ML18139B485
ML18139B485 | |
Person / Time | |
---|---|
Site: | Surry, North Anna |
Issue date: | 07/28/1981 |
From: | Wiesemann R, Wiesmann R WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
To: | Harold Denton, Eisenhut D Office of Nuclear Reactor Regulation |
Shared Package | |
ML18139B484 | List: |
References | |
CAW-81-44, NUDOCS 8108240257 | |
Download: ML18139B485 (1) | |
Similar Documents at Surry, North Anna | |
---|---|
Category:CORRESPONDENCE-LETTERS
MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20212J9101999-10-0101 October 1999 Forwards SE Accepting Licensee 990916 & 27 Relief Requests IWE-3 for Plant.Se Addresses Only IWE-3 Due to Util Urgent Need for Relief.Requests IWE-7 & IWE-8 Will Be Addressed at Later Date ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML20216F1381999-09-0808 September 1999 Forwards Retake Exam Repts 50-280/99-302 & 50-281/99-302 on 990824.One SRO Applicant Who Received re-take Operating Test Passed re-take Exam ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20211N2531999-09-0808 September 1999 Responds to Request to Exceed 60,000 Mwd/Mtu Lead Rod Burnup in Small Number of Fuel Rods in North Anna Unit 2.Informs That NRC Offers No Objection to Requested Use of Rods in Reconstituted Fuel Assembly.Se Supporting Request Encl ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211J2211999-08-31031 August 1999 Approves Request to Remove Augmented ISI (Aii) Program for RCS Bypass Lines from North Anna Licensing Basis.Se Re Request to Apply LBB to Eliminate Augmented Insp Program on RCS Bypass Lines Encl ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML20211B3871999-08-17017 August 1999 Requests Permission to Routinely Discharge from SW Reservior to Waste Heat Treatment Facility Under Existing Vpdes Permit Through Outfalls 108 & 103.Discharges Are Scheduled to Commence on 990907,due to High Priority Placed on Project ML20210T0671999-08-13013 August 1999 Informs of Completion of Review of Proposed Revs of Schedule for Withdrawal of Rv Surveillance Capsules Submitted by VEPCO on 981217.Approves Proposed Revs.Forwards Safety Evaluation ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210N2921999-08-0505 August 1999 Discusses Which Submitted Proposed TSs Bases Change for Containment Leakage. Licensee Changes to Bases May Be Subj to Future Insps or Audits ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl 1999-09-08 Category:INCOMING CORRESPONDENCE MONTHYEARML18152B3571999-10-22022 October 1999
[Table view]Requests Relief from Temporary Repair of Through Wall Leak Discovered on 30 Inch Component Cooling Heat Exchanger Discharge Pipe Associated with Service Water Sys Common to Surry Units 1 & 2 ML20217K4391999-10-18018 October 1999 Provides Response to RAI to Support USI A-46 Program Submittal for North Anna Power Station,Units 1 & 2.Rev 10 to BNL Rept 52361,encl ML20217H3301999-10-14014 October 1999 Forwards Rev 0 to COLR for North Anna 2 Cycle 14 Pattern Su. No New Commitments Intended by Ltr ML18152B3581999-10-14014 October 1999 Submits Response to Violations Noted in Insp Repts 50-280/98-201 & 50-281/98-201.Corrective Actions:Visual Insps Were Completed on Accessible Coatings Inside Containment for Both Units 1 & 2 ML18152B3541999-10-12012 October 1999 Requests Use of Code Case N-532 & N-619,per Provisions of 10CFR50.55a(a)(3).Detailed Info Supporting Request,Encl. Attachment 2 Includes Technical White Paper That Provides Further Technical Info ML20216K1681999-10-0101 October 1999 Forwards Vols I-VIII of Rev 