Responds to NRC Re Violations Noted in IE Insp Repts 50-280/80-35 & 50-281/80-38.Corrective Actions: Approved Welding Procedure Reviewed to Be Used in Future & Weld Insp Will Be Conducted by New Procedure
ML18139A895
Person / Time
Site: Surry  Dominion icon.png
Issue date: 11/17/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139A894 List:
References
875, NUDOCS 8012170021
Download: ML18139A895 (3)


Text

..

~.

e be,,

/1,, ~'-.

NOV 1 9 198G VI:RGINIA ELECTRIC AND POWER COMPANY RICHMOND, VIBGIN*IA 23261 November 17, 1980 Mr. James *p. P'Reilly*,-*.Dii*ector" Of£+/-ce_of-Inspec:tion and~Enforcement U.

  • S.*
  • Nuclear Regulatory Commission -

Region II

  • _

101 Marietta Street,. Suite 3100 -_

Atlanta, Georgia* 30303

Dear Mr. 0 'Reilly:

Serial No. 875 NO/RMT:ms

- Docket Nos.* 50_~280 281

-License Nos. DPR-32 DPR-:37 We have reviewed._ your letter

  • of October 17,.1980 in inspection _.conducted at *Surry Power Station on September reported in IE Inspection Report - Nos. 50-280/80-35 and responses to the specific infractions are attached.

re£erence to the 9 and lO, 1980 and 50-281/80-38.

Our We have reports.

tion to determined that no proprietary information Accordingly, the Virginia Electric and Power these inspection reports being made a matter is contained in the Company has no obj ec-of public disclosure.

-Attachment cc:

Mr~ Steven A. Varga., Chief Operating Reactors Branch No. 1 Division of Licensing Very truly yours~

~i:

Manager - Nuclear Operations and* Maintenance

V'

/'

NRC COMMENT Attachment

  • Page 2 As required by Criterion XVII of Appendix B to 10 CFR 50 and implemented by VEPCO Topical Report VEP-1-A Section 17 paragraph 17.2.17, states in part that Quality Assurance records relating to **. documentary evidence of

.** activities affecting quality.** include monitoring of work performance, and maintained and are retrievable.

Contrary to the above on* September 10,. 1980, there was no documentary evidence to verify that VEPCO' s NDT group* had monitored vendor work performed relative to IE Bulletin 79-17 NDE inspections.

This is a deficiency.

VEPCO RESPONSE

1.

Corrective action taken and results achieved:

The* work, when performed, was in fact monitored by NDT personnel attached to the station and a memorandum to that. effect has been placed in station records.

Further review of the circumstances revealed that an approved station procedure exists for this monitor-ing effort but had been overlooked in this circumstance.

2 *.

Corrective steps taken to avoid further non-compliance:

The _approved procedure has been. reviewed with all members *of the station NDT staff and will be used in the future.

3.

Date when full compliance will be achieved:

Full. compliance has been achievedo

NRC COMMENT e

SURRY POWER STATION RESPONSE TO NOTICE OF VIOLATION APPENDED TO INSPECTION REPORTS 50-280/80-35 AND 50-281/80-38 e

Attachment Page 1 As required by *Criterion V of Appendix B to 10 CFR* 50 and implemented by VEPCO Topical Report VEP-l-A. Section 17 paragraph 17. 2. 5, states in part that~ ** procedures shall i~clude appropriate quantitative acceptance criteria for determining that important activities have been satisfac-torily accompiished.

Contrary to the above on September 10, 1980, NDE-15.1 "Visual Examination of Nuclear Components did not contain specific acceptance *criteria for initj.al inspection of.welds. fabricated to applicable construction codes.

This is an infraction.

VEPCO RESPONSE

1.

Corrective action taken and results achieved:

VEPCO has approved, for use, a new procedure, NDT 15. 2 (Visual Inspection of Welds) which provides inspection procedures specific

. to weldments.

2.

Corrective steps to avoid further non-compliance:

Weld inspection will be conducted by the new procedure.

3.

Date when full compliance will be achieved:

Full compliance has been achieved.