Forwards IE Insp Repts 50-280/81-14 & 50-281/81-14 on 810401-30.No Noncompliance Noted
ML18139B409
Person / Time
Site: Surry  Dominion icon.png
Issue date: 05/28/1981
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139B410 List:
References
NUDOCS 8106230534
Download: ML18139B409 (2)


See also: IR 05000280/1981014

Text

Virginia Electric and

ATTN:

J. H. Ferguson

Executive Vice

P. 0. Box 26666

Richmond, VA 23261

Gentlemen:

UNITED STATES

e

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

MAY 2 8 1981

Power Company

Pre.s i dent-Powe}( fJ,LE __ C.0£:'YJ.,

Subject: Report Nos. 50-280/81-14 and 50-281/81-14

This refers to the routine inspection conducted by Mr. D. J. Burke of this orr1ce

on April 1 - 30, 1981, of activities authorized by NRC License Nos. DPR-32 and

DPR-37 for the Surry facility and to the discussion of our findings held with

Mr. J. L. Wilson, Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed .

,1, ..

In accordance with 10 CFR 2.790 of the Commission 1 s regulations, a copy of this

letter and the enclosed report will be placed in the NRC 1s Public Document Room.

If the report contains any information that you believe to be exempt from

disclosure under 10 CFR 9.5(a)(4), it is necessary that you:

(a) notify this

office by telephone within ten days from the date of this 1 etter of your

intention to file a request for withholding; and (b) submit within twenty-five

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been delayed such

that less than seven days are available for your review, please notify this

office promptly so that a new due date may be established.

Consistent with

section 2.790(b)(l), such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or part

thereof sought to be withheld, and a full statement of the reasons on the basis

of which it is claimed that the information should be withheld from public

disclosure.

This section further requires the statement to address with

specificity the considerations listed in 10 CFR 2.790(b)(4).

The information

sought to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within the

specified periods noted above, the report will be placed in the Public Document

Room .

Q

e

  • )

~irgihia Electri~ and Power

Company

e

2

MAY 2 81987

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Enclosure:

Inspection Report Nos. 50-280/81-14

and 50-281/81-14

ccw/encl:

J. L. Wilson, Manager

Sincerely,

£..c.

R. C.

w1s,

cting Director

Division of Resident and

Reactor Project Inspection