Category:GENERAL EXTERNAL TECHNICAL REPORTS
MONTHYEARML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20249C0011997-11-30030 November 1997 Reactor Vessel Fluence Analysis Methodology ML18151A1551997-11-30030 November 1997 Vols 1 & 2 of Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors, USI A-46 USNRC GL 87-02. Page 12 in Vol 1 of Incoming Submittal Not Included ML20148E7091997-05-31031 May 1997 Vols 1 & 2 to Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Ors,Usi A-46, Per GL 87-02 ML18151A5241997-02-28028 February 1997 a Pilot Application of RISK-INFORMED Methods to Establish Inservice Inspection Priorities for Nuclear Components at Surry Unit 1 Nuclear Power Station ML18153A6281996-11-12012 November 1996 Simulator Certification Second Four Year Rept (1992-1996). ML18151A7101996-09-30030 September 1996 Supplemental Info for VA Power Nomad Code & Model. ML20249C4051996-05-16016 May 1996 Rev 0 to CE-0082, Review of Augmented ISI Frequency for Pressurizer Spray Lines ML20249C4031996-04-23023 April 1996 Rev 0 to CE-0081, Review of Augmented ISI Frequency for Reactor Coolant Bypass Lines ML18152A1251995-09-30030 September 1995 Category 1 Root Cause Evaluation 95-12 for Undetected Loss of Unit 1 Reactor Coolant Sys Inventory While at Cold Shutdown, for Sept 1995 ML20092A2611995-08-31031 August 1995 EDG Preventive Maint Insp Outage Probabilistic Safety Assessment for August 1995 ML18153B2711995-03-28028 March 1995 Engineering Evaluation 22, Evaluation of Fire Rating for Ventilation Ducts in Turbine Bldg & Battery Rooms - Surry Power Station. ML20078P9261994-09-26026 September 1994 Service Water System Operational Performance Assessment 940711-29 ML18151A1831994-08-31031 August 1994 Licensing Rept for Operation W/Core Rated Power of 2,546 Mwt Surry Power Station Units 1 & 2. ML18153B4211993-07-31031 July 1993 Rev 11 to Engineering Evaluation 24, Evaluation of Radiant Energy Shields,North Anna Power Station. ML18153B4221993-07-31031 July 1993 Rev 11 to Engineering Evaluation 25, Evaluation of Existing Fire Enclosure Around Ventilation Duct,North Anna Power Station. ML18153D2981993-04-12012 April 1993 Engineering Evaluation 22,CH10-22,Rev 11, Evaluation of Fire Endurance Rating for Ventilation Ducts Coated w/Thermo- Lag,Surry Power Station. ML20046D1581993-02-28028 February 1993 Virginia Power Sys Transient Analysis Using Version 1 of North Anna Retran Model. ML18152A0711993-02-0101 February 1993 NFPA Heat & Flame Evaluation of MSA Custom 4500 SCBA Using Enriched O2 Breathing Air for VA Power,Final Rept. ML18153B4231992-11-30030 November 1992 Rev 10 to Engineering Evaluation 16, Evaluation of Radiant Energy Shields,Surry Power Station. ML20116A2901992-09-23023 September 1992 Conceptual Engineering Final Rept NP-2653, RG 1.97 Isolation Devices Type 2,North Anna Power Station. W/One Oversize Encl ML18151A1451992-06-15015 June 1992 Vols 1 & 2 of Control Room Design Review Reassessment Surry Power Station Units 1 & 2. ML20101B0331992-04-30030 April 1992 Suppl to Update of Settlement Monitoring Points & Graphs NAPS - Supplement to Technical Rept CE-0019,North Anna Settlement Data Oct 1989 - Apr 1992 ML20077A6601991-05-0707 May 1991 Summary Rept on Exam of Steam Generator Tube R11-C14,North Anna Power Station,Unit 1 ML18153C3111990-07-26026 July 1990 Decommisioning Financial Assurance Certification Rept for Surry Power Station & North Anna Power Station. ML18153C2231990-05-16016 May 1990 Analysis of Small Steam Line Break Performance W/O Low Pressurizer Pressure Safety Injection,Surry Units 1 & 2. ML20011F6221990-02-26026 