Forwards IE Insp Repts 50-280/80-36 & 50-281/80-40 on 801020-23.No Noncompliance Noted
ML18139B025
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/12/1980
From: Kenna W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Ferguson J
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139B026 List:
References
NUDOCS 8101290381
Download: ML18139B025 (2)


See also: IR 05000280/1980036

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

Virginia Electric and

ATTN:

J. H. Ferguson

Executive Vice

P. 0. Box 26666

Richmond, VA

23261

Gentlemen: *

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

DEC 1 21980

Power Company

President-Power

This refers to the inspection conducted by T. D. Lee of this office on

October 20-23, 1980, of activities authorized by NRC Operating License

Nos. DPR-32 and DPR-37 at the Surry Power Station and to the discussions

of our findings held with C. P. Sanger and J. L. Wilson at the conclusion

of the inspection.

Areas examined during this inspection included your program for nuclear

material control and accountability under the applicable provisions of

Title 10, Code of Federal Regulations, Part 70,

11Special Nuclear Material,

11

and specific license conditions. Within these areas, the inspection consisted

of selective examinations of procedures and representative records, interviews

with personnel, performance tests, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790(d) of the NRC's

11 Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If *this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclos.ure.

Any such

application must include a full statement of the reasons on the basis of which

is is claimed that the information is proprietary, and should be prepared so that

proprietary information identified in the application is contained in a separate

part of the document.

If we do not hear from you in this regard within the

specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

-~'~-!

I

. ;

.

--

j,' .. A'J . . . .,,__._~-

, . B.

en a, Chief

1-

  • Safeguar~> Branch

Enclosure:

Inspection Report Nos. 50-280/80-36 and

50-281/80-40

Virginia Electric and Power Company -2-

cc:

J. L. Wilson, Manager