Application for Amend to Licenses DPR-32 & DPR-37,changing Tech Spec 3.8.A.3 & Table 4.1.2.A Re Opening of Containment Purge Valves & Adding Valve Leakage Test,Per Generic Item B-24 & NUREG-0737,Item II.D.4.2.5.Affidavit Encl
ML18139B668
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/31/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18139B669 List:
References
REF-GTECI-B-24, REF-GTECI-ES, RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.2, TASK-B-24, TASK-OR, TASK-TM 709, NUDOCS 8201070114
Download: ML18139B668 (2)


Text

I '

VIRGINIA ELECTRIC.A.ND POWER COMPANY RICHMOND~ VIRO:tNIA 23261

.. IAN6 R.H.LEASBUHO VxcE :E'RE!,IDENT NUCLEAR. OPERATIONS December 31, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Gentlemen:

US !iUClW REllDUiDRV COMWSIG!'I DOCUiWfi mn.:,w,mrr ~a

'II' TIDC v.,i Serial No. 709 NO/GSS:acm Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR-37 SURRY POWER STATION UNIT NO. 1 & 2 PROPOSED TECHNICAL SPECIFICATION CHANGE Pursuant to 10CFRS0.90, the Virginia Electric and Power Company requests an amendment, in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for the Surry Power Station, Unit No. 1 &

2.

The proposed changes are enclosed.

The proposed change is to revise Specification 3.8.A.3 and Table 4.1.2A to add that the containment purge valves shall not be open above 200°F and also to add the containment purge MOV Leakage Test and the frequency of surveillance.

This change is in accordance with our December 1, 1981 response to NRC generic letter dated October 8, 1981 concerning the Status of Generic item B-24 and completion of TMI Action item II.E.4.2.5.

A Design Change is needed to conduct surveillance.

Therefore, before the Technical Specification is issued, it is requested that the NRC Project Manager contact Mr. E. R. Smith, Jr. of our office regarding the schedule.

The requested change has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff.

It has been determined that this request does not involve an unreviewed safety question.

We have evaluated this request in accordance with the criteria in 10CFR170.22 and it has been determined that a class III license amendment fee is required.

A voucher check in the amount of $4,400. is enclosed in payment of the required fee.

Very truly yours, Attachments:

1.

Proposed Technical Specification change.

2.

Voucher Check No. 60415 for $4,400.

cc:

Mr. James Office of Region II P. O'Reilly, Regional Administrator Inspection and Enforcement ra201010114 0~bb3~~0~

\\ ~DR ADOCK PDR.:

R.H. Leasburg

COMMONWEALTH OF VIRGINIA)

)

CITY OF RICHMOND

)

The foregoing document was acknowledged before me, in and for the City and Commonwealth aforesaid, today by W.

L.

Stewart, who is Manager-Nuclear Operations and Maintenance, of the Virginia Electric and Power Company.

He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

4-1n Acknowledged before me this.3 I day of ~ '

19 ~ /

My Commission expires: ---------, 19

~~

  • a__ (!_
  • 7Yt C ~

Notary Public*

(SEAL)

M004