February 1990 Analysis of Small Steamline Break Performance W/O Low Pressurizer Pressure Safety Injection North Anna Units 1 & 2. ML20248E8641989-09-19019 September 1989 Rev 0 to Evaluation of Settlement Monitoring Program for Main Plant Structures in Support of Proposed Changes to Tech Spec 3/4.7.12. W/One Oversize Figure ML20246J1391989-08-17017 August 1989 Rev 0 to Safety Sys Outage Mod Insp,Nrc Finding EP-2 ML20246J1581989-08-0909 August 1989 Rev 0 to Safety Sys Outage Mod Insp,Nrc Finding MC-1 ML20246J1261989-07-20020 July 1989 Rev 0 to Coordination of Load Ctr Circuit Breakers,EP-1 ML20246J1191989-07-20020 July 1989 Rev 0 to Response to SSOMI Item IC-8 of NRC ML20246J1071989-07-18018 July 1989 Rev 0 to Response to NRC Ltr of 890626,Serial 89-485,App C, Finding IC-7 ML20246J0991989-07-18018 July 1989 Rev 0 to Response to NRC Ltr of 890626,Serial 89-485,App C, Finding IC-2 ML20246J1481989-06-30030 June 1989 RCS Leakage Detection Sys ML20246K3461989-05-0505 May 1989 Technical Evaluation & Safety Analysis:Solid State Protection Sys Slave Relay Testing REA-88-51 ML18152A1531989-05-0101 May 1989 Final Summary Rept Emergency Diesel Generator Sequencing, Surry Power Station Units 1 & 2. ML20245K7311989-04-26026 April 1989 Rev 0 to 890225 Steam Generator Leak Event Rept ML20056A0341989-04-18018 April 1989 Nonqualified Nuclear Decommissioning Trust Amended & Restated Trust Agreement ML18151A9661989-04-18018 April 1989 Nuclear Decommissioning Trust Agreement. ML18153B5771988-12-29029 December 1988 Main Control Room & Emergency Switchgear Room Air Conditioning Sys. ML18151A2201988-11-30030 November 1988 Simulator Certification Submittal. ML18152A0431988-10-31031 October 1988 Ad-Hoc Endurance Test of Unprotected Steel Duct Sys Final Rept ML20245A5311988-09-13013 September 1988 Simulator Certification Submittal ML18152B1911988-09-0101 September 1988 Rev 1, Evaluation of Flooding of Incore Instrumentation Room Surry Power Station Unit 1. ML18153B5211988-07-26026 July 1988 Containment Liner Test Channels at Surry Power Station Units 1 & 2. ML20148J6311988-03-16016 March 1988 Generator Tube Fatigue Evaluation & Remedial Actions Rept ML20147F5621988-03-0202 March 1988 Safety Evaluation in Support of Containment Temp Increase for North Anna Power Station ML20196J2901988-02-24024 February 1988 Rev 1 to Civil Engineering Technical Rept 0005, Differential Settlement Between Svc Bldg & Unit 2 Main Steam Valve House ML20148J6401988-02-12012 February 1988 Rev 2 to North Anna Unit 1 870715 Steam Generator Tube Rupture Event Rept 1999-10-12
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N9281999-10-20020 October 1999 Special Rept:On 991003,PZR PORV Actuation Mitigated RCS low- Temp Overpressure Transient.Caused by a RCP Facilitating Sweeping of Entrained Air Out of RCS Loops.Operating Procedure 2-OP-5.1 Will Be Revised ML20217H3631999-10-14014 October 1999 Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su ML18152A2811999-10-12012 October 1999 Technical Basis for Elimination of Nozzle Inner Radius Insps (for Nozzles Other than Reactor Vessel),Technical Basis for ASME Section XI Code Case N-619. ML20212J9251999-10-0101 October 1999 Safety Evaluation Accepting Licensee Relief Request IWE-3 for Second 10-year ISI for Plant ML20217D6851999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for North Anna Power Station,Units 1 & 2.With ML18152B3531999-09-30030 September 1999 Monthly Operating Repts for Sept 1999 for Surry Power Station,Units 1 & 2.With 991012 Ltr ML20211N2611999-09-0808 September 1999 Safety Evaluation