e Reviewed By:
,:, u*/,
-1 I
7l1~fi_<r-,y, 1,-f.. 2-m' ~
M. L. Smith, Supervisor' Nuclear Fuel Engineering Approved By:
/YI~/..~
M. L. Bowling, ~r Nuclear Fuel Engineering CONTROL ROD REACTIVITY WORTH DETERMINATION BY THE ROD SWAP TECHNIQUE BY T. K. ROSS W. C. BECK Approved By:
80 0'514 0 7"~
p VEP-FRD-36 Nuclear Fuel Section Fuel Resources Department Virginia Electric & Power Company Richmond, Virginia May, 1980
CLASSIFICATION/DISCLAIMER The data, techniques, information, and conclusions in this report have been prepared solely for use by the Virginia Electric and Power Company (the Company), and they may not be appropriate for use in situations other than those for which they were specifically prepared.
The Company therefore makes no claim or warranty whatsoever, express or implied, as to their accu-racy, usefulness, or applicability.
In particular, THE COMPANY MAKES NO WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE, NOR SHALL ANY WARRANTY BE DEEMED TO ARISE FROM COURSE OF DEALING OR USAGE OF TRADE, with respect to this report or any 9f the data, techniques, information, or conclusions in it.
By making this report available, the Company does not authorize its use by others, and any such use is expressly forbidden except with the prior writ-ten approval of the Company.
Any such written approval shall itself be deemed to incorpor~te the disclaimers of liability and disclaimers of warranties provided herein.
In no event shall the Company be.liable, under any legal theory whatsoever (whether contract, tort, warranty, or strict or absolute liability), for any property damage, mental or physical injury or death, lo'ss of use of property, or other damage resulting from or arising out of the use,
- authorized or unauthorized, of this report or the data, techniques, informa-tion, or conclusions in it.
i
ABSTRACT The methodology for determining control rod reactivity worth utilizing the rod swap technique is presented.
Data obtained during the startup of Surry Unit 1, Cycle 5 and North Anna Unit 1, Cycle 2, which validates the methodology, is also presented.
This methodology is applicable for conducting control rod reactivity worth tests at Surry and North Anna.
ii
ACKNOWLEDGEMENTS The authors would like to acknowledge the cooperation and support of the Surry and North Anna Power Station personnel in performing the tests documented in this report.
Additionally, we would like to acknowledge the effort of Mr. M. C. Cheak in providing the North Anna design data.
We would like to thank Ms. C. E. Bullock for her patience and accurate typing of the entire report.
iii
TABLE OF CONTENTS SECTION CLASSIFICATION/DISCLAIMER ABSTRACT ACKNOWLEDGEMENTS LIST OF TABLES LIST OF FIGURES
- 1.
INTRODUCTION
- 2.
ROD SWAP REACTIVITY TESTS 2.1 Test Description.
TITLE 2.2 Test Data Analysis Methodology
- 3.
CALCULATIONAL METHODOLOGY 3.1 Introduction.
3.2 PDQ07 Discrete Calculations 3.3 FLAME Calculations 3.4 Design Predictions of the Critical Reference Bank Positions........*...
3.5 Design Predictions of the Integral Worth of Each Test Bank
- 4.
TEST RESULTS EVALUATION METHODOLOGY AND REVIEW CRITERIA 4.1 Background.......
4.2 Rod Swap Test Evaluation and Review Criteria
- 5.
ROD SWAP TEST RESULTS
- 6.
VALIDATION OF THE ROD SWAP METHODOLOGY
- 7.
CONCLUSIONS
- 8.
REFERENCES APPENDIX:
Impact of the Rod Swap Tests on the Hot Zero Power Startup Physics Testing Program for Reload Cores iv PAGE NO.
i ii iii V
vi 1
4 4
5 13 13 14 15 16 17 38 38 39 41 45 49 50 51
LIST OF TABLES TABLE TITLE PAGE NO.
2.1 MEASURED CRITICAL POSITION DATA ADJUSTMENT SUMMA.RY 9
2.2 MEASURED TEST BANK INTEGRAL WORTH
SUMMARY
10 3.1 PREDICTED CRITICAL POSITION
SUMMARY
20 3.2 PREDICTED TEST BANK INTEGRAL WORTH WITH THE REFERENCE BANK AT THE PCP........................
21 3.3 PREDICTED AEST BANK INTEGRAL WORTH WITH THE REFERENCE BANK AT THE MCP 22 3.4 PREDICTED TEST BANK INTEGRAL WORTH SUMMA.RY 23 5.1 ROD SWAP TEST RESULTS 42 6.1 SURRY 1, CYCLE 5 ROD WORTH RESULTS 47 6.2 NORTH Ai.'ffi'A 1, CYCLE 2 ROD WORTH RESULTS 48 A.l HOT ZERO POWER STARTUP PHYSICS TESTING PROGRAM 52
- A.2 HOT ZERO POWER STARTUP PHYSICS TESTING PROGRAM WITH ROD SWAP..........................
53 V
LIST OF FIGURES FIGURE TITLE PAGE NO.
2.1 SURRY UNIT 1, CYCLE 5-MEASURED REFERENCE BANK WORTH, B BANK WITH ALL OTHER BANKS OUT..................
11
- 2. 2 NORTH A.i.'rnA UNIT 1, CYCLE 2-MEASURED REFERENCE BANK WORTH, D BANK WITH ALL OTHER BANKS OUT 12 3.1 SURRY UNIT 1, CYCLE 5-PREDICTED REFERENCE BANK WORTH, B BANK WITH D BANK IN 24 3.2 SURRY UNIT 1, CYCLE 5-PREDICTED REFERENCE BA.i.~K WORTH, B BANK WITH C BANK IN 25 3.3 SURRY UNIT 1, CYCLE s~PREDICTED REFERENCE BANK WORTH, B BANK WITH A BA.i.~ IN 26 3.4 SURRY UNIT 1, CYCLE 5-PREDICTED REFERENCE BANK WORTH, B BANK WITH SB BANK IN..................
2 7 3.5 SURRY UNIT 1, CYCLE 5-PREDICTED REFERENCE BANK WORTH, B BANK WITH SA BANK IN..................
28 3.6 NORTH ANNA UNIT 1, CYCLE 2-PREDICTED REFERENCE BANK WORTH, D BANK WITH C BA.i.~ IN 29 3.7 NORTH ANNA UNIT 1, CYCLE 2-PREDICTED REFERENCE BANK WORTH, D BANK WITH B BAJ.1K IN 30 3.8 NORTH A.i.'rnA UNIT 1, CYCLE 2-PREDICTED REFERENCE BANK WORTH, D BAJ.~ WITH A BANK IN 31 3.9 NORTH ANNA UNIT 1, CYCLE 2-PREDICTED REFERENCE BANK WORTH, D BAJ.~ WITH SB BANK IN 32 3.10 NORTH ANNA UNIT 1, CYCLE 2-PREDICTED REFERENCE BAJ.~ WORTH, D BAJ.~ WITH SA BAJ.~ IN...
33 3. 11 SURRY UNIT 1, CYCLE 5 ~REDICTED REFERENCE BAJ.~ WORTH, B BANK WITH ALL OTHER BANKS OUT 34 3.12 NORTH ANNA UNIT 1, CYCLE 2-PREDICTED REFERENCE BA.i.~ WORTH, D BANK WITH ALL OTHER BANKS OUT 35 3.13 NORTH ANNA UNIT 1, CYCLE 2-DETERMINATION OF ~~(M) FOR TEST BAJ.~ C 36 3.14 NORTH A.i.'rnA UNIT 1, CYCLE 2-DETERMINATION OF ~Rp(M) FOR TEST BANK C....'................
37 5.1 SURRY UNIT 1, CYCLE 5-REFERENCE BANK WORTH, B BANK WITH ALL OTHER BANKS OUT 43
- 5. 2 NORTH ANNA UNIT 1, CYCLE 2-REFERENCE BAJ.~ WORTH, D BANK WITH ALL OTHER BANKS OUT 44 vi
Section 1
. INTRODUCTION The purpose of the control rod bank worth tests, which are performed
- as.part of the startup physics testing program, is to verify selected design statepoint calculations and thereby demonstrate the validity of the results*
of the calculational models used to predict control rod bank reactivity worths a~ part of the design process.
This is done through a comparison of measured and predicted results for those selected design statepoints.
The Vepco control rod b~rik worth tests traditionally have been performed using.the dilution/boration techniqu~.
The dilution/boration technique involves exchanging the reactivity associated with the control rod bank of interest with the reactivity associated with the boron in the reactor coolant system (RCS), i.e., as control rocis are inserted into the core, primary grade water is put into the RCS sei that the boron concentration of the reactor coolant system is diluted.
During this process, the core is kept nominally critical.
The amount of each control rod bank motion is strictly limited such that the reactivity value associated with each movement is*within the reliability range of the reactivity computer, which
- is used to monitor core reactivity and directly measure the reactivity worth of the control rod banks.
The dilution/boration rate is established such that the reactivity exchange rate is compatible with the operational requirements of the reactivity computer.
Typically, the reactivity exchang~ rate is 300 to 500 pcm/hour.
For a typical reload cycle, the measured control rod bank reactivity has been approximately 5500 pcm (four control banks successively inserted).
This results in a measurement time of between 22 and 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br /> (measurements are made during control rod bank insertion and withdrawal).
l
The measurement of the reactivity worth of the control rod banks using the rod swap technique is an alternate method that can be used to verify control rod worths.
The *rod swap technique has been devise.cl in order to reduce the amount of time associated with the measurement of the reactivity worth of the control rod banks wi.thout sacrificing any of the essential information that is derived from the performance of these tests relative to the current test methods.
The benefits associated with the rod swap technique include:
- 1) the reactivity worths of all the rod-banks (control and shutdown) are determined (in the past~ the reactivity worths of the shutdown batiks were not measured).
- 2) the time associated with the measurement of the reactivity worths of the control rod banks is greatly reduced, and
- 3) the boron recovery processing requirements (associated with RCS boration/dilution) are greatly reduced.
- rmplementation of this program enhances overall nuclear availability.
In addition to the conventional control rod bank reactivity tests, reactivity tests using. the rod swap technique were performed during the initial startup of Surry 1, Cycle 5 and North Anna 1, Cycle 2.
These side-by-side demonstration.programs were performed in order to establish the technical basis for validating the rod swap methodology. ~e purpose of this report is to present a description of the.rod swap methodology and the results of the side-by-side demonstration programs mentioned above; and show that the results of these programs validate the use of the rod swap methodology in future Vepco physics testing programs.
Section 2 of this report contains a description of the rod swap test procedure and the associated data analysis methodology.
Section 3 describes the calculational methods used to predict the rod swap test results.
Section 4 contains a description of the rod swap test results evaluation meth9dology 2
e and review criteria.
Section 5 presents the rod swap test results.
Section 6 presents the validation of the rod swap methodology through a comparison of the results of the side-by-side demonstration programs, and Section 7 presents the conclusions that can be drawn from the validation of the rod swap methodology.
The Appendix provides a description of the changes to the zero power physics testing program that will occur as a result of implementing the rod swap program.
The applicability of this report encompasses the use of the rod swap methodology by Vepco for the Surry and North Anna Power Stations.
3
e Section 2 ROD SWAP REACTIVITY TESTS 2.1 Test Description The objective of the rod swap tests is to measure the reactivity worth of each control rod bank.
The first step in the rod swap procedure is to dilute the most reactive control rod bank (hereafter referred to as the reference bank) into the cor.e and measure its reactivity worth using conven-tional test techniques.
The dilution rate is selected so that the rate of change of core reactivity is approximately 300 pcm per hour.
At the completion of the reference bank reactivity worth measurement, the*reactor coolant system temperature and boron concentration are stabilized such that the reactor is critical with the reference bank at or near full insertion.
At this point, a boron endpoint determination is made, and an isothermal temperature coeffi-cient test is performed. Initial statepoint data for.a rod swap maneuver are obtained by moving the reference bank to its fully inserted position, if neces-sary, and recording the core reactivity and moderator temperature.
A rod swap maneuver is performed by*withdrawing the reference bank while one of the other control rod banks. (i.e., a test bank) is inserted.
The core is kept nominally
- critical throughout this rod swap and the maneuver is continued until the test bank is fully inserted and the reference bank is at the position at which the core is just critical. This measured critical position (MCP) of the reference bank with the test bank fully inserted is the major parameter of interest since it is a measure of the reactivity worth of the test bank.
Statepoint data (core reactivity and moderator temperature) are recorded with the reference bank at the MCP.
The reference bank is alternately withdrawn and inserted a small amount about the MCP in order to measure the differential reactivity worth.of the reference bank over this region.
The rod swap maneuver is performed 4
in reverse order such that the reference bank once again is at or near full insertion and the test bank is once again fully withdrawn from the core.
Statepoint data (rod.position, core reactivity, and moderator temperature) are recorded in order to confirm RCS boron concentration stability.
