................................
NRC FORM318 (10-80) NRCM 0240 OFFICIAL R l!cCORD COPY USGJ>():1981-33&-960
f.*-
UNITED STATES TLJcLEAR REGULATORY COMMISSI~
WASHINGTON, D. C. 20555 AUG 111983 MEMORANDUM FOR:
Karl V. Seyfrit, Chief Reactor Operations Ana~ysis Branch Office for Analysis and Evaluation of Operational Data THRU:
Wayne Lanning, Lead Engineer Reactor Systems 2 Reactor Operations Analysis Branch FROM:
- Dorothy Zukor, Engineer Reactor Systems 2 Reactor Operations Analysis Branch AEOD/T328
SUBJECT:
TWO OF THREE ECCS ACCUMULATORS INOPERABLE AT SURRY 1 This event was caused by not following procedures.
The operator was.
reinstructed and disciplined.
Thi~:LER was originally categorized as a significant event because it appeared that two of the three ECCS accumulators would not have been available for injection.
Upon further investigation, it was found that technic~lly they were inoperable but actually would have inject,ed on
- an S. I.
~~~
Dorothy Z~~r, Engineer Re.actor Sys terns 2 Reactor Operations Ana lys*i s Branch
.