Provides Status of Generic Item B-24 & TMI Action Item II.E.4.2.5,in Response to 811008 Request.Purge Valves Will Be Verified by 820301.Six-month Test to Verify Seal Integrity of 36-inch Valves Will Be Established
ML18139B639
Person / Time
Site: Surry  
Issue date: 12/04/1981
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
References
REF-GTECI-B-24, REF-GTECI-ES, RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.2, TASK-B-24, TASK-OR, TASK-TM 652, NUDOCS 8112070319
Download: ML18139B639 (1)


Text

,.. r e

VIRGINIA ELECTB.IC AND POWER COMPANY RICHMOND~ VIRGINIA 23261 R.H.LEASBURO VxcE PREsxDEN"l" NUCLEAR 0PERA"l"XONS Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attn:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Connnission Washington, D. C. 20555 License Nos.

STATUS OF GENERIC ITEM B - 24 AND COMPLETION OF TMI ACTION *ITEM IL E.4. 2. 5 Gentlemen:

50-280 50-281 DPR-32 DPR-37 We have reviewed your October 8, 1981 letter on the above subject and are hereby submitting the following information as requested.

1.

A change to the technical specifications has not been prepared as we intend to supply qualification data on the subject purge valves as referenced in the Safety Evaluation.

This data is pending certain vendor supplied information and it is projected that qual-ification can be verified by March 1, 1982.

Until proof of qualifi-cation is obtained, our prior commitment to purge only at cold shutdown remains valid.

2.

A six month periodic test will be established to test the 36 inch containment purge valves to verify seal integrity.

Please note that currently these valves cannot be pressurized except through fittings on blank flanges installed each refueling to perform type C testing.

Therefore, some hardware modifications are re-quired prior to implementing a six month leakage test. A proposed Technical Specification change will be prepared and submitted on or about January 1, 1982.

Additionally, the purge valves at Surry are 36 inch rather than 42 inch as referenced in Enclosure 2,Section II and the 8 inch steam jet air ejector valve has been excluded. The steam jet air ejector valve does not employ a resilient seal as referenced by your Safety Evaluation Report.