ML18139A335

From kanterella
Jump to navigation Jump to search
Forwards Caustic Feed Design Analysis,Design Change 77-9: Containment Spray Sys Mod, & Refueling Water Storage Tank - Chemical Addition Tank Drawdown Test,800430. Repts Available in Central Files Only
ML18139A335
Person / Time
Site: Surry  Dominion icon.png
Issue date: 06/18/1980
From: Sylvia B
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Harold Denton, Varga S
Office of Nuclear Reactor Regulation
Shared Package
ML18130A277 List:
References
535, NUDOCS 8006190545
Download: ML18139A335 (1)


Text

VIRGINIA ELECTRIC AND POWER COMPANY RICHMOND, VXBGXN IA 23261 June 18, 1980 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation Attention:

Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Dear Mr. Denton:

Serial No. 535 NO/HEC/jmj Docket Nos. 50-280 50-281 License Nos. DPR-32 DPR-37 As discussed in our letter of June 11, 1980 (Serial No. 501), we are trans-mitting for your review and approval the attached Caustic Feed Design Analysis Report for the Containment Spray System Modification at Surry Power Station.

Included in this report is data concerning the following:

1.

Containment Spray pH versus Time Curves

  • for twelve (12) possible accident scenarios (Part A, Figures 1-12).
2.

Containment Sump pH versus Time Curves (Part A, Figure 13).

3.

Caustic Flow Rate versus Time,Curves (Part B, Pages 13~24).

4.

Caustic Addition Tank Level H_istories (Part B, Pages 25-36).

Also included is the finalized version of the RWST/CAT Drawdown Test which is unrevised from the edition given to your staff in our meeting of May 22, 1980.

Our current start-up schedule for Surry Unit No. 2 is July 5, 1980.

We ask your indulgence in the review of these documents in order to maintain this schedule.

If you have any questions or comments concerning this tranmittal, please do not hesitate to contact us.

Thank you for your cooperation in this matter.

cc:

Mr. James P. O'Reilly., Director Office of Inspection and Enforcement Region II Very truly_,yours,

-ii cf---~

//

j

.. ~., f *-, ~..:.-*~,

  • ../

-~,,-1 B. R. Sylvia Manager - Nuclear

~\\

Operations and Maintenance

~~\\\\

f-),)C..l..l)*

~e~l~

-ro F 1LJ2..S>

Prf-~ t=u.. Mt""7'