35 to UFSAR for Naps.Rev Also Includes Update to Chapter 17 of Ufsar,Which Contains Operational QA Program.Changes to Program Description Do Not Reduce Commitments Contained Therein ML18152B3401999-09-27027 September 1999 Requests That Ma Walker Be Removed from List of Individuals Scheduled to Take Exam IAW Guidance Provided in NUREG-1021, Operator Licensing Exam Stds for Power Reactors ML18152B3391999-09-27027 September 1999 Forwards Revised Relief Request IWE-3,which Now Includes Addl Visual Exam Requirement After post-repair or Mod Pressure Testing Is Completed,Per Telcon with NRC ML20212G5091999-09-22022 September 1999 Forwards in Triplicate,Applications for Renewal of Licenses for Listed Individuals.Encls Withheld,Per 10CFR2.790(a)(6) ML18152B3381999-09-21021 September 1999 Forwards in Triplicate,Applications for Renewal of License for Bf Jurewicz & JW Heide.Without Encls ML18152B6671999-09-17017 September 1999 Forwards Two NRC Forms 536,containing Info on Proposed Site Specific Operator Licensing Exam Schedules & Estimated Number of Applicants Planning to Take Exams And/Or Gfes,In Response to NRC Administrative Ltr 99-03 ML18152B3331999-09-17017 September 1999 Forwards Revised 180-day Response to NRC GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated Valves. ML18152B3341999-09-16016 September 1999 Requests Relief from Specific Requirements of Subsection IWE of 1992 Edition with 1992 Addenda of ASME Section XI Re Containment Liner Examination Requirements,For North Anna & Surry Power Stations ML18152B4521999-09-14014 September 1999 Forwards Comments on Review of Preliminary Accident Sequence Precursor Analysis of Operational Event That Occurred at Plant,On 980508,as Reported in LER 98-009 ML18152B4501999-09-0808 September 1999 Submits in Triplicate,Application for Renewal of License for Rd Scherer,Iaw 10CFR55.57.Requests That Certification of Medical Exam by Facility Licensee,Nrc Form 396,be Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML18152B4471999-09-0101 September 1999 Requests That NRC Remove Listed Labels from Distribution ML20211L9151999-09-0101 September 1999 Forwards Response to NRC Request for Comments Re Closure of Review of Response to GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211H4131999-08-27027 August 1999 Informs That Util Revised Encl Bases for TS 2.2.1, Reactor Trip Sys Instrumentation Setpoints, Discussing Steam Flow/ Feed Flow Mismatch Portion of Steam Flow/Feed Flow Mismatch & Low SG Water Level Reactor Trip Setpoint ML18152B3711999-08-27027 August 1999 Forwards LER 99-005-00,per Plant TS Table 3.7.6.Rept Has Been Reviewed by Station Nuclear Safety & Operating Committee.Commitment Made by Util,Listed ML18152B3851999-08-23023 August 1999 Forwards Revised TS Basis Pages for TS 3.1.B,deleting Reactor Vessel Toughness Data Duplicated in Ufsar.Ref to Applicable UFSAR Section Included in TS Basis ML20138B3241999-08-23023 August 1999 Forwards Draft Response to Question 1 Re NAPS USI A-46 ML20211D9041999-08-20020 August 1999 Forwards Revised Pages to Third Ten Year ISI Program & Relief Requests, Replacing Pages in 990408 Submittal ML18152B3681999-08-20020 August 1999 Submits 30-day Rept Re Two Instances in Which Conditions of Approval in Coc Were Not Observed in Making Shipment.Two Type B Shipments Using Model CNS 8-120B Package Were Made After Expiration of QA Program Approval Between 990531-0628 ML18152B3661999-08-20020 August 1999 Provides Medical Status Rept for E Washington,As Required by License Conditions.Summary of E Washington