The rod swap process is then repeated for all of the other control rod banks (control and*shutdown).
In summary, conventional dilution/boration test data are obtained in order to determine the reactivity worth of the reference bank inserted alone.
Rod swap test data are obtained in order to determine the reactivity worth of each test bank with the reference bank partially inserted in the core.
2.2 Test Data Analysis Methodology
_The reactivity worth of the reference bank is determined* using the standard.analysis techniques associated with dilution/boration rod worth test data.
The reactivity worth of each test bank is determined from the measured reference bank reactivity worth data a_nd the measured critical position data.
As outlined in Section 2.1, the data that are recorded during the tests incluqe the following:
- 1) the integral and differential reactivity worth of the reference bank with all other control rod banks withdrawn from the core,
- 2) the critical RCS boron concentration associated with the reference bank being fully inserted. in. the core with all other control rod banks withdrawn from the* core,
- 3) the isothermal temperature coefficient associated with the reference bank being fully inserted in the core with all other control rod banks withdrawn from the core,
- 4) the critical position of the reference bank associated with each of the control rod banks being individually fully inserted in the core, 5
e e
- 5) the core reactivity and moderator temperature associated with the reference bank being fully inserted alone, and the reference bank being at the measured critical positions identified in Item 4,
- 6) the differential reactivity worth of the reference bank in the region of the measured critical positions identified in Item
- 4.
Items 1, 2, 3, 5, and 6 represent data that are obtained and analyzed using the current standard testing and analysis procedures.
The measured critical reference bank position data, Item 4, are also analyzed in a straightforward manner.
The analysis accounts for off-nominal conditions that may have existed during the test.
These may include the following:
A) variations in the moderator temperature, B) variations in the RCS boron concentration, C) deviations from criticality with the reference bank fully inserted alone, and D) deviations from criticality with the reference bank at the measured critical position (MCP) and the test bank fully inserted.
The reactivity effects of Items A and B can be minimized through strict control of the RCS temperature and boron concentration during the test and can be quantified based on the test data.
The reactivity effects of Items C and Dare measured directly by the reactivity computer during the test.
Equation (1) is used to adjust the measured critical position data to account for off-nominal test conditions.
6
Where:
(~~)
( 1)
= the measured critical position of the reference bank adjusted for off-nominal test conditions.
- the measured critical position of the reference bank.
= the increase in moderator temperature.during the test.
= the isothermal temperature coefficient measured with the reference bank fully inserted alone.
= the increase in RCSl?oron concentration during the test.
= the boron worth coefficient.
= the core reactivity measured with the reference bank fully inserted alone.
= the core reactivity measured with the reference bank at the MCP and the test bank fully inserted *.
= the measured differential reactivity worth of the reference bank in the region of the MCP.
These data adjustments were quantified a/3 part of the data analysis of the rod swap tests performed during the startup of Surry 1, Cycle -5 and North Anna 1, Cycle 2, and are summarized in Table 2.1. It can be seen from the information in this table that the* data adjustments.are usually very small.
The reactivity worth of each test bank is determined from the measured reference bank reactivity worth data and the MCPA of the reference bank for each test bank using the following basic reactivity balance equation:
7
I Where:
~R(M)
(2)
= the measured total integral reactivity worth of the reference bank inserted alone.
=the.measured integral reactivity wortb of the reference bank inierted alone.from the.fully withdrawn position to
. the MCP.
.= the total integral reactivityAworth of the test bank with the reference bank at the MCP.
As described previously; the: value of the total integral reactivity worth of the reference bank inserted al~ne,- RM; is determined using. the dilution/
boration measurement a:nd analysis techniques.
M The value of.6.R -(M) for each
'test bank i~ determined from the-same measured reference bank worth data using the appropriate adjusted measured critical position, MCPA.
Figures 2.1 and 2.2 present graphs of the measured integral.worth of the reference bank for
.Surry l,Cycle 5 and North Anna 1, Cycle 2, respectively, and illustrate *the M..
- determination of the values of.6.R (M).
The total integral-worth of the test bank with the reference bank at the MCPA, ~R(M)' is determined from these measured data using the reactivity balance given in Equation (2).
The det:er-mination of the measured integral reactivity worth of each test bank from the Surry and North Anna test data is illustrated in Table 2.2.
8
'l'Alll,E 2, 1 MEASURED CRITICAL POSITION DATA ADJUSTMENT
SUMMARY
Measured Critical Reference Bank Test Position-MCP Bank (steps)
Surry 1. Cycle 5 D
186 C
123 A
96 SB 138 SA 171 North Anna l, Cycle 2 C
164 ll*
228 A
189 sn 159 SA 200 HCPA.. HCP_ (Measured Data Adjustment)
(llifferentfal Rod Horth)
Measured Data Differential Adjustments Rod l~or'th (pcm)
(pcm/step)
-8
-5.4
-9
-6.4
-14
-9.0
-14
-6.0
-6
-5.6
+l
. -5.6
+16
-10
-11. 4
-3
-5.3
-6
- 9.0 Adjusted Meas Critical Refe Ban~ Position MCP '(steps) 185 122 94*
l '.l6 170 161 2:!f; 188 159 199
>';The Measured Data Adjustr.1ent for ll bank i:. not applied to the MCP value (228 st<!ps) since the HCI'A v.:ilue can be no greater than 228 steps, This Measured Data Adjustment iH the amount of reactivity by wldch the tot.11 worth of B bank, inserted alone, exceeds the total worth of the reference bank, inserted alone.
ured rence I
- I I
I
i I
I-'
0 I
TABLE 2.2 HEASURED TEST BANK INTEGRAL WORTII SUMMAl<Y Adjustud Heasured Reference Bank Re fe1*,~nce Bank Critical Reference Horth to MCPA -
Total Wo1*th -
Test Bank Position -
M RM A
tiR (M)
Bank MCP (steps)
(pcm)
(pcm)
Surry 1, Cycle 5 D
185 148 1405 C
122 524 1405 A
94 756 ll105 sn 136 428 1405 SA 170 227 1405 North Anna 1, Cycle 2 C
164 385 1069 228 B
0 1069 A
188 226 1069 Sil 159 420 1069 SA 199 139 1069 M
TbR(M)
_, R~I -
l\\RM(}t)
- As indicated in the note on Table 2.1, the total integral worth of n bank, lnsert,~J alone, thnn the total integra 1 worth of the reference bank, !nserteJ "lone, Ly the an,oi.n t of it 1,;
Data Adjustment 116 pcn1).
The total int.::gral worth of Jl bank, 'l'~R (Ml, was cl1;:ten.d11::d 1~ilh bank at it's MCI' (i.e., fully withdra1.1n); 'l'~R(M) a 1069 pcm+ lu'1k... ~ 1085 pcm.
Tc!.;t B;;;~---.T Totill H,irtl1 -
'TH i:R(N)
(pcm) j~ r,rl!att!r ML!..-1_..;urt!,l 1257 881 C.!.')
977 1178 68!,
1085 8!13 6!,9 930 thl! r,.:fL*rcnc.c:
I I
i
0 0
FIGURE 2.1 SURRY UNIT 1 - CYCLE 5 MEASURED.REFERENCE BANK WORTH B BANK WITH ALL OTHER BANKS OUT N.---.--...-~----+-+~-;-',__-;-'-'...,...-.,.....i-,--.-'...;'-+' --+----11-,-...--..-'--'~--'1-,-.....
' -~' ~-------a----.,...
H. i_-;_-;;,_-.;,'""--... -_+,_-::... -_... --i--'":_°".,.1
--l:.1:::-._1-:... -;_'"';1..;-tl------l;_~;1_,:_1'"';:_°",__i--1-',_..,:_~~-l-tl--~---l,..-_+,:_;_'"'_-_:_1::::-+,..:-_.. l--_;1_-1+,::::::-:,::::1::-:.::::::.':.:_--+
1-t.
-I ~.,-i-,1--,-~-'--;-l"--1re-~+-t--T:...,..1 ~-;-"-t'H-~-+1-t--J!_+-,
l'-+--t---1-i--+--r--;--+--+--t-+-li--_+-,1-+-
',-;'~-1--;--,-1_.._.1_,....
I
! I I I I I i
I I I ! :
i I
1 1 i
i 1 : 1.!
1 I
i 1*
H*i_'"':_+,__-..,.-_-_:-_"".._,:""1,..,::,::-:.:::::1:::,:"1.::::~:-:.-=.:~-:-~+l-r-ill,-+l-+l-"---'--l-,-l-'--,1-ii-+l.--.._'--'_.-,.....ll--+...;;....;.-... :-.l-i
,-..~-11-'-1_-J;.._-1:-J.j-t i
I I'!
i I I A
M ll g 11-*~i :_:::.::=~1;::;;_;~1 ;,_:1_:;-,::::;-.::; A (MCP
=
94 steps), AR (M) = 756 pcm
~ i I I
'}
~
N....,..: +,-+,--+-+-',+---
11""",..,............. -'--+---'.,..:..... '-1--,-1 C (MCPA = 122 steps), ti.RJ.' (!I) = 524 pcm
- 1 I I i i I I
-I; :1:,
1 1
11 1
1 SB(MCPA=l36steps),ti.R~Cl)
- !--'-+-....
,' __....,_........ 1_.,-+-....+;...--1-...--11 SA (MCPA = 170 steps), ti.RMCi) 428
= 227
~g,-*~i 1
+:-+
1
--+-1--l_.,......:-+:_.... -,..+;_'--+-+-+-:-t--t--!
1
-t D (MCPA = 185 steps), ti.RMC*O =
pcm pcm
- u:..
- '-I-IT
+-4--
+-i
- T 1
11 -...
L-f-t-++-+-+-,H-t--+-+-+-~-+'--t-' -+--+-+--'H-+-r-+-,-H 1 '-+-++-;-H 1 H-+-++-+1-++--+14--J1~-++-+1-'--l--+'-+-
1 Y 1-'- r'
- 1*'-*',
1
,, 1
. 1, 1,
1
, 1 1
1 1
I!
I Ii 111
'! I I!
'I* I 11 I
i I' I 1 ~-
-j ' I ' i I I i
' ! I I
I I
I
- c 1'"'!-,.-...,_;:;:-'-+'-.-++--t-:-i-+1-i-'** ++---:H-t++*' -!--1 1 -+--'-+,-' -+.--,
1 -+1....;.' +..;...+-Mi-,...-t..... +..;.....H'-+1_;_+-+-
1 H1-i, 1,
~,
1, I
I I
I 1--
-! /*
I 1
I I
I I
I I
\\
I I
I j_
' a::: 0
-!..;1...;.-;---,',-.;'_;.+_;_-f->1
...... lil,-..-t-'--+1....,.
1 _lh'-t-++-'-'+..,'-+-+'..;',-;.-1----+l-i-..;l__.-+-'-++-.f-'--i-+-+-.;',....-'-+...;....f-'-!'..........;...;....;.' -1 0 ~ 1-:--+---1--...-+-'--,.--f-....;l_,.....,,
....... :-'--t--+--11-+:-,., -+---!---i-'--,--i-i-Jl--t-,jl,-+:-,--+-....__*_,_1.....
! --f---,--t-'-;---+-'-'-'-
i I
~
- C ;; H:-i-1 -+---!1--.,.;-+-,, ++-"'-1-:-+ 1' -,-* --,~"l'-,i-' -++-t-rl!H-+--+---+--t--H1-+ 1' -+++-rl 1 -t:-,--+--,1-+1-++..;.....+-f-t 1 -+-H:-+-++-'-+-~-+ I*
. j.,.........,li-,l--;--1,-' -~--.,-, _I,.....,-"-,-l-+-+-+-+-,--+-,-.,-, -t--+--'-1-,---t---;-,--,--t-...... +-;-, -,~;--, ---,,--+-,-+,-' -1:--,......, --1
...J I : I ii I *'II I
I I
, I I I
I I
'l-a:
~-..,!-+-+---+-~'-;-;1,_-,-,--t--+--i-+l-+-1,_,.,"'-r+-i,t-,-+--i--+---+--+-r--+--'-+-,-+-i---i--....__+--il-+l-'-1--i---~--+-'--I--'--'-----+! :-
! 1 i i : I i I * ";
I I i I
I, I I
a:::
- Jill I
1'-
1111 I:
I I
o
~_-+
1
-+,...,.., '1,-+,--1--.-t-~+-,_,,..... -+--+-..-.-,1-,,--,,,-;_,.-;---,-.,.....-1....,.-+-, -+;--+--+,-+-,-it-,-,--, -...,....,....,..-M- ~~
r*
LLJ O 1-1-.-----+-+-r-i,-.----t-----*-1-.--+---+--~-'
....,... -....... -i
__..__.'_._' --+--.-+--+'..... -+-~+-'-,1--+---'--' ------..:....-11------"-'- 1-*
9-e
_..+*'~~~, ~1~,--~t-~~~-'!',~; ~:~,-t"!"'*,.,,P"! A*,-,-, --*--------,1------,---*-----*,_.
