Requests Postponement Until 820101 for Issuance of Tech Specs Re Mods to Valves in Auxiliary Feedwater Sys.Issuance Should Coincide w/long-term Mod for Pump Automatic Control, Per NUREG-0737
ML18139B264
Person / Time
Site: Surry  Dominion icon.png
Issue date: 04/20/1981
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.1.2, TASK-TM 244, NUDOCS 8104270138
Download: ML18139B264 (2)


Text

  • . **.J e

e VIRGINIA ELECTRIC AND POWER COMPAN~

RICHMONl>, VXRGIN IA. 23261 April 20, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attention:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Gentlemen:

Serial No. 244 NO/LEN:smv Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 AMENDMENT TO OPERATING LICENSES DPR-32 AND DPR 37 SURRY POWER STATION UNITS NO. 1 AND NO. 2 SUPPLEMENT TO PROPOSED TECHNICAL SPECIFICATION CHANGE By a letter dated December 28, 1979 (Serial No. 1178), Virginia Electric and Power Company requested an amendment in the form of changes to the Technical Specifications, to Operating Licenses DPR-32 and DPR-37 for Surry Power Station Units 1 and 2.

The proposed Technical Specification changes were in response to a NRC letter dated September 25, 1979, concerning requirements for auxiliary feedwater systems at Surry Power Station Units 1 and 2.

In accordance with the NRC recommendations, Specification 3. 6-F requires upon instances when the aux-iliary feedwater pumps do not meet operability requirements they be restored to operable status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in hot shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

Subsequent to the September 25, 1979 letter, NUREG 0737 was issued and con-tained the revised requirements to the auxiliary feedwater system.

Included in NUREG 0737 was the requirement to implement the above mentioned Technical Specification by July 1, 1981.

Also, in the long-term, the auxiliary feed-water system was to be modified to provide one pump with capability to operate automatically for 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> independent of any AC power by January 1, 1982.

In order to meet the requirements of the proposed Technical Specifications, a modification is required to existing valves.

A modification to these valves is also required to meet the long-term modification for pump automatic control.

Due to material delivery delay, this modification cannot be complete until Fall of this year.

The proposed Technical Specification changes have not been issued to Vepco to date.

It is requested that issuance be postponed to coincide with the modification required to the auxiliary feedwater system by January 1, 1982.

f

d...,___...

VIRGINIA ELECTRIC AND POWER COMPANY TO Should you have any questions or require additional information, please contact us.

cc:

Mr. James P. O'Reilly, Director Office of Inspection and Enforcement Region II Very truly yours, r__~r:~

/ll'Y Manager - Nuclear Operations and Maintenance