Responds to NUREG-0737.North Anna Meets Dedicated Hydrogen Control Penetration Requirements.Requirements Do Not Apply to Surry.Design Changes Are Being Developed to Add Remote Operated Isolation Valves
ML18139B138
Person / Time
Site: Surry, North Anna  Dominion icon.png
Issue date: 03/05/1981
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-2.E.4.1, TASK-2.K.3.01, TASK-TM 142, NUDOCS 8103100420
Download: ML18139B138 (1)


Text

... -*--. -..... ~,.,

VIRGINIA ELECTIUC ~D POWER COMPANY RICHMOND,VJ:RGlNIA 232(>1 March 5, 1981 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Serial No. 142 NO/RCC:ms U. S. Nuclear Regulatory Commission ~*

I'-.

I

  • ~

Washington, D. C.

20555 1q1,

.:} n~G[/V{i/'\\

Docket Nos. 50-280 50-281 50-338 50-339

Dear Sir:

\\

t; M

11.R

__ \\

,., Q 9 1981 ~-

- I
J~sJ 6.lil;m

,0

£*

  • r.v~r. ~eauu.rf)A!f

'(... "'"" ~ s.;'

~!Tr~Y RESPONSE TO NUR'.Etr'0737 POST TMI REQUIREMENTS SECTION II.E.4.1 - DEDICATED HYDROGEN CONTROL PENETRATIONS NORTH ANNA POWER STATION UNITS 1 AND 2 SURRY POWER STATION UNJTS 1 AND 2 License Nos. DPR-32 DPR-37 NPF-4 NPF-7 This letter is to clarify our position on Section 2.1.5.a of NUREG 0578 and Section II.E.4.1 of NUREG 0737 as stated in our letters Serial Nos. 760 dated 10/24/79, 806 dated 10/25/79, and summarized in letter Serial No. *985 dated 12/15/80.

It is Vepco's position that the systems as currently installed at North Anna Power Station meet the Dedicated Hydrogen Control Penetration requirements of NUREG 0578 and NUREG 0737 and that no further action is required to meet the implementation date of July 1, 1981.

Also, it is Vepco's position that this requirement does not apply to Surry Power Station since internal recombiners are utilized for hydrogen control.

The design changes at North Anna and Surry referenced in Section II.E. 4.1 are being developed to add remote operated isolation valves to the Containment Atmospheric Clean Up System.

The addition of these valves is to reduce personnel exposure, and provide double valve barrier isolation against leak-age as identified in Section II.B.2-11 and II.B.2-17, Post Accident Shielding, of our NUREG-0737 response.

The valves are scheduled to be shipped from the vendor in the middle of March and installation of these valves will be by the required implementation date of January 1, 1982.

If you require additional information or have any questions please contact us.

81031001/JD Very truly yours,

~

Ao:;{t>