Z a, -i, +r_,..1 -+---+--t--..--..-.-'-+'--;-'..,1,_.--,-_,..... 1--;-,,;'-+-'~' 1....
_1-+---,-..:....-1--,.--..:....-,-!---'+-,--t-~+-.-' -1'--+--------'---' ---+'-'---...,..1-...
I I I
j I!
- If.,.
I.
I I I i
I l
9-I I 1
.f I
I
'II,,,
- I i *1' I
I I, r-r t-1H-,.--t--,--t-1 rlH-+~-i1-'-, +-+-+-;'--, ++-+-,
1 ~-r-+'li,.a-i--'-+--+--+-+-++-+--lH--+--,--+-+-h-+-
1 Hf-'--+..... +-~--I
-J'. I. 11 i
- i I
i I,I I
I 1,
I '
.I I
C -'--+--"'-'--'-+-+........:....-'---'---'--1,,-_._..:....----,_-t l
I I ;I
~.
I ti j
- t +-~-+-+----+----+-,..-1,-,-;1-..;....-1~-11.......... --1_,...... --1µ.c"',..-,* -'-, SB--1-* ---, --i-~---... 1------"~...
C,l--'-'+-'--+-+--'---;-+---1--....;.....:....;..;+....:....;;........ -i-~--,-+..... -i-~----'-41,µ,4-3'-,,._~. 1*~-,-+--,-+--.,-----,........ -;---;i--.---'--
hM-:--r-:-'!'"'",-,--t---+--!h-t--r-t-+-l--t~ri-+-~M-,--t1H--t-,-,r---...."""-i.'.'t-,--t--:-+-+-i--+--+--'-t-:.-+-
1 rl-; ~
- 11, +-:-' -H-+-,..+-t--t-H-+-!-'* -;'-t-,-+-t'-t--,--t-.,-*~
"-+-+-rl-c-+'"-'+--' -1*1-* -+--*'-"'-....."c:-t--;!-tl..,.--i,-;-,.-.---,* lc...,.-1---t---'H--'--f i
I l'i
-~
,--.,1*111 I
- I L
I I
' I I I ! I i
II II
' I I I
I
* SA~:--,......,-,----*-~........ I
- j I I l_j I: I j I I 11 I'; I I
.--*'I;~
l--
- 1' 1 r
, II :
I!, :,, 1, 1,
, 1 *.--., 'Q_L_,,,,
l I 1 I I I t i
1 I
i 1 !
- 1., II I i *-- !
~-+,-'-, -+,----..,1-1
. I +-'-+--l........ i -;--:'-1----,::--+'-t-"-' 1._.,.,_.._
11-'-t~I -1':----'.. '+-M..... I +-';-t,..* -f:-' -'t--1'-+1 _.._,,H-t-------1;.. ;.. '.....;..__,',-.:;.-* -!-~,
"""'"--::--' -'-' -H:-+j-f' 40 80 120 BANK POSITION 11
' I I
- 1 I
160 CSTEPSJ 200 229
C,
~
C, C, --
z:
(.JC, O..ii -
I-a::
oc, 3ji a:
a::
0 ta.Jc, a-.
z 0
'ii
-0
- I i
i I
I I
I I
l I
I I
- 1.
I I :
I I
I I I
I i I I I
I I I I
I I
I I
I i l
I I
I ! I I
I i
I I
I I ' I I
I I
I i
I I
I i,*
I '
I I
I I
I I
I I
I I
i I ! i I
I I
FIGURE 2.2 NORTH ANNA UNIT 1 CYCLE 2 MEASURED REFERENCE BANK WORTH D BANK WITH ALL OTHER BANKS OUT
' I I
I r*
i I
I I
l I
I
\\
i I
I ' '
I I
i I I I I I ' !
I i I I I
I I
i !
' i i 1- !
I
.I r I I I
I I I I
I I
I I
J I.I I I
I I
I I
I I
I I
I I
I
- tt.
I I
I i
I (MCPA LlRM(M)
-r-I
! I I
= 159 steps),
= 420 pcm+-H-i i I i I (MCPA
_LlRM(H).
I I
I !
I I I
C
= 164 steps),
= 385 T"""T
.~
I I
I pcm 1;,
I I
j I
(MCPA
'A'
,r-;-
I I
! I A
= 188 steps), LlR1:.(M) = 226 pcm~
i I
I I
'-I I
(MCPA LlRN(H)
~
i I 1
- I I l'llo.l I
= 199 staps),
139
-:-r,-
=
pcm~
I I I
I,'IJ I
j I
I f'1
- 1 I I I I I i r I I I I
I *; '
~
I I
I
,'1,J I
I I !
I I I I
I !
I I
! I I
I I,,
i I.
I I I
I i
i I
' I I
I I I I I
I I I
I I
I I
I I
I I I
i I
I I
I I
I I
I I
"\\,,
1 I
i I
I I
1 I i I I I
1 i
I I
I I
I I ! I I
I I
I i
I I I
- I I
I I
I I I '
I
,\\,.'
I I I I
I I
I i
I i
I I
I I
i I I
I I
.i ! I i
i I i I
I I
I I
I I I I
i I
I I
I I
i I I I
r"il,,
I ; !
I I :
I I I
I I I I i l
i '"
I !
I I
I I ;
! I I
I !
I
\\.1 I
I I
I I
I I
I I I
I I
I I
i*
I I'
I I I
I I, I I
I I
I I
I I
i I
I r I !
i !
I i I I
! 'I,,
I I
I I
I I
I I I
I I
I I
I I
I I
I
'I,,
I I
I I
I I
I
. I i
I i ! !
I I
i i
I i
I I
I I
I I
I !
I I
I,'1 SB; i I
I I I I
I I
I I I
I ;,
I I
I I
I I
I I
~c, I
I I
I I !
i I '.I I
i I
I I
1 I I I
! ' I I
I
! I I
l"'l I
! I I I I
' i
! i
'\\i I
I I
I I
I I
I I
I I
I I
I I
'-1 I
I I
I I
I I I I
1 I ' !
I
'\\.
I I
I
.I : I
! i i
I I
I I
I I
I
! I !
I '
I I
I I
I. Al I !
I I :
I I I
I
! I I
I I ' I I
I I I I
I I
I I
I ' SA.
I I i I I*
I I
I I I I
I i
I I
I I
! I I
I I
I I !
I I
I I I I l '
I '
I I
I I
I I I I I
I I
I I
,'1 I i
I I
I I
I I l
I I
I I
I I I I
I
' i I I I
I I
i I
I
.,. I I ! I I
I I I !
I I
I j "'-I I
,40 80 120 180
- 200 229 BANK POSITION (STEPS) 12
Section 3 CALCULATIONAL METHODOLOGY 3.1 Introduction The design information required to support the rod swap tests consists of individual control rod bank worths, predicted critical reference bank positions, and test bank total integral worths.
The design data required to produce this information are generated using the Vepco PDQ07 Discrete (l) and FLAME (2) models.
The PDQ07 model calculates core reactivity and power distributions in two dimensions (x,y).
For data requiring an axial representation (e.g.,
any core configuration with control rods partially inserted), the FLAME model is employed.
The design predictions, which are required for the rod swap test, are determined from the following sets of calculations:
- 1) the total integral reactivi-ty worth of each control rod bank
- individually inserted in the core,
- 2) the critical boron concentration with the reference bank fully inserted in the core,
- 3) the differential and integral reactivity worth of the reference bank as a function of bank position with all other banks withdrawn from the core, and
- 4) the differential and integral reactivity worth of the reference bank as a function of bank position with each test bank individually inserted in the core.
Items 1 and 2 are calculated with the PDQ07 Discrete model.
Items 3 and 4 are calculated with the FLAME model.
13
The design predictions for the critical reference bank position with each test bank fully inserted in the core and for the total integral worth of each test bank are determined from the above design data and basic reactivity balance equations.
The methodologies used to generate these data are described in detail below.
3.2 PDQ07 Discrete Calculations The total integral reactivity worth of each control rod bank individually inserted in the core is required in order to determine the identity of the reference bank.
In addition, these bank worths are used in the reactivity balance equations described in Sections 3.4 and 3.5.
The total integral worth of a control rod bank individually.inserted in the cor~ is calculated by the following equation:
Bank Worth (pcm)=
X 105 (3)
Where:
k 0
- k.
- l.
= eigenvalue from a PDQ07 Discrete run at hot zero power, all rods out critical boron concentration, with all rods out.
= eigenvalue from a PDQ07 Discrete run at hot zero power, all rods out critical boron concentration, with one control rod bank fully inserted in the core.
The critical boron concentration with the reference bank fully inserted, CB (ref), is obtained by performing a poison search with the PDQ07 Discrete model.
The calculation of the total integral worth of the reference bank with each test bank fully inserted requires two PDQ07 Discrete runs per test bank:
l) a run with the test bank fully inserted and a boron concentration of CB (ref); and 2) a run with the reference bank and the test bank fully inserted and a boron concentration of CB (ref).
The reference bank worths are computed 14
using the same technique as in Equation (3).
The reference bank worths determined in this manner provide normalization for the FLAME model calculations discussed in Section 3.3.
3.3 FLAME Calculations The differential and integral worths.of the reference bank with all other banks out, and with each of the test banks fully inserted are calculated using the FLAME model.
The same methodology is used for both sets of calculations.
First, a series of cases is run with the FLAME3 code in which only the reference bank moves:
- 1) reference bank *out,
- 2) reference bank inserted in the top node of the appropriate assemblies,
- 3) reference bank inserted in the top 2 nodes of the appropriate assemblies, n+l) reference bank inserted in the top 'n' nodes of the appropriate assemblies' last) reference bank fully inserted.
For the reference bank worths with all other banks out, the all rods out critical boron concentra~ion is used.
For the reference bank worths with the test banks inserted, the reference bank in critical boron concentration, CB(ref), is used.
The change in.core reactivity result1ng from each movement of the reference bank is a direct indication of its differential worth.
The second step in the process is the normalization of ~he total integral worth calculated by FLAME3 to the reference bank worth given by the PDQ07 Discrete model (Section 3. 2 above).
Based on this methodology, the following equations are used to *compute the reference bank worths:
15
e Differential Worth at
- k. 1 - k, 1 l.+
105 Node 'i' (pcm/step) i-N,
=
X 2 x SPN X
- k. 1 X ki+l
- J (4) 1.-
Integral Worth at k
- k.
105
=
0
- l.
(5)
Ii I (pcm)
N.
Node
. k X k.
X X
0
- l.
J Where:
k
= eigenvalue given by FLAME3 for the reference bank out 0
- k.
= eigenvalue given by FLAME3 for the reference bank inserted
- l.
in i:he ith node SPN = number of steps of control rod movement per node N. = total integral worth of the reference bank from the PDQ07 Discrete J
model divided by the total integral worth from FLAME3 for similar conditions of boron concentration and rod configuration For these calculations, there are six (6) normalization factors (Nj).
Five of these are for the cases with the reference bank being inserted with a test bank fully inserted.
The other is for the reference bank inserted alone.
Equations (4) and (5) are used to calculate the differential and integral worths of the reference bank as a function of bank position.
3.4 Design Predictions of the Critical Reference Bank Positions The determination of the predicted critical position (PCP) of the reference bank with a test bank fully inserted is based on the following reactivity balance equation:
(6)
Where:
= the total integral worth of the reference bank inserted alone
= the total integral worth of the test bank inserted alone
= the integral worth of the reference bank from the fully withdrawn position to the PCP with the test bank fully inserted 16
T The values of RP and Tp are calculated with the PDQ07 Discrete model as discussed in"Section 3.2 and the value for ~Ri(P) is determined using Equation (6).. The.design prediction of the reference bank worth as a function of bank position with the test bank fully inserted (calculated with the FLAME model as discussed in Section 3.3) is then used to determine the bank position at p
which the reference bank worth equals the value of ~Ri,(P).
This bank position is the predicted critical position of the reference bank with the test bank fully inserted.
Figures 3.1 through 3.10 are graphs of the predicted integral worths of the reference bank with each test bank fully inserte/3,4),
Also shown is an illustration of the determination of each PCP based upon the value of p
. ~(p) for each test bank.
Table 3.1 presents a summary of the predicted critical position of the reference bank associated with each test bank( 3, 4,5)_
3.5 Design Predictions of the Integral Worth of Each. Test Bank
- The determination of the predicted total integral worth of the test bank with the reference bank at the PCP is based on the following reactivity balance equation:
(7)
Where:
= the total integral worth of the reference bank inserted alone
= the integral worth of the reference bank inserted alone from the fully withdrawn position to the PCP
= the total integral worth of the test bank with th,e reference bank at the PCP 17
The value of RP is calculated with the PDQ07 Discrete model as discussed p
in Section 3.2. The values of ~R (P) are determined using the calculations of the integral reference bank worth as a function of bank position with all other banks out (calculated with the FLAME model as discussed in Section 3.3) and the PCP values determined in Section 3.4.