Current Physical Exam & Pertinent Lab Data Attached.Encl Withheld,Per 10CFR2.790(a)(6) ML18152B3651999-08-20020 August 1999 Requests Removal of License Condition from Sh Wightman Operator License SOP-21538.Updated NRC Form 396 Is Encl.Form NRC 396 Withheld,Per 10CFR2.790(a)(6) ML18152B3801999-08-18018 August 1999 Forwards Technical Rept NE-1206,Rev 0, Surry Unit 2,Cycle 16 Startup Physics Tests Rept, Summarizing Results of Physics Testing Program Performed After Initial Criticality on 990525 ML18152B3781999-08-13013 August 1999 Forwards ISI Summary Rept for Surry Power Station,Unit 2 for 1999 Refueling Outage.Rept Provides Summary of Examination Performed During Outage for Third ISI Interval.No New Commitments Were Made ML18152B3751999-08-13013 August 1999 Forwards LER 99-004-00,IAW 10CFR50.73.Commitment Made by Util,Listed ML20210Q9841999-08-12012 August 1999 Forwards Rev 1 to Vepc COLR for North Anna Unit 2,Cycle 13 Pattern Ud, Per TS 6.9.1.7.d.COLR Was Revised to Include Temp Coastdown Operation at End of Cycle 13 ML20210Q7661999-08-0606 August 1999 Requests Exception to 10CFR50.4 Requirement to Provide Total of Twelve Paper Copies When Submitting Surry & North Anna UFSAR Updates.Seek Approval to Submit Only Signed Original & One CD-ROM Version,Per Conversation with J Skoczlas ML18152B4081999-08-0606 August 1999 Forwards Response to NRC 990520 & 0525 RAIs Re North Anna & Surry Responses to GL 95-07, Pressure Locking & Thermal Binding of SR Power-Operated Gate Valves. ML18152B4091999-08-0505 August 1999 Forwards Vepc semi-annual fitness-for-duty Program Performance Data Rept for 990101-990630,IAW 10CFR26.71(d) ML20210J8861999-08-0202 August 1999 Provides Clarification to Commitment Made in Identifying Extent by Which Existing Plant Design Complied with RG 1.97,specifically Re Variable, Radiation Exposure Rate ML18152B4001999-07-29029 July 1999 Requests Relief from Certain Impractical Requirements of ASME Section XI Code Associated with Partial Exams Conducted During 1998 Surry Unit 1 Refueling Outage.Relief Request SR-020 Encl ML18152B3981999-07-28028 July 1999 Forwards 60-day Response to GL 99-02, Lab Testing of Nuclear-Grade Activated Charcoal. Commitments Contained in Ltr,Listed ML20210F6121999-07-28028 July 1999 Forwards Supplemental Info on Proposed Irradiation of Fuel Rods Beyond Current Lead Rod Burnup Limit,Documenting Info Provided During 990624 Meeting & Suppl Original Submittal ML18152B3971999-07-26026 July 1999 Provides Estimates of Licensing Actions Expected to Be Submitted in Fys 2000 & 2001,in Response to NRC AL 99-02 ML18152B3991999-07-23023 July 1999 Requests That License for Jz Laplante Be Canceled as License Is No Longer Required ML18152B3961999-07-23023 July 1999 Forwards Preliminary,Uncertified License Application & Medical Certification for License to Operate Surry Power Station Units 1 & 2 for Ds Cobb.Encl Withheld,Per 10CFR2.790 (a)(6) ML18151A6281999-07-23023 July 1999 Forwards Revised Epips,Including Rev 19 to EPIP-4.02,rev 14 to EPIP-4.16,rev 8 to EPIP-4.21 & Rev 7 to EPIP-4.30.EP & EPIPs Continue to Meet Stds of 10CFR50.47(b) ML18152B3931999-07-16016 July 1999 Forwards Updated NRC Form 396 & Ltr,Which Documents Medical Status of Mb Gross,License SOP-20476-2.Encl Withheld from Public Disclosure,Per 10CFR2.790(a)(6) ML20209E7621999-07-0909 July 1999 Provides Addl Info to Justify Use of Less than One Gpm Detectable Leakage Rate to Establish Required Margin for Crack Stability in LBB Analysis,Per 980623 Application on Reactor Coolant Loop Bypass