Forwards IE Insp Repts 50-280/81-19 & 50-281/81-20 on 810622-27.No Noncompliance Noted
ML18139B475
Person / Time
Site: Surry  Dominion icon.png
Issue date: 07/17/1981
From: Kellogg P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139B476 List:
References
NUDOCS 8108110102
Download: ML18139B475 (2)


See also: IR 05000280/1981019

Text

..

e

w

.. f\\\\.t .co>>!~

---~*-**

Virginia Electric and Power Company

ATTN:

Mr. J. H. Ferguson

JUL 1 '"11881

Executive Vice President-Power

P. 0. Box 26666

Richmond, VA 23261

Gentlemen:

Subject: Report Nos. ~8_9!81~ and 50-281/81-20

YELLOW

~

t, ntCEIVEo ,.

..::/

'-9

  • fJ flUG l O 1981 ~ -7

"

U.S, NUCI.EAR REGI.IL\\TOD

-.

...,.

COMMISSION

.,10,

.1J~/~\\~"'

.....

-'"'

N

This refers to the routine safety inspection conducted by Mr. E. H. Brooks of

this office on June 22-27, 1981, of activities authorized by NRC Operating

License Nos. DPR-32 and DPR-37 for the Surry facility and to the discussion of

our findings held with Mr. J. L. Wilson, Plant Manager, at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed .

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter and the enclosed report will be placed in the NRC's Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this letter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information. If your receipt of this letter has been delayed such

that less than seven days are available for your. review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(l), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure .. This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room .

r 8108A1 Di OOCi a2 0~6861~

PDR

PDR

G

-

1

I I_

e

Virginia Electric and Power Company

2

JUL 1 7 1981

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosure:

Inspection Report Nos. 50-280/81-19

and 50-281/81-20

cc w/encl:

J. L. Wilson, Manager

bee w/encl:

NRC Resident Inspector

Central Files

Local Public Document Room

Washington Public Document Room

Nuclear Safety Information Center

Technical Information Center

Document Management Branch

Commonwealth of Virginia

Sincerely,

P. J. Kellogg, Acting Chief

Reactor Projects Branch #2

Division of Resident and

Reactor Project Inspection

!/J}w/k

PBurnett

7/l~/81

RIM

CEMurphy

7/j?/81

RII

cY'74t-

r'.-.AFGi bson

-rv-7/i 7 /81

I/ .

RII/fr])

MShyml ock

1111181