Concluding That Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit & Clarification of Terminology with Respect to Reconstituted Fuel Assemblies Acceptable ML18152B6651999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Surry Power Station Units 1 & 2.With 990915 Ltr ML20211J2561999-08-31031 August 1999 Safety Evaluation Accepting Elimination of Augmented ISI Program for Pressurizer Spray Lines at North Anna Unit 2 ML20211J2421999-08-31031 August 1999 Safety Evaluation Supporting Removal of Augmented Insp Program on RCS Bypass Lines from Licensing Basis of North Anna,Units 1 & 2 ML20216E5011999-08-31031 August 1999 Monthly Operating Repts for Aug 1999 for Naps,Units 1 & 2. with ML18152B4411999-08-27027 August 1999 LER 99-005-00:on 990731,effluent Radiation Monitors Were Declared Inoperable.Caused by Degraded Heat Trace Circuits for Monitors Sample Suction Line.Degraded Heat Trace Circuit Was Replaced & Addl Heat Trace Is Being Installed ML18152B4421999-08-27027 August 1999 LER 99-006-00:on 990802,determined That Plant Was Outside of App R Design Basis Due to Fire Barrier Deficiencies. Caused by Original Plant Design Deficiencies.Fire Watches Were Established & Mods Have Been Completed.With 990827 Ltr ML18151A3981999-08-13013 August 1999 SPS Unit 2 ISI Summary Rept for 1999 Refueling Outage. ML20210T0791999-08-13013 August 1999 Safety Evaluation Concluding That Revised Withdrawal Schedules for North Anna Units 1 & 2 Satisfy Requirements of App H to 10CFR50 & Therefore Acceptable ML18152B3771999-08-13013 August 1999 LER 99-004-00:on 990714,TS Violation Due to non-safety Related Fans Effect on CR Boundary Was Noted.Cause of Event Has Not Yet Been Determined.Cable Spreading Room Doors Were Operned to Reduce Pressure in Rooms ML20210Q9931999-07-31031 July 1999 Rev 1 to COLR for North Anna Power Station,Unit 2 Cycle 13 Pattern Ud ML20210S1411999-07-31031 July 1999 Monthly Operating Repts for July 1999 for North Anna Power Station.With ML18152B3791999-07-31031 July 1999 Monthly Operating Repts for July 1999 for Surry Power Station,Units 1 & 2.With 990811 Ltr ML18152B3911999-06-30030 June 1999 Monthly Operating Repts for June 1999 for Surry Power Station,Units 1 & 2.With 990713 Ltr ML20209E5641999-06-30030 June 1999 Monthly Operating Repts for June 1999 for North Anna Power Stations,Units 1 & 2.With ML20195E2401999-05-31031 May 1999 Rev 2 to COLR for SPS Unit 2 Cycle 16 Pattern Ag ML20195G1901999-05-31031 May 1999 Monthly Operating Rept for May 1999 for NAPS Units 1 & 2. with ML18152B4341999-05-31031 May 1999 Monthly Operating Repts for May 1999 for Surry Power Station,Units 1 & 2.With 990614 Ltr ML18152B4181999-05-18018 May 1999 LER 99-002-00:on 990425,MSSVs Tested Out of Tolerance for as Found Setpoint.Caused by Minor Setpoint Drift.No Immediate Action Required.Deviation Rept Submitted for Each Valve.With 990518 Ltr ML20206L4831999-05-10010 May 1999 SER Accepting Request to Delay Submitting Plant,Unit 1 Class 1 Piping ISI Program for Third Insp Interval Until 010430, to Permit Development of Risk Informed ISI Program for Class 1 Piping ML18152B4161999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for Surry Power Station Units 1 & 2.With 990512 Ltr ML20206Q6671999-04-30030 April 1999 Monthly Operating Repts for Apr 1999 for North Anna Power Station,Units 1 & 2.With ML18152B4111999-04-28028 April 1999 LER 99-003-00:on 990331,potential Loss of Charging Pumps Was Noted.Caused by Main CR Fire.Station Deviation Was Issued on 990331.With 990428 Ltr ML20205S0391999-04-21021 April 1999 SER Accepting Request for