ML18139B010

From kanterella
Jump to navigation Jump to search
Forwards LERs 80-050/03L-0 & 80-074/03L-0
Date released: 12/10/2018 Download: ML18139B010


LER 80-074/03L-0:on 801218,power Leads to MOV-1867A & C Discovered to Have Been Reversed.Cause Undetermined.Power Leads Returned to Normal & Valves Tested
ML18139B012
Person / Time
Site: Surry Dominion icon.png
Issue date: 01/15/1981
From:
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B012 (3)
LER 80-050/03L-0:on 801228,amp Reading for Circuit 13A Boron Injection Recirculation to Boric Acid Tank Panel 8 Was Below Acceptance Criteria.Caused by Failure of Heat Tracing Tape Due to Excessive Heat.Heat Tracing Design Change Initiated
ML18139B011
Person / Time
Site: Surry Dominion icon.png
Issue date: 01/15/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B011 (2)
Forwards LERs 80-050/03L-0 & 80-074/03L-0
ML18139B009
Person / Time
Site: Surry Dominion icon.png
Issue date: 01/15/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B009 (1)