Figures 3.11 and 3.12 are graphs of the predicted integral worth of the reference bank for Surry 1, Cycle 5< 3) and North Anna 1, Cycle 2<4), respectively.
The determination of the values of ~Rp(P) based upon the PCP for each test bank is illustrated on these figures.
The total integral worth of each test. bank with the reference p
bank at the appropriate PCP, TtR(P)' is determined using Equation (7).
Table 3.2 presents an illustration and summary of the determination of these reactivity worth values.
As described in Section 2.2, the measured total integral worth of each test bank, T"iR(M)' is determined with the reference bank inserted to the adjusted measured critical position, MCPA Whenever the MCPA is not identical to the predicted critical position, PCP, the predicted worth of the test bank, with the reference bank at the MCPA, T:R(M)' must be determined in order to put the design values and the test results on the same basis.
The values for
!p are determined from design data using the following reactivity balance AR(M) equation:
Where:
(8)
= the total integxal worth of the test bank with the reference bank at the MCP
= the integral worth of the refArence bank from the fully withdrawn position to the MCP inserted alone
= the total integral worth of the test bank inserted alone
= the integral worth of the refxrence bank from the fully withdrawn position to the MCP with the test bank fully inserted 18
e The values of Tp are calculated with the PDQ07 Discrete model.
The p
values of ARr(M) are determined using the calculations of the integral reference bank worth as a function of position with each test bank fully inserted and A
the MCP values.
Figure 3.13 is a graph of the North Anna 1, Cycle 2 predicted reference bank (D bank) integral worth with test bank C fully inserted.
This figure provides an illustrative example of the determination of the A~(M) values.
p Similarly, the values of AR (M) are determined using the calculations of the integral reference bank worth as a function of position with all other A
banks out and the MCP values.
Figure 3.14 is a graph of the North Anna 1, Cycle 2 predicted integral worth of the reference bank (D bank) with all other banks out.
This figure provides an illustrative example of the determination of the ARP(M) values.
Table 3.3 presents an illustration and sununary of the do:termination of the predicted reactivity worth of the test banks with the A
p reference bank at the MCP, TAR(M)"
The test bank worths determined for Surry 1, Cycle 5 and North Anna 1, Cycle 2are summarized in Table 3.4 and illustrate that the test bank worths are insensitive to small changes in the position of the reference bank.
19
N 0
Test Bank Surry 1. Cycle 5 D
C A
B A
SB SA TABLE 3.1 PREDICTED CRITICAL POSITION SUHMARY Reference Bank Total Test Dank Total Worth (Inserted Alone)-
\\forth (Inserted Alone)-
RP Tp (pcm)
(pcm) 1374 11.88 1374 867 137l1 631 1374 964 1374 1149 1095 687 1095 1089 1095 789 1095 713 1095 941
---1 Reference Bank Worth Predicted Critical to PCP (Test Bank In)-
Reference I.lank t.R~(P)
Position - PCP (steps)
(pcm) 186 181 507 123 743 98 HO 133 225 172 408 167 6
222 -
306 195 382 162 15l1 203
N, I-'
TABLE 3.2 PREDICTED TEST BANK INTEGRAL HORTH WITH THE REFERENCE BAHK AT THE PCP Reference Bank Total Reference Bank Worth Test Bank Total Worth (InseFted Alone)-
to PCP (Inserted Alone)-
Worth,(Ref Bank at PCP)-
Test R
t.l (P)
Tp Bank (pcm) l'IR(P)
(pcm)
(pcm)
Surry 1. Cvcle 5 D
1374 165 1209 C
1374 521 853 A
1374 739 635 SB 1374 453 921 SA 1374 215 1159 North Anna 1. Cvcle 2 C
1095 458 637 B
1095 7
1088 A
1095 210 885 SU 1095 495 600 SA 1095 131 964
N N
TABLE 3.3 PREDICTED TEST BANK INTEGRAL WORTH WITH THE REFERENCE BANK AT THE MCPA Reference Bank Worth Reference Bank Worth Test Bank Worth A
to MCPA (Inserted Alone)-
to HCP (Test Bank.In)-
(Inserted Alone)-
Tp p
llRP (M)
Test llRT(M)
Bank (pcm)
(pcm)
(pcm)
Surry 1. Cycle 5 D
1188 164 147 C
867 520 531 A
631 772 766 SB 964 393 432 SA 1149 235 226 North Anna 1. Cycle 2 C
687 l129 479 B
1089 0
0 A
789 393 277 SB 713 407 520 SA 941 192 167
,/
- @(M) p p
p
= T + llRT(H) -
llR (M)
Test Bank Worth Ref Bank at MCPA-Tp llR(M)
(pcm) 1205 856 637 925 1158 637 1089 905 600 966
N w Test B.ank Surrv 1, Cycle 5 D
C A
SB SA North Anna 1 1 Cycle 2 C
B A
SB SA TABLE 3.4 PREDICTED TEST BANK INTEGRAL WORTH
SUMMARY
Predicted Adjusted Measured Test Bank Worth Test Bank Worth Critical Critical Ref llank at -PCP-Ref Bank at MCPA-Reference Bank Reference Bank p
p A
Tl'IR(P)
T l'IR(M)
Position-PCP Position-HCP (steps)
(steos)
(pcm)
(pcm)
~-
181 185 1209 1205 123 122 853 856 98 94 635 637 133 136 921 925 172 170 1159 1158 167 164 637 637 222 228 1088 1089 195 188 885 905 162 159 600 600 203 199 964 966
C, C,
FIGURE 3.1 SURRY UNIT 1 CYCLE 5 WORTH IN PREDICTED REFERENCE BANK B BANK WITH D BANK
- i. ~~~ll-l-'-4-~ r-r-._~.__._.. -..-I -*~:-'-*--~ ~_i_-r+- ~f-.c*-j-~+--Y--L+ -r--W-+
._-1.... _.I._.!.....;.-;..' -Hl-4-4--1--4-+--l--+--+-~-+--.--1--4---l----1---'-l...J....LJ.-'-*1-+---<~-+---+---'---l-l+--+--+I--'----'-- 1--1------~
I* I I, I I
i~l r, I
I I
I I
I I
}i++-._1; _iH,--+---i--1--1-~+i*
--+-+~;-'-,-t--1,-' ~--1--+-+----.-,-+-r,_.1~ __.. _._ _ _.1--+-i*t--+-----~H--+ -f-----H- *-.
I 1 I i ;
I I
- I I I
- I I
I 1
I C,
c:,
-l I I I '
I I
I I
i I
I
-+-+----+-~- H--!--i-- *--
- r++++H-.;.+ +-i-H-1-d _;_ 1- +-H---t""7 h-f :-+-t---t--+- -i-f-4-~-+
~"--H--W-r+-1---+-
, 1 1
...!---1-+;.+-+-I'- 1 1 : -f--+-*--~- _i__r: ___ -...
1 ----~
_j. ;i!!J,/
I*
1 *,
- i,
~ l j
l
)
I Lr~.-
1 -+-..._.__,__1-.._-"--4-'e-.---'---I--II---,---
+*:-+--f I
- -+-t-f-~+ -+---;-* -'---' --'-._,_: __ l __ ~J_ -r--.-'.-;..
- !
- I I :
I '-H;j-J_=
I
!--W..... fi~(P)
RP Tp I
I i
I i
I
=
>-~-i-*-*
I I
t--* 1--t-
- '-f-*-+-'--t--l-1-+- -!-H-++T+ -!-
= 1374 - 1188 _l_._;__
I I
I J_
I 186 I
I
=
pcm I
i +* I I
i I
I I
I j I j. ! I I
I I
I I
t
~
I I 1 i J
I
~- I j___J_
I
-M-:-
I I
I I
.I j-I I
I I
I i
I I
I 1--
-, I I I I.
~r1., I.
~~g
.c;;-+_! __
, _. ~-4_-_: ~;_+--~----+----;.---"'!""lt-~------+----~--f.-----1
~
- .; 1-..;.4-,._..;.__;_-'-'-----+-ll--i-_._1--'--l-..-,.-./....l--,-.;_.-i-~--'-
..J cc 0:::
C!)
-l I I
~
I I I I I I
I I
I I ' I I
I I
I I I
I I
I I
i I
I I i
i I
i I
I I
~!1-----,---,----r I
I I
I I
I I
1 I
I I
I I
i I
i I
i I
- 1
- t i
i I '
i I
I LIJ C, t-,--'-+---;-+---'-'-!--++-,--+-'--+-'-l--;-+-t--'--'---+--;-,-+.,___-.-_c...._~+-,-------;--.._.....;.-~---'-
I I
- 4 I
I I
- I I
I i
I I I
- 1 '
, I : !
- I I
! '\\. I '
l
- I I
I i
I
- i I
I "'.
I
. I
. I
.... -CD J-l--i---,-'-.;-..-+--++-i,----+.-.-+-+-+--,~-'--+---+'~-~*-+--,.---:-~-----1-,.;.----'--'---:.-1----"--_;_
- z.
H-+---"-.;--;-+-+-'-'-f--+---li---+---li---+-+-ii---1----,i----,"'~-f--+-------i--'-+-'--,---,--+-..;_..h~+----'-
~
i '
I i
' I I
' I i
. r I
~ '
I
....._ I
~-.;
I I
I I
I I "-l I
I I
I ; i I
I i
I......
I.'.
I I. I I
I H~-;-~,~,--+--,,--:--
,,-,.-t--t-----1-+--+---;--,c-,---t---t---ii---+-t---c--t-+--;--,-----..'o;a,---t----~--i---l----
-, -++-....-+,-+:-.+-,--, -i1H1-+---,-+....:.+.;....,+-;_;HH----+--+--~-+-l-+---+--,--+--+--::;!!o,,!h--i--__;_------II--'------,---~
I I
I I
I I
i PCP 181 I
I I
I.
I
=
steps I
I I I I
~ 1 I I I
'-I
-r i I
-I : I
-I
-~-
I I
t I
I I
-I I
40 I ----------
T I
I I
i I
I i
I 90 120 BANK POSITION 24
~........ I i
I l
i 160 CSTEPSl i
........ -~
I 200
~
228
o*
0
~
N 0
C -
N
- Z::: C
(.)C
~:; -
- c I-O::o 09
...J a:
0::
0 l.&Jo 1--
CD z....
C -*
-I
,-.j ' !
l I '
I I I
--r I I
I I
! I
-rr:
I I
LL:
i I i
-I I I
_I I I
-~
I FIGURE 3.2 SURRY UNIT 1 CYCLE 5 WORTH IN PREDICTED REFERENCE BANK B BANK WITH C BANK I I I +.-t-"-~-rl- -L~~___L_
I
'. r-1-~-J......!-t---~-
i -
I I
i I
I
. I I I :
' I i I
I I
I I >f-~!
i I
I I
' I I i I I I
I I
- I I i '
I I I
I I
I I
'--+-1-W-L -f-.:+:
I I
.1+
t-H--
I I
I :
1, I, '
i I
l I
I I
I I I I
I I
L I
i I
I
).
l I
l
- I l
l I
I I I
I I
I I I I '
I I
I I
I I
I '
t.Ri(P)
RP Tp i- -+H-t+f-j I
I I
= -
I I
>-r! I I I I
+
I I I
' I I I i I
I I
I I
I I
! -H+' I I I.!
= 1374 - 867
- ._L r
. r-r7"*H--t-i I
+'+~+*
+ !
I I
!~-!-
I I
I. I I
i I
I I
I I
-t-+~+*-
~-!--Hi.
I.
I
~-~~-*
}- +
I I ++ -H-H--l+ -H-+~-
+4-'
I I
-r-* --
507 pcm*
- -+* -
j I
I i
I
=
-+-
i i i I H-+++
I I
- L
-+-
I I
I I
-++l, i i I
i I
I
++ -H+
l I I -H-1 I
I l
I r-r-
- I 3-++H I
I I
I I
i f-+
I i
I '
I I
I I
I I
I I
I I
I I I I I '
! I I
I i
I I
I I
I I
I I
I I
I L
I I
I I :
'-+++-
i I
I I
I I +-+
I
-l I l !
I I i '
! i i I.
r i
I I
I I
I I l
' I I I
I I
I I
I l
-H-I I
I I
I I
I I
)
I I I
I I
I I
I I
I
- I
,, I i
I I
I ;
I ' I I
I I
I I
I I
I
,, I
' I !
I I
I I I
I I I I
I I !
I i
I I
I I
I I ' !
i I
! i I
i"I I
I I
I I
I r-I i
I
! I I I I ' I I
N i
I I
I !
I I
I I I
I I I
I I
l I
I I
I '-1 '
I i :
I
' I
- I I
I I
I I
I I i I I I I I
I i
I '
I i
I I
I I I I
,* I I
I I
I I
I I !.
I !