Lines 05000338/LER-1999-005, Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl1999-07-0808 July 1999 Forwards LER 99-005-00,IAW 10CFR50.73.Commitment Made by Util Encl ML18152B4401999-07-0101 July 1999 Informs NRC That on 990511,Dominion Resources,Inc,Executed Amended & Restated Agreement & Plan of Merger with Consolidated Natural Gas Co ML18152B4371999-06-24024 June 1999 Forwards Response to NRC Request for Clarification of Relief Requests Submitted on 990212,requesting Relief from Performing Hydrostatic Testing for Certain Small Diameter Class 1,RCS Pressure Boundary Connections ML18152B4361999-06-22022 June 1999 Forwards Response to RAI Re Surry & North Anna Power Stations,Units 1 & 2,per GL 96-06 ML20196F1151999-06-22022 June 1999 Forwards Relief Requests NDE-047 & NDE-048 for North Anna Power Station,Unit 1 Re ASME Section XI ISI Program ML20212J2951999-06-22022 June 1999 Forwards Corrected Markup & Typed Version of Affected Pages. Requests That Attached Pages for Those Previously Provided in 990506 Submittal Be Replaced & Incorporated Into NRC Review of Proposed TS ML20195J7011999-06-15015 June 1999 Forwards Revised EPIP 2.01 Which Corrects Typo That Was Found in Step 10 of Procedure.Rev Does Not Implement Actions That Decrease Effectiveness of EP ML18152B4301999-06-0303 June 1999 Informs of Util Intention to Revise Schedule for Submittal of License Renewal Applications for Surry & North Anna Power Stations to March 2002 1999-09-08 Category:VENDOR/MANUFACTURER TO NRC MONTHYEARML20043H9431990-04-27027 April 1990
[Table view]Requests Withholding of Proprietary WCAP-12351, North Anna Unit 1 Evaluation for Tube Vibration Induced Fatigue, from Public Disclosure Per 10CFR2.790 ML20246D7521989-08-0404 August 1989 Requests That Proprietary Topical Rept WCAP-12349, North Anna Unit 1 Steam Generator Update Tube Bundle Structural Integrity Presentation, Be Withheld (Ref 10CFR2.790) ML20244B7031989-05-23023 May 1989 Requests That Rev 1 to North Anna Unit 1 890225 Steam Generator Leak Event Rept Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20012D7581989-05-0303 May 1989 Requests That Proprietary WCAP-12265, North Anna Unit 2 Evaluation for Tube Vibration Induced Fatigue, Be Withheld from Public Disclosure (Ref 10CFR2.790) ML20245K7281989-04-19019 April 1989 Requests That Proprietary Steam Generator Leak Event Rept, Be Withheld from Public Disclosure,Per 10CFR2.790(b)(4) ML20155D1571988-08-12012 August 1988 Requests That Proprietary WCAP-11929, Safety Evaluation: Zirconium Base Advanced Cladding Matls Usage in North Anna Unit 1 Demonstration Fuel Assemblies, Be Withheld,Per 10CFR2.790(b)(4) NRC-87-3280, Forwards Type I & II Ltrs Re Steam Generator Tube Rupture Event,In Response to Request for Info on Generic Implications of Tube Rupture for Use in Preparing Presentation to NRC on 871109.Part 21 Related1987-10-28028 October 1987 Forwards Type I & II Ltrs Re Steam Generator Tube Rupture Event,In Response to Request for Info on Generic Implications of Tube Rupture for Use in Preparing Presentation to NRC on 871109.Part 21 Related NRC-87-3266, Forwards Proprietary WCAP-11601 & Nonproprietary WCAP-11602, North Anna Unit 1 Steam Generator Tube Rupture & Remedial Actions Technical Evaluation & Application for Withholding of Proprietary Info (Ref 10CFR2.790)1987-09-23023 September 1987 Forwards Proprietary WCAP-11601 & Nonproprietary WCAP-11602, North Anna Unit 1 Steam Generator Tube Rupture & Remedial Actions Technical Evaluation & Application for Withholding of Proprietary Info (Ref 10CFR2.790) ML20235K4141987-09-23023 September 1987 Requests Proprietary WCAP-11601, North Anna Unit 1 Steam Generator Tube Rupture & Remedial Actions Technical Evaluation, Be Withheld from Public Disclosure (Ref 10CFR2.790) NRC-87-3261, Forwards Proprietary North Anna 1 Steam Generator Tube Rupture & Remedial Actions Technical Evaluation. Rept Withheld (Ref 10CFR2.790)1987-09-13013 September 1987 Forwards Proprietary North Anna 1 Steam Generator Tube Rupture & Remedial Actions Technical Evaluation. Rept Withheld (Ref 10CFR2.790) NRC-87-3208, Forwards Proprietary Info Re Plant Demonstration Fuel Assemblies.Encl Withheld (Ref 10CFR2.790)1987-03-11011 March 1987 Forwards Proprietary Info Re Plant Demonstration Fuel Assemblies.Encl Withheld (Ref 10CFR2.790) ML20207R9291987-03-11011 March 1987 Requests Withholding of Proprietary Info Re Plant Demonstration Fuel Assemblies from Public Disclosure (Ref 10CFR2.790) ML20205S4511987-03-10010 March 1987 Requests Withholding of Proprietary Viewgraphs from 870305 Meeting Re Steam Generator Tube Integrity from Public Disclosure Per 10CFR2.790.Affidavit Encl NRC-87-3201, Forwards Nonproprietary & Proprietary Viewgraphs of Facility Demonstration Assembly Irradiation Program,Per NRC Request for Info Re Use of Advanced Fuel Rod Cladding.Proprietary Viewgraphs Withheld (Ref 10CFR2.790)1987-02-0505 February 1987 Forwards Nonproprietary & Proprietary Viewgraphs of Facility Demonstration Assembly Irradiation Program,Per NRC Request for Info Re Use of Advanced Fuel Rod Cladding.Proprietary Viewgraphs Withheld (Ref 10CFR2.790) ML20210T0781987-02-0505 February 1987 Requests That Encl Proprietary Viewgraphs of Facility Demonstration Assembly Irradiation Program Be Withheld (Ref 10CFR2.790) NRC-86-3160, Submits Updated List of Plants Affected by Changes in ECCS Evaluation Model Described in Rev 1 to Addendum 3 to WCAP-9561-P1986-09-0808 September 1986 Submits Updated List of Plants Affected by Changes in ECCS Evaluation Model Described in Rev 1 to Addendum 3 to WCAP-9561-P ML20213D7921986-08-20020 August 1986 Requests Proprietary WCAP-11163, Technical Bases for Eliminating Large Primary Loop Pipe Rupture as Structural Design Basis for North Anna Units 1 & 2, Be Withheld (Ref 10CFR2.790) ML18143B6171985-09-0909 September 1985 Requests Proprietary WCAP-10916, Steam Generator Girth Weld Number Six Repair Rept Be Withheld (Ref 10CFR2.790). Affidavit Encl ML18142A0481984-08-0707 August 1984 Requests Proprietary Comparison to Alternate Code Calculations Be Withheld (Ref 10CFR2.790).Affidavit Encl ML18139B4851981-07-28028 July 1981 Requests That Vendor Proprietary Info Forwarded in Util 810724 Ltr Re High Pump Burnup Radiological Consequences Be Withheld (Ref 10CFR2.790).Authorizes Use of Original Affidavit AW-76-51 Dtd 761018 ML20040C2661980-12-23023 December 1980 Application for Withholding Proprietary Summary Rept: Westinghouse Reactor Vessel Level Instrumentation Sys for Monitoring Inadequate Core Cooling (Microprocessor Sys). ML19320A9631980-06-25025 June 1980 Lists Topical Repts for Which Responses to Outstanding Questions Will Be Provided to Allow SER to Proceed & to Avoid Delays in Approval of Full Power Operation.Includes WCAP-9226,-9230 & -9236 ML18082A4921980-05-12012 May 1980 Forwards Schedule for Evaluation of Westinghouse Steam Generator Row One U Bends.Requests Delay of NRC Issuance of Generic Ltrs to near-term OL Plants Requiring Plugging of Row One Tubes,In Confirmation of 800415 Meeting ML19312D1861980-03-14014 March 1980 Forwards Turbine