Text
'\\,
,11 e
e MAY 2 8 1980 Docket Nos. 50-280 50-281 EA-80-28 Virginia Electric and Power Company ATTN:
J. H. Ferguson Executive Vice President-Power
- Post Office Box 26666 Richmond, VA 23261 Gentlemen:
On April 14, 1980, a truck carrying radioactive waste left your Surry facility for Barnwell, South Carolina.
Subsequent radiation surveys at.Barnwell on April 22 and 23, revealed an area on the outer truck surface with radiation levels approximately 1.4 times regulatory limits.
Our evaluation of this matter indicates the problem was caused by 1improper radiation surveys *of waste drums delivered to a carrier for transport and improper radiation surveys of the transport vehicle after loading.
A similar ev.ent involving surface radiation levels above Department of Transportation regulatory limits was revealed a year ago and discussed in IE Inspection Report No. 50-280/79-16; 50-281/79-24.
These events indicate an inadequacy in-your radiation survey program as it relates to radioactive waste management and shipment.
In this specific case, it was noted that the three separate surveys which were performed during the course of preparing the waste for shipment and i.ts loading onto the t_ransport vehicle failed to detect a package exhibiting high radiation le"els (600-800 mrem/hr).
The specific event and our concerns relative to your survey program in general were discussed in a meeting on April 30, 1980, in the Region II Office in Atlanta, Georgia, between Mr. James P. O'Reilly, Director of Region II and his staff, and Mr. J. H.
Ferguson of your staff.
As the result of our inspection of these matters, and our concerns as discussed during the April 30 meeting, we propose to impose civil penalties for the items of noncompliance set forth in Appendix A to this letter, in a total amount of $8~000.
Appendix B to this letter is a Notice of Proposed Imposition of Civil Penalties.
You are required to respond to this letter, and in preparing your response you should follow the instructions in Appendices A and
- 8.
CERTIFIED MAIL RETURN RECEIPT REQUESTED
\\'
8006130195
t I
I f
I I t I
! I I
i t
i e
MAY 2 8 1980 Virginia Electric and Power Company In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosures will be placed in the Commission 1 s Public Document Room.
Enclosures:
- 1.
Appendix A, Notice of Violation Sincerely,
- Original Signed !7 R. c. ~eYowia*
Victor J. Stello, Jr.
Director Office of Inspection and Enforcement *
- 2.
Appendix B, Notice of Proposed Imposition of Civil Penalties cc:
J. L. Wilson, Manager Post Office Box 315 Surry, VA 23883*
U.S. Department of Transportation ATTN:
William L. Barrow Federal Highway Administration 1720 Peachtree Road, N.W., Suite 200 Atlanta, Georgia Chem-Nuclear Systems, Inc.
ATTN:
Lee Hebbard Site Manager P. 0. Box 726 Barnwell, SC 29812
~
i I
. L,~
y~
~
\\--*
WPU:DM 5/21/80 Job Q
/
FFMsfl~
AGr~~ ~~
IE ELD XOOS:IE s;d~8o iek Jlieberman DThompson 80 51/),180 q
5')-.~/80 lD FA'ld.
-\\tl ~
.)1'1,1-/BfJ
~
DOit DII/J RCD~Young VStello 5;~*7ao 5/.?2::/80