I I
I I
I i
I I I
I I '
i I
I
-1 I
- I I :
i I i I
, I :-..;,_
PCP 123 I
i
~.~L.H.1:: i I
I
=
steps I
- ~
I I
I i !
~ ""
I I
i I
I 1* I i
I I
I.! '
i I i -,
I I
I I
I I
I I
i I I
- I i I
~
I,-....
I I
I I
I I
I I
I I
I i
i I
j I !
' j '
I I
I I
I i
I I
I I
I I
I ! I
' I I i I
j I
I i
I
_ I I
I I
I i
I I
I !
I I
I '
I i i I
i I
I I
I I
I
,o 80 120 160 200 229 BANK POSITION-( STEPS )
25
0 c:,
FIGURE s.s*
SURRY UNIT 1 CYCLE 5 PREDICTED REFERENCE BANK WORTH B BANK WITH A BANK IN CN.. W.-'-'+l+*'-+1-1,*--'--+-'-l-*-.l.+-'-t--.j.. :-. +~-+-'-+* +..i...w.+ L+.L-~ -:-7~-t~H- ~~:
- I ii lH+
I*! I'
-+-+-+-t--Hri--+-t-H-+--+-+++-+-,-~*H-+,--+, -H-t-I
' I I I I I I i I I l *'
! : I l
I j" -+***-i--+-+' -*~
- H+~-+- ++ + l-f -++ +H-liHH +! r-~*'-
}_ -
t-t-,..-t-+->-e->-,-
- H--+H +- ++-t-H-+-++*
g ~t--.-*H
, : r -r-: :, : : ~- ++++++-H+
1 I! I 1 *** *.-1-*.,.:_'_ *:,
- I *,
J I
- r-rt-rT-1-*
! I :
~ :.
~ I : l
. I :
I j
I i
I I!, Ii; N
- , +H-+++,H-1
- Ar (P) = RP Tp H-+--+--+-+-+1 1-+-t---+-+--+--+-+-l-+-l-++-..-t-1-+-H 1 -+.-+-I ---r I
i-+-++-...++--+-+-1-+-+-+-t-+..+-+-+-+-....+----+-,-.,.-+-+-+--L I
I !
T
= 1374 -
631 I
i
++:+*i**
l !*
1 i
I
-f- ~t+++t-*1-
~ g ~h+,-H-H-~ +.._,_.......................... -.......,..............
- -H-h-
= 743 pcm 1
I a..-1:il
_... '""'--~""!',,""'!', '"11~-t"!"'"!""'!'"'""".... "!"""'"!""t-""'!'-!-, """""'!'~""!'--+.,..---""!'"!"'""'!'~~---"!'"----1-----~-f I
I I
I '
I I
.1 I
i I i--
I I
I i
I I
I I i I
I I
I
~
~
I I
L I
Ii I
Ii I
i I
I I !
i i
I i i
I i
I I
I i I
I I
i I
-~-
I I
! i
' I I
- I I
I I
I I
I I
i I
I I
I I
I I
i I
' I '
~:-*
.._ C) -. !l-'-+l-+-1.-+-+-1,.., -.,-+--+-+-;..+--;.-+-+--+-Hl-+-+--+!-+--,-+-,,-;.-+--+-+--+-+~+--+~-+-*._;....;.-+--'--+-,......_--'-*-1-+-'---~~
C) ~H
,+-H-i,-~1"""'l-++--H--H-++,........ 1-+....-1-+-Hi-+-H-l-..i.......,-+~-'-+-++*l--'-++-+-+-.Y~-ri+~
~;; rl-1r-' -,--,...-,,-+,'-+' -+-+-+*+-+-"""' -',!'o"'.;.-+-+-h>-t-J+' -;:-,--,-+-,.-. -i:-t,-*t-:1-t-+-f-r:* : ; -t-r r-r--n+t+-t-n-1-s'--,.--,-~
- -, l I
I !
. I I
i I
i l
I l
I i l I
..J i I I! I Xi I
'I i
I
! I I
! I
.I (J:
-I '
I I
I
.~,
i I
! I I I
- "I.*
I I
I I
I I
I I
I I
I I I
! I I I !
~ +-+-f-......
1-.;....,1..... -+-*l-<~+1,-+-+-i,-+-+-+-!;"~-..~~.;........ :-1--+'-+-1+:-+-~1-+-'-J-~i!~~-i--'-"-i..... -f--"------..... *+-~
- 1
- 1 I !
i i
1,
-~., I I
Wol C:, *-+-, -1,>-t,--+--+--+--,"""'1-;.,-t--t--!,>-t-+
!. -+--t-+-;--,-t-,--"l,.-+l-.--+-,,-,,-,-.., -1-,-'-+,-+, -,,-,,----1--,-+-,--;--;--
- I I
I I
I I
I
,_, __ LLU. J....LL L:..:.*,,,,.,
,,,:s....1 PCP = 98 steps +...... -.............--
- ~...-- ~ ~ ~ -~~
~~~
z I I i I I 11 I
I Ii I, 1 'X, 11
... i I i
1 I I I I
I I
I I I I
I ! Ii : "- ! I I
I I I I
I *1 I
I I
I i *'
i I 1 I i
I II I
I I i
i I
I i I I
I I I No.:
I I
J I
I !
I ' I
- I i
I -
! i
- i.
i !
i I
I !........ '
' I I
.-, -1H-+-+-+-+...... +-+-HH-+-+++..--+--f-H-+.....i.:-,.,-;-,H-,--+-t+-+-,-+-.-,""'lr+-t+..;...+.-...-,-+-+-'-'-11-:-~-+-,: _.......
-f i '* I i
- I I I i '
I I I !
I I -1 I
I I I
,, i
.I I
I I
I I
/
I i
I I.'
-t ; I :
I I
I I
' I I l I !
I I I I I I
! I I I I
"', I I I i 11 I
I
'1; 40 80 120 BANK POSITION 26 I
I I
I I
I I
i I !
I I I I I I I I
I I
I I
I I
I I
I 160 CSTEPSl I
I I I
I I I
I I
200 228
0 0 - +*'
N
~ I I
I FIGURE s.,
SURRY UNIT 1 CYCLE PREDICTED REFERENCE BANK B BANK WITH SB BANK 5
WORTH IN
! *+
I
-Li_L I
I i
I I +
I I I I I i I I I
.. ! I I I I I !
I I
I I
I _I_+-..
! I J.j_ _l-!-).. I J :._ _
r I
- !I i !
I i i Ti, I I I I I I I i
- I -
I I I 1 i I
! I I
I i I I I '
I ! I I
I I
I I I I I
I c--i--+--f--LLLr-+ +l--t' __ ;_ L'._
1T1
, I I I I
l'I I!
Ill II I
II!,Ill I
I
,~
g ~t+ f--+-++ H--+:--+-i:-+-...
i, --1:.....,..... 1-1---:-:~++++
I I.J_I-+-,'-!.,1-;.-,--
Tp N --:----t-1rt---t-+
,: --;:-+.
1 --,. -+, -+--,-,',-+-
', -t:-+-+-1-+-+--+-
1
, --;:-+--1 1 -+
1-+--t-1-t l~ (P)
I I i,
I I
I i
l i
I I
I I
-~
_j_~:
1,,1 11 Ill 1~:---
I I
1374 -
964
_ +~-:-;-,-
' I I I I I
ill1 ill Ii I I I 1 1 1 1 1 1
= 410 pcm 1,,, 1
-o
'111 l!I i
I I
I I I I I I
I I
I
(_) _0 1---t-+--+-..-,-...,-+-~1--<:-+1-,-...1,-+-~+-o----+-+--+----~~--,--.
I I
I I
I ' !
I Q.;. 1-*H-+-,--+-+' --t : !
- I i+t-h-t-+-+++-,-+--t-:h:-1-,--+,* +++ I l I i j~-,-+--:1-11~-t-+--+---l i I I I I :
fl ii Ii Ii
- I*
W...J_j__l' I
I 1-H-+-+-+..,...,,..... 1-+,......... 1 -,H-+-+-+-+-+-+ *-++-+-+--t-H-;--+-1--,H,-+-+-+-r-r~ -
1 i r*r-t-+H,-+-+-1-+1-I
' I I I
-1 I I I ! I I I
1 I I I I
I I
I I
I
~
Iii 1, I
I II I
I i
i I I I 1
I I
/ ' I i i I
I ' I --r-n-I I
I I
i I
I I
' -++-
l-+~t-+-+--t-+--r---1-t--+--t-++-,--,-+-+--+-+-+--+-+4-+--t---!-..,....l-t--i-t-+--,....i-+--+-i,-+--H~+-+--,--,-,-,---+-++--'-'
I a::: 0
,* I,,
I I I I !
I I
I I
I I
I i
I I
I I
I I
o ~
a-;.-+--;..+..J....;...+-+--t-t--+-i,-+-+-,'-"----'--+-+-+--+--1-'--+--i-!-
1 :,
I I
I I : I I I i I
I I I
I I
I i I I
' I I
I i
- 3: :,: I-H-t...--+-+-+--1---+--+--t-H-t-+--,.1 -,1H 1---;-,..++-,-t-H--+-t-+++-~t-H--'_..-;++-+-+-+--t-.-,-+-I~~:
I I I I
I i I I i i
I I
I I
I I
I I
I i I I I !
! I I
I I
I I
I I i
I I '
I I
i I
i !
I ! i
! I I
_J
- "I.!
I I
I i
i I
I I
I I
i I I I
- CC i:
j I
j
~
-:i-:....... +r....;.....-..........;....-1--.-+-1-;......~:........ -+,~-~,-~._.....,......... _................. --+-.._,.....;..~..---+---'---,~..;.....;.....c~...--'--'--~I--+-~-~'_...~
i I I
I I
l I
~~
I I I I I I
I i
I I
' i i i I
I I
I I I i I I I I
I I i I
I I I I i
I I
I i ; I lLJ O --1~1..,l,-t--t-~-t--+-,-.--'--+-,-+-+--i-t-l-f".i-t-t--,-<-;--t----l-t---t-+--;--;-,-;--,-+--1r-+--,---;-...;..-,--~--.l-t---+--,--~
t-O_T~,~,~-~~'""."".~1-t"!'"'""":""':""!'"'~""':""!'"'t-~,~-:-"!'"'"."""""':""!'"'~~~---"."""r-1--:-"."""""':""!'"'"."""-TO:-"."""-~-t
- zCD
_I
, 1,1 I' i I
I I
I I
I I
I I I
I i
I I
_i 0
- I
-I I
I I
- i I I
I !
I I I I I
-I I
I I I I
-l I
' I i
I I : !
I I
! Ii I
'-.!Ii I
i I
I I I :
I i
I !
I I
I I ! !
I i
I I
j I
l I
I I
I I
I I I
! ! ! i I',,
I I
I I
I '
I I
I I "',.
i I !
I I
I
' i I
+---+--H.----t-+-+-+-..-Hl;,_.1 _ __,_-t'..,'...-'-..... I,
I I,
1
............ -..-...... '---+-r-+---'_-+--~1-'-
1 ~1~',__--+-+--1'.~~c'----'-'PCP = 133 steps----11-'-I-'-,--~
I I
I
' I I
I i
I I
i I
I I i i I I I i i I
I I
I I i
! I I i I
I ! I I I I
I I ' I I !
I :
I I
I I
I I
I I
I I
I I
i I
I
' I I
I I
I I
I i
40 80 120 BANK POSITION 27 1"""""-I
'I I I,.....
i I
r.:
I ' I I -~
I I '
ii:
I I
I
- 1. '
I I
I I
- a I I I
i I
!.1 I '
I
'I I 1SO (STEPS) i I
I I
I I I I ' I
' I I
I I
i i
200 22!
0 0
a FIGURE s.s SURRY UNIT 1 -
CYCLE 6 PREDICTED REFERENCE BANK WORTH B BANK WITH SA BANK IN
~1'-... -:===~=~==::::::11 =~~:=:=: '=~::::: :=~=:~~:1::=:======:=:=~' ~~~==== !==~~:=:' ::-_-;-; 1-++... ' --+-r-r-,
....-* -t--'*-+:--,-_,_:--+-1;,-*-+H-_*
..,._: -,---1 I--+-+-+-+-!, ---r-i-+-!!--
I l I !
I I j r
i I i I
I I
I i
! I l
r I I
! i
_ j44_.._f......;_..._..........;l-'_,....:..I _,__.1-l--+-'--1--.'-' -+--f.-il_...'-41_._' -+--I--"--_.'_._
l~!i-i-l--"--'--1--.1-+-+-+-...;li-i-+1_._ ___
ll-ili-'-+-i--..-'-l
---t.
I I
I I
I I I
I I I i
I i I I
' I I
I I I I 1
I I I I I
I !
I !
