ML18139B074

From kanterella
Jump to navigation Jump to search
Forwards LERs 81-006/03L-0 & 81-007/03L-0
Date released: 12/10/2018 Download: ML18139B074


LER 81-007/03L-0:on 810114,at 100% power,PT-27 (Heat Tracing) Revealed Amp Readings for Panels 8 & 9 Circuits Were Below Acceptance Criteria.Caused by Excessive Temps Breaking Down Insulation.Defective Heat Tracing Replaced
ML18139B076
Person / Time
Site: Surry 
Issue date: 02/13/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B076 (2)
LER 81-006/03L-0:on 810114,at Full Power,C Safety Injection Accumulator Found to Have Boron Concentration of 1943 Ppm, 7 Ppm Below Required Limit.Caused by Leakage Through Check Valve 1-SI-144.Valve Isolated
ML18139B075
Person / Time
Site: Surry 
Issue date: 02/13/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B075 (2)
Forwards LERs 81-006/03L-0 & 81-007/03L-0
ML18139B073
Person / Time
Site: Surry 
Issue date: 02/13/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B073 (1)