Relief IWE5,per 10CFR50.55a(a)(3) & Proposed Alternatives for IWE2,IWE4,IWE6 & IWL2 Authorized Per 10CFR50.55a(a)(3)(ii) ML18152B6511999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for Surry Power Station Units 1 & 2 ML20205K3041999-03-31031 March 1999 Monthly Operating Repts for Mar 1999 for North Anna Power Station,Units 1 & 2.With ML18153A2741999-03-29029 March 1999 LER 99-002-00:on 990301,prematurely Released Fire Watches Resulted in Violation of TS 3.21.B.7.Caused by Inadequate Procedure.Procedure for Opening & Sealing Fire Stops Was Revised on 990212 ML18153A2681999-03-19019 March 1999 LER 98-013-01:on 981122,turbine/reactor Tripped on High Due to Short Circuit in Summator for MSL C Loop Channel III Flow Transmitter.Replaced 1-MS-FT1494 Summator & Module Repair Procedure Revised.With 9903190 Ltr ML20207K5921999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for North Anna Power Station,Units 1 & 2.With ML18152B7331999-02-28028 February 1999 Monthly Operating Repts for Feb 1999 for Surry Power Station,Units 1 & 2.With 990310 Ltr ML20207E1731999-02-18018 February 1999 Informs Commission of Status of Preparations of IAEA Osart Mission to North Anna Nuclear Power Plant Early Next Year ML18152B5421999-01-31031 January 1999 Monthly Operating Repts for Jan 1999 for Surry Power Station,Units 1 & 2.With 990210 Ltr ML18151A3031999-01-29029 January 1999 ISI Summary Rept for 1998 Refueling Outage,Including Form NIS-1, Owners Rept for ISIs & Form NIS-2, Owners Rept for Repairs & Replacements. ML18152B7261999-01-21021 January 1999 LER 99-001-00:on 981222,auxiliary Feedwater Pipe Support Missed Surveillance.Caused by Personnel Error.Station Deviation Rept Was Submitted.Two Supports in Question Received Required Code Insp & Were Found Acceptable ML20199C8781998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for North Anna Power Station,Units 1 & 2.With ML20205A0241998-12-31031 December 1998 Summary of Facility Changes,Tests & Experiments,Including Summary of SEs Implemented at Plant During 1998,per 10CFR50.59(b)(2).With ML18152B6011998-12-31031 December 1998 Monthly Operating Repts for Dec 1998 for Surry Power Station,Units 1 & 2.With 990115 Ltr ML18152B5781998-12-16016 December 1998 LER 98-014-00:on 981126,manual Reactor Trip in Response to Main Feedwater Regulating Valve Failure Occurred.Caused by Dislocation of Retaining Clip in Positioner.Control Room Operators Placed Unit in Safe,Shutdown Condition ML18152B5811998-12-16016 December 1998 LER 98-013-00:on 981122,turbine/reactor Trip on High SG Level Occurred.Caused by Instrument Failure.Control Room Operators Placed Unit in Safe,Shutdown Condition ML18152B7121998-12-0404 December 1998 LER 98-S01-00:on 981105,noted Failure to Deactivate Station Access Badge.Caused by Human Error.Licensee Will Now Deactivate Station Badges Before Clearance Is Revoked & Process for Badge Deactivations Have Been Strengthened ML20198J5561998-12-0303 December 1998 ISI Summary Rept for North Anna Power Station,Unit 1 1998 Refueling Outage Owner Rept for Inservice Insps ML20198H9541998-12-0303 December 1998 Safety Evaluation Authorizing Proposed Alternative for Remainder of Second 10-yr Insp Interval for Plant ML18152B7041998-12-0101 December 1998 LER 98-012-00:on 981102,noted That EDGs Were Concurrently Inoperable.Caused by Required Testing Per TS 3.16.B.1.a.2. Redundant EDG Was Returned to Svc within Two Hour Period, Following Satisfactory Testing.With 981201 Ltr ML18152B7081998-11-30030 November 1998 Rev 0 to COLR for Surry 1 Cycle 16,Pattern Un. 1999-09-08
[Table view] |