I I I
, I
-~-+-t-t i I '
I I
t
! I I
I I
I I
I I
I I
I ! I l.
i-+-.....,.-' ---+'-,-i -+-I -,'-;---;I-,.' -+--1'-;-....,...~+-t-11-t---' -+--+-+-' --;--,I-,.' -+--t I.-'--'-,,._, _,1-'--'--'---'-.L..Jl'-'.-1-_:_.... 1_,_--'--'--'-I ~-..
'* --'--"--i I'-'--'-!
~c_LJ_ I ' I I I
i 1
' I I 1 I 1',--
1 i !~, ---,-I -+-~+-t-<1---,.,-+--+--+--+-+-.._HH----+--+---,1-+1-t,-r-+-t I! I I
I
... 1-_~J--+--+-+--,11---;-~l~-+--f---llf--i--l-+-ii-+-
'* ~,~-+--f---1'---t--l--.-,r-+,--+-, -;-1--+---t ~~ (P) = RP -
Tp l '
I l I
I I I ' :
I I
I I '
I I I
I I I j*
I i ' I I I I
I I
I I i I I I
I I
= 1374 -
1149 I
i I*
I I
I I
I I
I i i
t !
I I
I I !
I I
I I i I I I,
I !
I
_,,1--,-..
1-,'-+-'~1-+----+-1~'-,-+-111~+--1 1_-t-111-+-+--t-'-+-'r-+1-~1.... 1_,--;1-t
= 225 pcm I
i I
I I i I i I I I I I I
u O ~-.... '--1-......... +-!-io'-*--.;-~~~i----'-~'---'++,--,--.,-,-.,...---,--,,----------+~~---'--1 0.. i 1--i!c-l-+-i-1 -+-1 --,;'-'-+-J-+
1 -'1-+-'--+-'--.1-l-, -+-l--+--+
1---
1 1
1 +...;1--'-+4-+-+-.1-+-+-:'-i-'--+--+-111--':----1-'--;-1 1 ------11-+-+1-1-..-
1 '-l-+-+-
1
- -+-1'--'--
,+-1-'---l--+-,1--1;-...;1'-,.--,,-'--+--I-+-'-' -+-+-*1 -+-----------+-1----1,-+-'-+-----~1-+--, -',--,--+-,-"1-, --1-1--+--,--i-1,-i
. i -+--+-----,---
I.._,!-+: _,._-+-... 1-.--<I-+-+-+---_._
I..
! -1',--1r-+----'I-* ri-1 ---+1--,-1;-cc-+-,--,1-~
1+-,-+-+-+---+-+-,',-,-'--,--
!. _,...! -'-+I-,-, _,:,--11---
1,_1 -,---,--;-1,-t
- c 1 l r
Ii I!
I :'-1 1
i l
I 1
I t
I I
I l
I *' 1 i
I t
i i
I i
t--
I I
I !
I i
i'\\I I
I I
1 I !
'I I
I I
I I
- \\.!
I i
I I I W.
-t l-H-,-,-1-,-1 -+-t---,-+..-
,,-.,1-+,-+
!. -+-+-------t--t-,-,,,,-+-,--,-1* -,-;..
,t-----;---1-,--;---,l,-,-,--.,-i. -,-! -.,..---,--t-..-,-;-+-,-1.-, -,------,-+-,-1--,----,--,-i 0 0,-'-~--' ----+---'-----t------'~.._*--~---------~-----~l""!"-----t
- i: ~ --1,,-..,-+,--
,1. _.._li-;i,--.-+-+--i,-.1-' _,...,, -,;-'------_,1,--1--,-', -i-,-.'-,,.,_.-,-,-+,--*'*-------~--,,-.,-, __...
,. --,---*-~1*rt+i-'
I I I
I I I
I I
I I I I I I
I I i I I
t-,H-t-,--+I -t---llH-+-t--Hli-+1-'"-,-1 -,l,-+-,.-,..-+-IIH-t--t-l,---1-----,-i-'1:!I..-+--, -"",-,-+-,Hi--+--+-+-"-..-!--,Hl-,-+1-~'.
- I, -+
1
- -+--+-i-+-+---,-HH-+-+-+-+-..._.._.-,.,-1-+-,-+-'-+-+-----Hf-'lr-'"-+-,-+---.;-H-1,-_,._-r..,.....-----+---Ht--,-'--+-_,_-+-,-~
a:
! 'I l i I I* I!
I I
! ]
I' I
I I l I
I I
- , I I
0:::
i I
I I i I i
i I
I
,'\\I i
I i
I I
I I
'I I
! i I! I!
,,, I I
Ii I I
'-I
- i-,.-+-,--+---;--,1-,.-+-+--',-1-+-
1 H 1H 1-+---; - 1HH-:--+-,--11t----:--'"-H 1 H-,1-1 __..-,,Hi-+1--+-+--, ---1 -------;-+--,--,-1--1--1-;,1-------t l&J C, t-1>-i-'-1---1-, -+1 "",'-'-+-J-;-...;
11-+1-,.+-;-+----t-'--+-'--'--1H 1-+-+-*-+----.,-...,.-'--'-'--+-++--,--,---.--,.-t--+-'--...------
.... C:, t-H1-+'-' -,--,--;..--,--,--t-H-t----+---+--t--,-+-H1r--+-r-+' -'...--11-+-+1--t--r----+1-:-
1-+4
',1'--+--+-+--,--,--,-.--,--+-t--,---,--,-~
Z.... I I
j I
I
! ' I I I
I I
I I
I I
- "1 !
I i
i :
i
.._._ ____ -i-i-+--,-+--+-t---i----.-'-i--+-'--+--il-1--t-;..-+-,,-+--'r--;--t--+-;..-i-----;--+-'-i--t--l--'-t-t-,---t 1-4 t-H-+-+--
1 t-1 +...;1i----,1-+-t-+1...;1-+-+--
1 +--1 11--.1-----+-1--+--"---i-t-1 _.._Ii._,, ___.,_
1 -t--H1-+1-.-1 -+--,---1'-'li
'\\.JI,--+-i--,--i-+-HH-+-+-t--i--,..-,---+-
-1, -+'..... _,l....,l_,-;....;..+-1--.i-..-
l;-...;l_...!_,._.,._l__,-11--
'...... i---Ji-'1___._..._
11 +'... l,-;1-,l-+i -+' --""--'--l--1' --"i'-l-1-+-'--'--"---.l-i--+I ---'Hh--+--1'-'-I I I I
! I I
I I I' I
I I I I I I
I I
i ! I I
- j-,.-+-+-'--+-+--+-+-t-1-,1-+-, -.1-+-+----+-t--+1-+-'--'--11H-+1--H 1 H-+-+----+--------HHl",l---'\\,.*, -+-1 -,1-+1-+-,-
!,-! -+~-+--+--i-,--t O "_,.-i,_.., '----'-'... '._.~-' _,--1 ___
- .i,__,,~.'.__..!..-l.;
.. :._.~
.. L-1'-
'* -'--* -~-',_--..!.._.:____-..' _,'--_. _:_____,,__,,~.. *.__. ~-.,lL.JI-.~,..* _,---'~---1'",_~-*~ ~~; = 172 steps C c,.;---------.. --------t---'--' *'----+---------.. --.al"\\....a,,..--......., _____ -i CN l--i,H-+:-.-:---,;--,,--,---,.--1-...... ;-1:-+-+-_,...~....... ~,-+-+-l,r--i-+----+--+---li~-~,_-t--+,-,!-+-,.-+-,-+-,-+--+~-+;-*'\\.J~~,,..,..~,H,---1------,-~~
t-.a-'-+-+--'.--
1 H.... -+-t---'--'1_.._,.+++--,-+-H',-.-+-'--+---...... -i---+--l--!-'l-+'-+i -+-I _;_-1'-+! -+--+-il-'!--1 *' -++~'--"il'<-'--+-1-+....... +-'---'-: !-
1 I i I I I
I I
i I '
I I I I I
I I
'-! I I I I I I
I I
i I
I I I I
I I I i
I i I
I I
I I
I I i i I
I l I I i I
I
~
i J l
- j---r-;l,-+!-+-+--
l'-1 -'H~'_..i -+I -1'-+-+--+-...-..++-,-,-'i-,'_.'--+--,-...-..++--!-. _JH-+--+-----+-;-i -,~;--.-;.!-,.-+--'--++-,'-_.,..-...:_,......._* +-.--'--f C 1-...;.'... ' ------+--------1---------+-------~1---'------1-------=--t J I 40 80 120 160 200 228 BANK POSITION (STEPS) 28
FIGURE 3.s CYCLE 2 NORTH ANNA UNIT 1 PREDICTED REFERENCE BANK D BANK WITH C BANK WORTH IN 0
0 -
N I i I i I
'1 I
I : I I I I
I I
i I
.! I i
I I
i I
I I I I
I I
! l I I i
I
- I I
I I
I I
I I
i I I '
I I
I I
i I
I I
I
' I I I I ' I I
I I I I I !
' i I ! I i I I
I I I LU...
! ! I I
I !
I
- I I I. I I
l I
I
- I I I '
i I I '
0 I !
0 I
I I ;
I I I
! I i
I !
I I
I I I I
! I I I
I I
I I
I I I I I I
I I i
I !
I i
I ! I I I I I
I 1 I I I
I I I I I I I I I I ' I
' I I
I i:i i
I I '
I I
t.Ri (P)
RP Tp I
i I
=
I I I
I I
- I I I
i I ;* I j
l I
I i I I I
I I
I I
I I
I I
I i ;
I !
I I
i
= 1095 - 687 I I !
i i
j i
I i
I i
! I ' I i '
I I
I I
I
' I I
I ! I ' !
I 408 I
i I !
I
=
pcm I
I I i : I I : I i I I
I I I
11 "5..0 I
I I I
u O ___......,. __________....., _______.......
I I
- I
- I I
I '
I I
1
! i i
I i I 0.. -
1-;-,-t-*.,.1-t-!;-.,-t,-;--t-++-+--r-t-H-'-;--t--,--;-+--H,-,-,.-+-t--+--i,-,.,--,--t-11,--t---,.--;-t--,,-,;-,,-,--~*-,---,- *~,,...,,-,,---,-~
I I
I I I
I I
I ! I
~
11 1*
11 11 I
I
! i I
i I 1
I I
1 I
I i i '
i I
I I I I
I I r I i
I I
I !
I I
' I I I
- c I
i I
I I
I 1
\\
I I'
.i I
I i
I j
J 1
' I !
I I
i I
l !
I I
I ' I I
I I I !
I I
I I
1,1 I
I 1
! I I i
I I
I I I
.~*
I I
- I i
I I
i 0::: 0 l'J:!:'.r~!'.'.:~~~;;;::~:1:::t+::t!:Jl:=lj:t:t:tt:J=t:!:ttt:d.=t:t+t~~:j1 j:; :'~==~*:::::::t:1[j:~!=*=r,,
c~~
- x~ --~-+-~-"'!"'--~--+----""1ii~..;.-'!'"'i,----~---+--------t-.l,-~--i,----t-----....j I
?
I I
j
- '-. I I
! ! J I
L !
i I
..J
.._._. ___,__, ____.. _____,-;,.....,_.1 __,.,~,.---~---;'-'..... _.... __ ~----------+-.-1....., ___ :-: _i +-+ ~H-; :
cc I: I I* I I
~"lo..'
- i
, I I ! I I
ct::
I t
I r "'-' 1
! 1 1 I
i C!)
l, I,
1 1!
!'1111
!\\!!!I LL.IO t-r----,.--+: _1_,,...,.-;--t--........,.....-,-..
, -,,,-,'--*---lt-!---,1 __ 1 __
1
~,..,.;*-,.;_,.1 _....,1-+-----',...,...__.1_,-,--t-_.._' _..1 ___ --.---0:*~-t-----,-,-~-.,.
1---
- z cD.................., -+--1-+, _...._.._t---;.-.--+-+---,1,-+,.....--f--.l-;.-,-, -:---'-1......,l_..,.,,:"""1------,,-,-----1-+-+-11-+-'------+--'-'-,-:.+.....,.+--'-,-
I '
I I I I
I I I
I I
I i
I I
I I
I I '
I I I t-1
!11111
!I
'I 1!111
!il:1
- "'-'Ii i
I
! -'-j-
' I Q
- I
[lj 1
!l'i I
1
!I i~l j
I I ! 111 I*
i i
I I
~:
I
_J i
1-,......-+-,.-'-1 -'1-;_;.--.--+_;,..-,1i.....,--,' -i-11 -';~-+-+-
,H,i-;~-+i-;.* -+-;!...,.........__,~H;-+-~
- _,.....,._"""'-..;:,,,;,'....,....-t-++-f-*~: ------....-*t--i-!-'---,* i_.i _...
1--'*-'--"-.------'l--'--t--+*.--i---'-+--t--,--...;...+-.;-----a...,.-'---t--+----*.,---,-....;.-'-'--1'"'1.*, ' l I t-:-+ ++++-~
,---t" PCl? = 16 7 steps I
I I I
I
! I !.1
! I I
I '
I I
I I
I I
I ' I I
I i I I I I I I I
l I
I ' I !