Disc Integrity Task Force Concensus Response to Generic Questions Contained in NRC 800225 Ltr Re Turbine Disc Integrity.Portions Withheld (Ref 10CFR2.790) ML19296C4721980-02-20020 February 1980 Forwards Corrected Copy of Matl Properties of Facility Disc 4 & Tables of A/Acr.Encls Withheld (Ref 10CFR2.790) ML19305B9591979-11-0707 November 1979 Discusses Undetectable Failure in Engineered Safety Features Actuation Sys.Failure of P-4 Permissive Circuit in Both Redundant Protection Trains Could Result in Failure of Sys to Automatically Initiate Protective Function.Details Encl ML20125B9391979-11-0505 November 1979 Notifies That Westinghouse Briefed Utils Re Problems W/ Stress Corrosion Cracking in Westinghouse Low Pressure Rotors & Problems w/1,800 Rpm Low Pressure Turbines, Reportable Per 10CFR50.55(e) or 10CFR21.W/lists of Plants ML20150D3441978-11-28028 November 1978 Advises NRC That Due to Extension of Date for FSAR Submission,B&W Will Defer Submission of Revs to Topical Repts BAW-10026 & 10026P Reactor Vessel Model Flow Tests for 145 Fuel Assembly Cores ML18139B4861976-11-0202 November 1976 Requests That Proprietary Info Forwarded in Vendor 761102 Ltr Re Fuel Rod Design & Fuel Rod Performances Be Withheld (Ref 10CFR2.790).Original Affidavit AW-76-51 Dtd 761018 Encl ML20087B6881975-12-16016 December 1975 Forwards Allied Chemical Corp 751210 Telegram Transmitting Info Re Action Taken to Resolve Problem W/Superior Valves. Util Has Been in Daily Contact W/Allied Chemical Corp & Superior Valve Co 1990-04-27 |
Text
. ! ' ',
e Westinghouse Water Reactor Nuclear Technology Division Electric Corporation Divisions Box355 Pittsburgh Pennsylvania 15230 Mr. Harold Denton, Director July 28, *1981 Office of Nuclear Reactor Regulation CAW-81-44 V* S. Nuclear Regulatory Commission Washington, D. C. 20555
- Attention: D. G. Eisenhut, Director Division of Licensing
SUBJECT:
Surry and North Anna Power Stations - NRC Request for Additional Information - High Burnup Radiological Consequences REF: Application for Withholding Proprietary Information, Ferguson to Denton, August 1981
Dear Mr. Denton:
The proprietary material for which withholding is b2ing requested by Virginia Electric Power Company (VEPCO) is of the same technical type as that pre-viously submitted in connection with a NRC Staff topical review. The previous application for withholding, AW-76-51, November 2, 1976, was accompanied by an affidavit signed by the owner of the proprietary inform&tion, Westinghouse Electric Corporation. This subject proprietary material is being submitted in response to an NRC request for additionaJ information concerning applicability of design decontamination factors to high burnup fuel.
- Further, the affidavit, AW-76-51, *submitted to justify the previous material, is equally applicable to this material. Accordingly, this letter authorized the utilization of the previously furnished affidavit in support of the sub-ject request for information for Virginia Electric Power Company, Surry Units 1 and 2, North Anna Units l and 2.
Correspondence with respect to the proprietary aspects of the application for withholding or the Westinghouse affidavit should reference CAW-81-44, and should be addressed to the undersigned.
Very truly yours,
/bek t obert A. Wiesemann, Manager Regulatory & Legislative Affairs cc: E. C. Shomaker, Esq.
Office of the Executive Legal Director," NRC J. H. Ferguson (VEPCO) 8108240257 8108i'B"'\
PDR ADOCK 05000280' P RDR
.* - - *~.*' '~:-* :**. . -~ -*-~ .. ---*,.-...... **-**- .. I ..