ML18139B475
| ML18139B475 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 07/17/1981 |
| From: | Kellogg P NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Ferguson J VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18139B476 | List: |
| References | |
| NUDOCS 8108110102 | |
| Download: ML18139B475 (2) | |
See also: IR 05000280/1981019
Text
..
e
w
.. f\\\\.t .co>>!~
---~*-**
Virginia Electric and Power Company
ATTN:
Mr. J. H. Ferguson
JUL 1 '"11881
Executive Vice President-Power
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
Subject: Report Nos. ~8_9!81~ and 50-281/81-20
YELLOW
~
t, ntCEIVEo ,.
..::/
'-9
- fJ flUG l O 1981 ~ -7
"
U.S, NUCI.EAR REGI.IL\\TOD
-.
...,.
COMMISSION
.,10,
.1J~/~\\~"'
.....
-'"'
N
This refers to the routine safety inspection conducted by Mr. E. H. Brooks of
this office on June 22-27, 1981, of activities authorized by NRC Operating
License Nos. DPR-32 and DPR-37 for the Surry facility and to the discussion of
our findings held with Mr. J. L. Wilson, Plant Manager, at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed .
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
inspection report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you:
(a) notify this
office by telephone within ten days from the date of this letter of your
intention to file a request for withholding; and (b) submit within twenty-five
days from the date of this letter a written application to this office to
withhold such information. If your receipt of this letter has been delayed such
that less than seven days are available for your. review, please notify this
office promptly so that a new due date may be established.
Consistent with
section 2.790(b)(l), such application must be accompanied by an affidavit
executed by the owner of the information which identifies the document or part
thereof sought to be withheld, and a full statement of the reasons on the basis
of which it is claimed that the information should be withheld from public
disclosure .. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4).
The information
sought to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within the
specified periods noted above, the report will be placed in the Public Document
Room .
r 8108A1 Di OOCi a2 0~6861~
G
-
1
I I_
e
Virginia Electric and Power Company
2
JUL 1 7 1981
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Enclosure:
Inspection Report Nos. 50-280/81-19
and 50-281/81-20
cc w/encl:
J. L. Wilson, Manager
bee w/encl:
NRC Resident Inspector
Central Files
Local Public Document Room
Washington Public Document Room
Nuclear Safety Information Center
Technical Information Center
Document Management Branch
Commonwealth of Virginia
Sincerely,
P. J. Kellogg, Acting Chief
Reactor Projects Branch #2
Division of Resident and
Reactor Project Inspection
!/J}w/k
PBurnett
7/l~/81
RIM
CEMurphy
7/j?/81
RII
cY'74t-
r'.-.AFGi bson
-rv-7/i 7 /81
I/ .
RII/fr])
MShyml ock
1111181