I '
I I
I i
I I
i I
I
' I
! I '
I
! II I
j
- ,. ~--,.~....,_! -*--~-,
I
?
I l i I
i I
I I '
I l
I I
I I
i I
I f
I I i I '
i I
I I
i
,_.! __ -..-,,.--~'-' -~I'-+~-
l+-!,,....1-+*-+-1_1 -,..---~*o-L*
i i I '
- I I i I I
+L;-~-l....;-
I
-40 80 120 BANK POSITION 29 160 CSTEPSJ 200 228
--~ji'!-. ------=---------------
C, C,
FIGURES.?
NORTH ANNA UNIT 1 PREDICTED REFERENCE BANK D BANK WITH B BANK CYCLE 2 WORTH IN 1
(
I j
1 j
N
-i~--+;-+-+-+i -,J,.....,-'---+-+++~---
1 t--t-rt- +H+++ h-+ -!--:+ :*; * ~,r ;.., --;- :*,
- h-, r *L.;
I ! l H +-+*;-+
- 1. -+i __,..' -i:H'--4-++-..;...+-..-+-H:-+,-l-+-+-+-..-+-h-+-+-t--r,8-+-i--++-~~-~1+.
I I
! I I ' I '
i i I !
i I 1
I 1 !
! r i I !
. i : -**
r __ ; *.
- 1 I
I I
\\
1 1
l 1 'i !
I i I I
I I
' I I
I I
! I I
I
- ;-"l.
.l*.
l i
-:-;i;-1---
-~~~~
I
! I I
I, I I i
I I
I I i I I i C h ++- -f--rf-H-t--+-H-+-,.+-,--1:-+-
j' I--H-+-+-r+-++-+-t-'H-1,-,-+-+-<:H-~ ~~~~+-rT ~ +t+ ~
C,
~
I I
1 I
I ' I I
I *+~
I I
i i I
I I I I
I I I I
i
! i i I I
I I
I
! L.LJ I ! ; '++-'
' I 1----;-,_,......... 1 +-.i.....+ i *m~, I r
= 1095 - 1089
- -r-r-;**---- -
I i '
= 6 pcm
~- -:--t ~-'--:--
J....! i 1
1 ;
I
- i 1
- I
-C,
! 'I:
i i
I I I' I!
I I '
u C, t-,.-,1-
!. ~....-1-;---;---;---t---;---,-!-r-r-+-.....,.-t-;,-,--+, --t--+,--+--r,---, ~-
a.. ;i r-rlH-+1-+-r-+*+~t---, -\\H1-+1-+-+-i--t--<'-t---,-' -,1-,.-+-+-+-+-+--r-*t- -*--t-1 '-,.--+--,--,-t-~~-;-'--+-+-,-+*e--,--,--~-
-l:-+:-+-:+-,-l-:H-+-t--+--1H1-+1--H1,-+f -~-+-I *+-+-+-+-+-H- -+-+H-i-+-++ 4-H+-4-; __ ~:.. -;....:--: --:-
i ! !
I '
I i
i I
I I
I I
! I I i J 1
i I
I
.I i
+;__~*t-7-rt~r- ~L-1-+-r-+-~*.. :--: -'.,'* -.. \\ *-
- c:
l"""""~""""~-..,i;;J;::+/-' -+'+' -:-i-+-+-'-t+H--t-H+H+H--H-+-TH. -t-.* 1---,-.,........--,-,'-' -**
t-j I
i I
I
- -ri-+-* -:--**
! i !
I : '
! I I !
ct:: c, '
1!-+
1+....-+-i-+...... +-i-;-~..i:-+-~-+++-
1 ~+....... +--+-.-*l-i-1 --l-~-+--,-lh--;----~,...;.--'-
D O.....,..,..,,,_,........,.""T"_1_,,1~..,....... -' _1,_,*....,.*-* --......;_.... *.....,,._---,.;-1--1--1-----------+--1-1,.........,...,.--,-~-..,......--_,,....._,._-,---*1--,----,-
3 ;.; t--i--i1-+-+-...-+1 -.1H 1--1-+-,...-,-+-..-+--'"'"-1-..,-++-.._i--i-+-,.---t-+~..;......_ ___,__,_t-,-...,..--...... -----t-'---+-~
I I
! I I i
l I
I i'
I 1_-+-l:......+l....;.....;....;...;.--1-..;.....;........... -,...;.....,_:......+-1'_+-,_.-+-............;.'-1-..;....-i,--_...._,.._.....;-1-,--+-.:....-.....;..-"-,!-._-__.. __
111 I
"-i Ii I
i i
I I
I I i
I i
I I '
I I I
- I !
I I
I i
I I I I
I
' I
~' +f+t----'------..,--~+- +-+-~---
I I i I i i !
I
! ' I :
I
' ~
- ~~-+--
l I
~---------i I
I
_J I I I
cc
- 1 I, ' I I '
I a::
i 0
-i :
I l&Jo I ! I I I 1--
zCD I
I I I I I I l I
I I
i i
I I
I '
I c::,
I I
~
I
! I
- I I !
i I
I I
I I.
I i
I I
I I
-0 FIGURE 3.11 SURRY UNIT 1 -
CYCLE 5 PREDICTED REFERENCE BANK WORTH B BANK WITH ALL OTHER BANKS OUT I
I I
I I
I I
I I I I ',.
I I I I
I I I
I i
I i I
I i I
I I
- i
' ! I I I i I !
i.I I
i I I I ! I I I I I !
I '
I I
I I !
I I I I I I : I i
I I
I ! ! I I
1*1 I I I
I I
I I
I I '
I I I I 6.Rp (P)
I I A (PCP =.98 steps),
= 739 pcm I
I 6.1/ (P)
I I i i I C (PCP 123 steps),
= 521 pcm I I,
=
i I 6.Rp (P)
= 453 pcm I
I I (PCP steps), 6.Rp (P) 215 SA
= 172
=
pcm I
I
!:.RP (P)
I D (PCP = 181 steps),
= 165 pcm I
I i i
I
, I I I
I ' I I
I I
I '
i 1* -
I
~
H-i H-"!""
~
f-l-..1.
H+
rr1*
H-t-ii' L-...-1 I
I I
I I
I i
I I ; I I I I I I ;
I.i I I '
I I
I I
I I
I
\\
I : i I I
I I
i
. I I
I I I
I I I I
I I
I I
- I f'
I I
! I
' i I
I I I
! I !
' ! I I I I I I I
! I ! : i 1*-
I I
i I
I I
l I I I ! i i I I i
i-......1 I
I I
I I I
I '
I I i I I
I I
1*
I I
I I '
I I
I. I i*
I I I I I
I I I
I I
I I
I I
I '
! "-i
' ; I I
I '. I
' I I '
I I
' ' I I
I
- I I
I I
I -'.1 I ! I I ' I
' I '
I I
I I I ; I I : I !
I I
I I I 1 I '-; I I
I I I I
I I
- 1 I
! I I i I I I I I
I :
I I
I I I I
I
. I 1 ' I I I ! I
,. i I. ! l I !,,,
I I '
I
! I !
I I
i i i..
I I I *"I.
I I
I I : !
I I I ! ' i ! i I '
i !
I
' I
' I I
I*
\\ 1 I I
I I I
i l
' I I I I
I i
' I I I '
I ;
I I '
I I
I 1\\.1.
I I
I I
I I
I I I I I
I '
i I I I '
I '
~ i I
I !
I I I I I I
I I
I I
I '-, I I
I I
, I I
I.-,.. A I
' I
' I I
I I I
I I
I' I
' I I
I ! i I,.
I '
I I i I I
I : 11',j I
! i.
I I ' I I
I i i I
I ! I I
I I
I ii I
I I l I I I I I ! !
I I i I
I I I i
I i I
! I I
' I
' I I !
- I l
I I
I I.I I I *II I
I i i I I I I I I
I ii i !
!,.,._c I
I i : I I
I : I :
I 't I
- i. °". ~SB 1 I
! I i I
! I i I i I I
I 'I, I
I I : I I
- 11 j
I I
I.--..!
I !
'-1 I
I I
I I
I It I i i I.I ii I I,--....,*
I I
I i I
! I I
! I*
I I
' I I
I Ii~
I I
t '
I I '
! I I
I I 1, I ! i I
I 'I I I
I
......., SA
' I I
. I I i i
I '
I I
- I i
I I I I I
I I
I I i I I I I I
I I I I
I II I I
I I '
D1 I
' I i
i I
I I
I i i I I,,
! I i
I
- t
- 1............ I I
t I
I '
I ! I I I
I II i I I
! 'I '
I I I I... : I --.
i t
I i
- I' I I
- 1 I I :
i--
I I
I I
-40 80 120 180 200 228 BANK POSITION (STEPS) 34
FIGURE 3.12 NORTH ANNA UNIT 1 PREDICTED REFERENCE BANK CYCLE 2 WORTH BANKS OUT D _BANK WITH ALL OTHER
....;.'....,...j.........:.1 -L-'
11'-'....;.__....,_..__.i'--'....:.! _.._l*I...J'-'--'--::'-*, -, i -, i I j
I i
I I '--
t-+:~:-+--+11~:-'~~1*...... -+----,,~~+-+-+-++~:-:,-...:sB (PCP= 162 steps), ~Rp(P) = 495
= 458 pea.
1 i
' 1 1
- : c (PCP = 167 steps), ~RP (P)
I I I I I
I !
I '
I p
c:, H:*-+-+
', -+:~, +:-+:-.+-, +-+i-+-+:-1...+:..;-:::!I!,,:......._.,.-11--i-..µ'f-+
- -i-;..: A (PCP = 19 5 steps ), ~R ( :P)
' C)
I I
I I
I I
I I
I I
I I
.. *P el'~"'!""!-,~,~~~"!"-.',~,~1~~,,~1~,ie-"-!'1~,--,SA (PCP= 203 steps), ~R (P)
.,.t-+~..--f::~:,....:~:-:r-+-+-1-!-e..--~:-~:--,-~1 ~:-:t--tto'".-~i-,-1...,..
1 B (PCP= 222 steps), ~Rp(P) r I ' l I i !
I I
i,iii 1 r,,,
= 210 pcm_
= 131 pcm~
=
7 pcm~
r 1
- . 1 I
I
.i I l i I I l
"'I. I I I I i i 1
1*
I I
I I l I I
- -,,i i I *I I I I
I I i I
I 1 I i
f 1 i'-i i
I I
I !,
I I
I I
111 I
i I
I,~ I I
11 j I
I I
I i
11 Jill i'I
- II l!l "'-i 11 II ii 111 I
(.) C:,C~"'!"i"'~-""'!'-'r--""'!'-+--'!""~""'!'-,."'!"'*'""'!'+...,'!""~1~*.... '._,,.'!"' +...,"""'!1~-......... -~1--------------+-----.,--1 Q...a, H:-+'-+-
1.,_
1,-1' -,;,-t:--,.-++-+--.1---1 -+...--+-+-+
11 -H 1 H-t1-+1 -+-; -,;H;-+-+
1' -'~H1--'-:--i--'--+"11--'-1-+--++-+---+, -+
1 1 -+_._..._-,-.,....._..
I...._+--+1-'-
I 1
I I
I I
N*
l I
I I l
! i I
I,, i I I' I
! I i
'i ! 11 I~ I 11 I!
I*, I I
.i Ii! 11 i* I
!11
~
i I 1
I II I.
i I
II I
1 J I!
11 J
I I
'-i
! I
- I a::
I I
I I I I
I I
I
.J I
, i 0 C) I-Hl-+-,-:-;-1;..I _,i-;'-t-' -+-'H;-,.,----+-1'-i--'-:.... : +-,--,-+--Hri-ti--r+-,--+----..
1"'.-,,:,--;-,--++-;--;I.... --,-' ___ I _l,__,',--;-t--...-----.-
I
~CD t-,-;-+---+-..----t-+-+-+-+-+-i-.'-,--+----.;-,....,.'-+-+-+-+'...,..' -+-._-H....,.'-+-+--+-+;...,..* -."-' -,--1-..,.....-..-*-*+'...;.........,_-1-.__._,._+--
i
! 1 J
I!
1 I I!
I
! I 1 I'-
t I
i l l !
I I I ' I i I I
I I I I '
I
\\i.
I i I I
_J 1-,',-;.l -f-1' -i--+-1 -,-'-+-
'Hl-t--+-+-iH'-+--+1-+..,!-+-+-+l-+i -+-+-Hli_h I'-+-+-+'--,-+-~!'_,._
l...._.:'\\.-'11-SB +-*,' ~-;---H-~-t-..-..... !--;:...... -t CJ::
I I ! I I I
I
! I I I I I !
I !
