Proposed Tech Spec Pages 6.4-4 & 6.4-5,reflecting Revised List of Procedures & Persons Designated for Approval in Sections 6.4.E & 6.4.F
ML18139B987
Person / Time
Site: Surry  Dominion icon.png
Issue date: 08/03/1982
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML18139B986 List:
References
NUDOCS 8208090105
Download: ML18139B987 (2)


Text

Q ...

D.

- e TS 6.4-4 All procedures described in A and B above shall be followed.

E. Temporary changes to procedures described in A and B above which do not change the intent of the original procedure may be made, provided such changes. are approved prior to implementation by the persons de- -

signated below based on the type of procedure to be changed:

1. Administrative Cognizant Supervisor
2. Abnormal Shift Supervisor or Assistant Shift Supervisor
3. Annunciator Shift Supervisor or Assistant Shift Supervisor
4. Health Physics *Health Physics
5. Emergency Shift Supervisor or Assistant Shift Supervisor
6. Maintenance *Cognizant Supervisor
7. Operating Shift Supervisor or Assistant Shift Supervisor
8. Periodic Test *Cognizant Supervisor
9. Start-up Test *Engineering Supervisor
10. Special Test *Engineering Supervisor
11. Quality Assurance Manager Quality Assurance or Supervisor Quality Control, O&M
12. Chemistry *Chemist
  • These procedures must have the approval of a licensed Senior Reactor Operator.

Such changes will be documented and subsequently reviewed by the Station Nuclear Safety and Operating Committee and approved by the Station Manager within fourteen days.

8208090105 820803 PDR ADOCK 05000280 P PDR

M '

  • F.

e -

Temporary changes to procedures described in A and B above which change TS 6.4-5 the intent of the original procedure~ may be made, provided such changes are approved prior to implementation by the person designated below based on the type of the procedure to be changed.

1. Administrative Station Manager
2. Abnormal Superintendent-Operations
3. Annunciator Superintendent-Operations
4. Health Physics *Supervisor-Health Physics
5. Emergency Superintendent-Operations
6. Maintenance *Mechanical Supervisor
  • Electrical Supervisor
  • Instrument Supervisor
7. Operating Superintendent-Operations
8. Periodic Test *Engineering Supervisor
9. Start-up Test *Engineering Supervisor
10. Special Test *Engineering Supervisor
11. Quality Assurance Manager Quality Assurance or Supervisor Quality Control, O&M
12. Chemistry *Supervisor-Chemistry
  • These procedures must have the approval of a licensed Senior Reactor Operator.

Such changes will be documented as subsequently reviewed by the Station Nuclear Safety and Operation Committee and approved by the Station Manager within fourteen days.

G. In cases of emergency, operations personnel shall be authorized to depart from approved procedures where necessary to prevent injury to personnel or ~amage to the facility. Such changes shall be documented and reviewed by the Station Nuclear Safety and Operating Committee and approved by the Station Manager.

' - - .-~-.- .:._~ .. '. ' . .. .