4 1981
Virginia Electric and Power Company
ATTN:
Mr. R. H. Leasburg, Vice President
Nuclear Operations
P. 0. Box 26666
Richmond, VA
23261
Gentlemen:
Subject:
Report Nos(]§""-280/Si:-z~and 50-281/81-22
~)
This refers to the routine safety inspection conducted by Mr. D. J. Burke of this
office on June 1 - July 31, 1981, of activities authorized by NRC License Nos.
DPR-32 and DPR-37 for the Surry facility.
Our preliminary findings were
discussed with Mr. J. L. Wilson, Station Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In addition to the need for corrective action regarding these specific
violations, we are concerned about the implementation of your management control
system that permitted their occurrence.
Our concerns were discussed with you in
a meeting in this office on August 25, 1981.
We have examined actions you have taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been delayed such
that less than seven days are available for your review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(l), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure. This section further requires the statement to address with
( 8111050362 811016
1 PDR ADOCK 05000280
G
1
I
I
e
Virginia Electric*& Power Company
2
4 1981
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/81-22
and 50-281/81-22
cc vi/encl:
J. H. Ferguson, Executive
Vice President-Power
J. L. Wilson, Sta ti on Manager
bee w/encl:
NRC Resident Inspector
Document Management Branch
Commonwealth of Virginia
Ritk i)
Klandis
8/1. /81
q).,,
RII
J)
HCtce
8/1* /81
°I i,
Sincerely,
R. C. Lewis, *Director
Division of Resident and
Reactor Project Inspection
cltragg
fl z..../81