ML18141A031

From kanterella
Jump to navigation Jump to search
Proposed Tech Specs 6.1-12 & 15 & Figures 6.1-1 & 2 Re Reorganization of Nuclear Operations & Security Depts. Discussion of Proposed Changes Encl
ML18141A031
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/30/1983
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18141A030 List:
References
NUDOCS 8307060235
Download: ML18141A031 (6)


Text

i L

/.

e TS 6.1-12

6.

Any other matter involving safe operation of the nuclear power stations which is referred to the Director-Safety Evaluation and Control by the Station Nuclear Safety and Operating Committee.

7.

Reports and meeting minutes of the Station Nuclear Safety and Operating Committ~e.

e.

Authority The Director-Safety Evaluation and Control shall report to and advise the Manager-Nuclear Operations Support, who shall advise the Vice President-Nuclear Operations on those areas of responsibility specified in Section 6.1.C.2.d.

f.

Records Records of SEC activities required by Specification 6.1.C.2.e shall be prepared and maintained in the SEC files and a summary shall be disseminated as indicated below each calendar month.

1.

Vice President-Nuclear Operations

2.

Nuclear Power Station Managers

3.

Manager-Nuclear Operations Support

4.

Executive Manager-Quality Assurance 5 *. Others that the Director-Safety Evaluation and Control may designate.

8307060235 830630 PDR ADOCK 05000280 P

PDR I

I

e e

TS 6.1-15

c.

Records Records of the Quality Assurance Department audits shall be prepared and maintained in the department files.

Audit reports shall be disseminated as indicated below:

lo Nuclear Power Station Manager

2.

Vice President-Nuclear Operations

3.

Manager-Nuclear Operations Support

4.

Director - Safety Evaluation and Control

5.

Supervisor of area audited

6.

Nuclear Power Station Manager Quality Assurance

7.

Executive Manager - Quality Assurance

EX!CUTl'f! IWIACl:I 4l"ALlTY ASSUIWICE IWW:!I QUALm ASSIIIA*:I IIUCL!AI STATION IWIAClll Dl~ECTOII ADtllNISTIATIVE S!IVICIS I

nn.tcTM

!HERCEHCY PLAIINING

!UCUTIVE VIC! PR!SIDEIIT

c. 0. o.

I S[NIOII VIC! PIIES IDEIIT l'OWU OPEltATIDNS I

I VIC! ntSID!IIT.

aJCLEil OP!ltATIONS I

I Dll!CTOll TIAIMIIIG OFFSITE ORGANIZATION FOR I

DIIECTO&

OPUlATIOIJ AND 11A IIIT!IWIC! SUPPO&T FACILITY MANAGEMENT AND TECHNICAL SUPPORT I

Dll!CTOe SAFETY EVALUATIOII AIII> cntmlOL I

I L

~ ~

IWW,[I IIJCL!AJI OP!ltATIOIIS SUPPOIIT Dll!CTOII NUCLUI PU!L OP!IATICJal IIIClll!El Ill:

SUHIVISOI

( SAnTY IIIGINIOIIIII HS-SIILI roa coaPO&An '111 NCJIIC'TIOII NOCUII I

D1l!C1111 CHDIISTI Y All>

HEALD l'lll'SICI e

IUl'UVUOI IUCL.Lll

'IUlll81.

llATJC:.

IICUl:ln IUtUVIIGI IL-llllOI. Lltllll DL-Otu.t.lOl'I Llctal

-CIIIIIIICAIICIIII IUHIVHOI IIUl.n

,.111c1 A

COIIJIOL IOCII OflU10I/D&IIU STAtloa llUCLLU W'IIY DrllAIIIICo CCNtanu SURRY POWER STATION ORGANIZATION CHART Vltl HlSlllttrr

-r-1

_.J IUIEllltlllllUT IUCUA& OPlUTIO.li atanm ll&MUI AIIHTAlff ltatam -

,u,11111~

  • CKAMICA1 Ml!ffll&A.1Cl LUCDICAl.

IUtUVllOI IUPUVISOI N,lllfl'IIWICl 11av1a1 lM:1.[IINC IUPUVISOI PL,UUUIIC iUPUlltllllllff 11.QllllUL IUWIW CKDIISDY sv,u,um IIStlLIIHt IUPUvllm UEUllHIIIC 1u,iavnm.

nar.,,1111 IKl*lllllCf l&IPUVIIOI DIC 6 noJlC'II 111;1*uu1r; IUPPVI~

u,r.n INCllllUIK 11.vr 1111nncUitC&1.

11111111lll IU1U111Ca -

lltCutlVI IIUIAf.(!I quaun AIIUIAIICI I

I qu,aa.an 4IIUl&ICI

..., 111&1 IUl&a riu -

wm IUPHV15<9i

..... 1111.t,fJtl IUVU.II 11&n 11111,an -

llllllllSS Hlflll UfllCII

~*

e ATTACHMENT 2

- -- --- --- =- -~----

e DISCUSSION OF PROPOSED TECHNICAL SPECIFICATION CHANGE This proposed Technical Specifications change reflects the recent reorganiza-tion within the Nuclear Operations Department.

This reorganization deletes the position of Manager, Nuclear Operations and Maintenance and renames the

Manager, Nuclear Technical Services to the Manager, Nuclear Operations Support.

The Manager, Nuclear Operations Support will carry out his old responsibilities plus assume the responsibilities of the Manager, Nuclear Operations and Maintenance.

The new responsibilities that transfer to the Manager, Nuclear Operations Support are Emergency Planning, Training and Operations and Maintenance Support.

In addition, the Nuclear Fuel Operations group is a new responsibility that is added to the Manager, Nuclear Operations Support.

Technical Analysis and Control has been deleted from the responsibi-lities of the Manager, Nuclear Operations Support.

The Director, Administra-tive Services will report directly to the Vice President-Nuclear Operations.

This reorganization maintains the direct communications between the Vice President-Nuclear Operations and the Nuclear Power Station Managers.

Also the title of the Executive Vice President has been changed to the Executive Vice President and Chief Operating Officer.

This Technical Specifications change also reflects the recent reorganization of the Security Department.

The proposed change has the Station Security Supervisor reporting to the Director, Nuclear Security at the corporate office.

The Station Security Supervisor will continue to have communications with the Supervisor Administrative Services at the station.

This Technical Specification change also adds the Executive Manager-Quality Assurance to Specification 6.1.C.3.c to receive Quality Assurance Department audit reports.

This proposed change is administrative in nature and in no way poses any danger to the safe operation of the plant.