Advises That Test Plan Development for TMI Item II.D.3, Seismic & Environ Qualification of Acoustical Monitoring Sys, Complete.Certain Components Failed B&W Planning Retest.Retest Completion Scheduled for Nov 1983
ML18141A069
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/29/1983
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.D.3, TASK-TM 045A, 45A, NUDOCS 8308050455
Download: ML18141A069 (4)


Text

..

11'1-e VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIRGINIA 23261

w. L. STEWA.RT VICE PRESIDENT NUCLEAR OPERATIONS July 29, 1983 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Darrell G. Eisenhart, Director Division of Licensing U.S. Nuclear Regulatory Commission Washington, D. C. 20555 Gentlemen:

Serial No. 045A NO/WDC:acm Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 VIRGINIA ELECTRIC AND POWER COMPANY SURRY POWER STATION UNIT NOS. 1 AND 2 NUREG-0737 ITEM II.D.3 In our letter dated January 28, 1983 (Serial No. 045), Vepco that the seismic and environmental qualification of the acoustical monitoring system, for the direct indication of relief and safety valve position (NUREG-0737, Item II.D.3) was still undergoing test plan development by the owner's group.

The completion of the owner's group test plan and the seismic and environmental qualification of the acoustical monitoring system was scheduled for July 31, 1983.

Vepco has been informed that the test plan development for the acoustical monitoring system is complete.

However, certain components had failed during the seismic and environmental qualification and Babcock and Wilcox is planning to retest.

The completion of the retest program is currently scheduled for November, 1983 with issuance of the final report in January, 1984.

cc:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing Mr. D. J. Burke NRC Resident Inspector North Anna Power Station 8308050455 830729 PDR ADOCK 05000280 P

PDR Very t~uly yours~-

J;J/Jj~v-...

/f~/'(_

. ~

W. L. Stewar

L

  • I.,.

e

--. JUL 2 8 1983 Virginia Electric and Power Company ATTN:

Mr. W. L. Stewart, Vice President Nuclear Operations P. 0. Box 26666 Richmond, VA 23261 Gentlemen:

SUBJECT:

CONFIRMATION OF PERFORMANCE APPRAISAL INSPECTION SCHEDULE

/.) (}t,c,~ f h (g__

This confirms the telephone conversation between Mr. W. L. Stewart, Vice Presi-dent, Nuclear Operations Department, and Mr. H. C. Dance of my staff on July 14, 1983, concerning our plans to conduct a Performance Appraisal Team inspection at the Surry plant site and the Virginia Electric and Power Company corporate offices.

This inspection will be performed during August and September 1983, with field work commencing August 22, 1983.

We anticipate the first week (August 22-26) to be spent at the plant site, the second week (August 29-Se~tember 2) at the corporate offices, and the final week (September 12-16) at either location as required to complete the inspection.

An exit meeting with licensee management is anticipated for September 30, 1983.

The preliminary inspection plan is enclosed.

Documents required to perform the inspection include current plant and corporate organization charts with the names of the individuals responsible for each of the areas within the enclosed inspection plan.

This information is needed as soon as possible to establish the interview list.

Your assistance in obtaining the required information will be appreciated.

The PAT inspections are an integral part of the revised NRC inspection program described in NUREG 0397 and approved by the Commission in June 1977.

Although the inspections are conducted by the PAT, the regions retain the principal responsibility for the day-to-day inspection and enforcement program, and remain

.the principal line of communications between IE and your organization.

Should you have any questions concerning this matter, we will be glad to discuss them with you.

Enclosure:

(See Page 2)

-- - 8309190405 830728 PDR ADOCK 05000280 G

PDR Sincerely, R. C. Lewis, Director Division of Project and Resident Programs I.

/ Jtf

/

uO

..., i

,{,

C:E31

--- ~I

.e

Enclosure:

Performance Appraisal Inspection Plan cc w/encl:

J. H. Ferguson, Executive Vice President P. G. Godwin, Director, Nuclear Security J. L. Wilson, Station Manager bee w/encl:

NRC Resident Inspector Document Management Branch Commonwealth of Virginia RII CJ~:cdg 112-f/s3 RI\\,,

Hix~

712.. 7/~3 i~is 7tt/83 2

JUL 2 8 1983

~--------

e PERFORMANCE APPRAISAL INSPECTION PLAN I.

The Licensee's Management Control Program A.

Plant Operations and Training B.

Maintenance C.

Design Changes and Modifications D.

Quality Assurance Audits and Corrective Action E.

Procurement F.

Committee Activities II.

For each of the areas listed above, the following will be determined A.

Does the licensee have written procedures or policy documents to provide guidance in the management of the subject areas?

B.

Are the procedures and policy documents adequate for controlling the applicable activities in the subject areas?

C.

Are licensee personnel who have responsibilities in the subject area adequately trained and retrained to maintain their qualification level?

D.

Do the individuals who have been assigned responsibilities in the subject area understand their responsibilities?

E.

Have the requirements for the subject area been implemented in accord-ance with management policy and are these activities appropriately documented and reviewed?

Direct observations of selected maintenance and operational activities will be conducted.