I I,
- i I I :
I I
I J
! I 1 ! I I *I ail t
I I
r 0:::
l--'IHl....;.-;...,..~l-+!-+-!,+-1--,..... -.._11._.1...,. ___ -+1-+-~'...... '-+....;.-,..~1......,.._..-+--o-~.+-,+-1,.....:....,....;....;..-t,":-'lr-'-; (:;~----......... "-'t-,;l....;.!....;._-'--
0 I I l l
i i;
I.I.
1.aJ O,-,,--;I--;,...., -......
i,-.l---,-+-,--;-;--l'-t-t""""-+--11H--,.........__,:--;,---
'+,...._
1 -+-..--;--,--,-'-.-,.--;--t,.,!-..,*-'\\i~:,-. -'--.--,---1----,.-----
~
1-'-'--+-'-+---1'-;-,.-1--,...-+--'- ',....;'--
1-f--+--+-+-......,'....;....;...;...~------,--------..... -*-'-~-* --'---l---+-'-..... --1 z.......
i I I I I I i I I
I I'
I I I '
I
' I '
II I I I I
i ! I.I I
I I I I I i i
I
- 1 I
l 11 I;*, I I I I I Ill I
- '\\i !
I I
i I '
I
! *1 I
I I
j I
I "I
I 1 1,
i 1 !
1 1
, I I
1,
- 1 '
I I
I I
- '\\I I
I j
1 1
I I
j i
I 1
I l
l I
1 l
11 I
~
N I i I I I
I I
I I
! I '
I I ! :
I i I
I I
I I
I I I
i*
I I
I I I I
.-.......,--;..... ;-;-!H--..... -+~IHi-+-+-H,,H-+,-+, +-+-~,....... -.....
- -HIH-+-+-, -,H-+--'-....;.-t,.......-
- ..,........ -....,,'-_-1...... ~
'II SA ~
I I I I
! I I I I I I i I I I
I I I
...., I I
I I
I !.1 I
I I
I i I i I i i '
I I I I i i
I I
I 40 iii I
I II I
I II
'1-1'-'
I I I !
I! I
! I I I
'-l 1 I I I i I I I I
11 I I, "\\.,
I I I I I
! I I I I I I '
I I
I'- I B.
80 120 BANK POSITION 35 160 CSTEPSl 200 228
0 0
FIGURE 3.13 NORTH RNNR UNIT 1 -
CYCLE 2 DETERMINATION OF 6R~(MJ FOR TEST BANK C i I I i / ~ l t / H I I I f.
i- /
i I I i I / 1 i ! ! ! i ! i I i ! i i i ! I !
i 1 i i
-iii i i I! i*
i Ii r.+H*I I I I I Hf i-i Ii Iii! I i I If ii
! 11 i
!I 1 f -ff I H 1-1 ++l*
I H **
1r t f*f i Ii I!! ! I/ I! 11 : iii H I I* -~+l* ++H f!-H t+*l -I 1-H I / 1 I *I I !*Ii f Ii Ii I I Ii Ii I I 0° i,1., :. *f*,_1.Lf. *I 1--\\--1 ;.L 1--
- 1--1
- 1 I* -l-l-1r-(.1.. 1
'1 / I 11 l,
!, l.'*1 :I!.!
!I i Ii! i
! f I l
I 1
I I
i,
I l
I
- .i w Ii !*I It I*! Hi It Hi i r-I f 11 ! +i 11 i ! ti! i ! i ! i; 11 i Iii i*I 1
1 ! I.. ',--1 -'1 I
- i. t. 'r
- 1. I I l - 'i
- i. l I.
.(. 1 1 1
. 1
- 1
- 1*
i i L I
- 1 1
1
- I i 1 1 1 1 l f I : ;. 1 I
. ! I I
f
- f r I
! ! I I
I -r-*
I I
i f
I r : 1
, i I
l i Ii 111-l-f i *!-1+1 H H-Ii I*
ii I 11 ! iii Ii I *Iii ii I! i i l ii!:
i I f ! f I !-t* I
~ H H+ I- -*
H I ! I I I H i I l !** I I 1 ! i I ! I i ! ! I l ! ; !
5 g I 1-f i I
~ f-i H I *H-1 +,
-l / i / I i / i i i ! I i ! I i i I !- i i / 1 ! !
i i i i ! i CL::; I l i H I I l I -H H I* ** ** ** H -I f I I f ! i *I i I i f
- i ! I i i i i* ! i l I 1 ! i H !
1-r f I ! :H-H- * + H*+ f* +* I
- I H* i H--lf f i I ! ! *! i* t I i ! i I i f f I i ! I i i i i
- r:
-H1i!- iH,*iHil*ll-1* +f IH*!-i-ffiil1! ! !1,:+i 1 i! i!i:-::
1-I l t 1 ! i ! i f*
- H ! -i-H H* l
! I ! I i I l i I I I I ! i I ! ! I i ! I ! i i i I 1 i I : !
Ct:: 0 i
I I
' I I -r-.,..L ! I '
I I ' I I I I I 1*
'1 I I I I ' i I
I '
I
\\
- ii ! i i : : ! i I 0~ ! t*! I.ti i,1 t 1i ~Ii 1*-:*t*1 1*: f ! '! ; 1**; It l 1 f*! 1.
~'.ii!! I!:
. I 3::::: li!if!!-!i !-ll*fN.tl ll!iliif! iliJ!!ili iii!i:!if !iif/
1
_J 1111-f-l-i+l-*H-HH Th*! *li!//1 iii11!I *i lli!ili! :!il!
1 -
a:
i ! I Ii\\ 1 1.!
.i 1*
t' l I j l 1"1....l I I I
'11* I l ! 1' i. L. *, L,i
- I! I; I! I!
i, l_.
, 1,,,
- 1 r-- 1
- 1 r*
,- *
- 1*,...... r 1 1,
~ 1!:-11H*f!* H-lf*!I i -/1-NJ Ill i1ft/!iil !!11/iifl 1/i:!;
We ffl!!l!il l++!*l-f++*!-H!!l1,ii i!J:!!i-1! l!.!i1f:i li1li; i ai ! i i i *! !- I I I f H+ H* **H H I I 1-1* i -f'i..- : i i** 1 i i I l i ! i i ! i I I ! i ! i i ! i !
I*/
l_ *1 11 L,-r'*-,'-*r! -~-.ll.L-t-l-l 1-
- q. 1 1 ~I! l I
~ 1 f I i I 1* 1 ! i u 1,..!..~-~LLL:...L i r
1111.111 11 1
i!1 lT'l1*
1 A
~
f-' jlf--f-fl.. L!-JJ.j.[.lii 1*-~i 1 L f-i-i !li~!i*'ii,MCP
=164steps,*
l I
f j
- T 1 !
1 1
, If Ii
, r. l"N, 1
1
! I',! 1', f I I I' i 1 ! i
- ',I* I,; j Ii*
- ; :,i 1 1
P
-r f**r **t***,
-, *i-1*****-t-1 1 'I*
I 1 **
I' I*'. :N 1t.R.:..(M) = 429 pcm' j
t I
j
! : ; i
!,I I
i
- -J,.,
o* ~ ~ ~ ~ µ ~ ~-~....l- ;...!.... ~ W ~ ~ -~ ~ ~ ~ !-- ~i I ; ; ! : t i
~ ! 1 :
~ li!iil!it HIH*HH l*l*li-iH!i it!iii!ii '!N.iil:: iii!:i.
11 ! i -H-1 + f t-H i H* H i--H, *HI Hr
- H ! !
i-i N,J i : I ! I : ; i
- I* I* f !-f-1 f-i f.. f H-f i - **l l-H** i H I I ! I I I I I ! i
! i i i i IN ! : i i i ! -
t f H-! -H-+ 1 t-H H+H+ -I*+ f* f* ! i f f l l i ! i i i + !
i ! i l I ! ! '(! i i ! l-
. ! -f
-! f
- i * ! U l ! f I-I
! f l I I I I ! I I f i I i i : ! ; I ! ! i ! i i 1 !X ! !
0 40 80 120 160 200 228 BANK POSITION (STEPSJ 36
0 FIGURE 3.14 NORTH ANNA UNIT 1 - cicLE 2 DETERMINATION OF ~R CMJ FOR TEST BANK C
- ~
1 1
- 1
- 1 i
I i *,
- 1 1*
- t- -*h-h1-~- - -t-t- - --H-* rrr t--H-rt 1- -,1-*1* \\ *r*+-1-t-! +Hi+ H I i * ! 1 1 \\ \\- 1
-H+-r-t-~H+ --!-~.-- *-++ f-L- +*... *HI +H *i H l*f i 11 i I If I 1
-+-~- Tl---+f-* >---t+ - -- - *i + - ++ -1
~ >--t--H -+H +H 1-1 1 r f 1 1 1
- -I+~ --fr~.:: ~-f-H-c-t
-r i- *r-L- --+ ---H+ ++H-Ii f i i i -fl i g -H+: :.+H+-+--~i': :,--+-H+l* -r--f----f-H--f--!--+-H+f-- H++H
- -H+ + +f--1-d+ +-- -~--\\i:"f.-1-- ----1-h*H -----H-H H-1 H ! 1-1 i H 1 1-1 r H 1-
-H-+-H----t- - ---H-- + * ~---i-+ -r-'N +I-+- ! -~ H-f i I -+ I H ! H I i +*l H 1-1 f-* *-r+*r-+-H-- +---l--*--,,-+-t-+Lf-\\l+H-* /.. - *I +11-i H Hf*! f J-i-Hi I I!
~ +---++t--- : +---t---~++--+-d~d--f-~H--- H-t+H-f-+H+i 1-1 -Iii H 1 uo +-,--+++--1\\--.+t-++---~+ +-H---+-N++,H-H-l ** -H-H+I i-H*+I f-i a_o5 -++*--c- --- +H-H++-++-l+i-- +H-t++t-t-1' --- +H*H--H- *i**H+-1-H-H +H-H I
--H-
- H-+- --+tl+-----H--f-- :--~f--H-1-H-H- ++-H 11
~ i 1- +! f-t+ I -
- t:
+-r-H-f--,_ +----~-+*--+H-1-+H-- f--N.1-H H+ I t* i i*l 11 i-i-l-f I!
I-
_j__Ll __ LLLt- _.__ e--L _
-i-I.... -l-l+-!-Lr1-- 'r -i.... LL '-.1. t1' + [- _j_ll. f.1. l rl I ! *1; - 11 i !. ; ~ :
a:=
I i I I ! I I !
I I I I i I I !
i I
i I i'\\J.
I !
! l I
l I
,.... O _q I LLLL_I __ I ----- *--*Li. ~ I I l_t !_p_j __ U.!t** -i--1U.~ 't'.\\i [ L~. -'1--f--!-l H-r'* i + :1*,!*.!..1 -+.-'",
i.*
~
1.--n-r1r-*r1 r
. 1 r*r-*, 1;1*
, 1,
! r.. r. ~-;\\,*1,
- 3: -
- I
- I I
I.LLJ. '
' +
I I I
I ' '
I.i..
I -1* '.'\\.l I I I I I
~ I...
I CQTT 11 rrn-r--t--
I I'
--r-1*iT,-tl'ilTT1Tl-1,*1-1*: :ill!-!
-1 H---+ rl-+t
- . -++--i+H --+-t--H--1+-H-- -1 H\\. -* * * * * * *, *A, *, I a:
-H_i_LH-__J____
1 1+4-- _1rtt1-l-*-i--f-- -!. __ rr-1+/-/+~-H,c Bank HCP
= 164 steps, 1. *1--f
-]
I I
I I
I i'\\l p
a:::
~*1 +--LL'-L-- -Ll.--L~-/.--1--Li-L+-L...LLLL.LLLil.-.. t.1-f--'- jl+Li-.ii -!-. I'\\.. liR (M) = 479 pcm
(!)
i 1 1 1 i 1 1 1 1 r 1, 1 1 -r* 1**1-i 1 1 1
1 1 r, i 1
I Wo --l-1 1 f-+H+H--j--j--4+~-++-f++++++ -H-i-1-++H-l-1+ \\H-f i Ii l* f ii t-i 1-
- i-+-,
LLL I r r 1 1
- 1 1 H-H** ---l--l-L-f-tf+W-. 4-i-'-*-l-Li-l.:.: +4 i--l i 1 Z
-i I I I I
ITTI I I
1 I I l I
I I
/
I l r
J
~ I I
l 1
1 l
1 I
~
--H*, +tt.
1 i 1 1 1 1 l-+-i....l...Lrr' 1 -Li-f-~ --l-.LJ-1--L 1_1_,.. _, +-~-~
1 1
- 1. 1* ~-+
- 1. -1 1
,1_ !,---,.* 11
, 1 1 l
t 1*,-r 1
1
- 1 I
- -,r J
, ! \\f
+t-;--1 1 +-+-
1
, +--+--+--+--++--+-i+++---!-+++~ H-t-- -;--f-l*H+H* --
1-H-/-N*-H ! !-l f f !
+++, :
i -f--- - : : : ' : I :,
I : : :+ H---H-H+-i++ -.~+i--H-- 1\\i-* (-' -H-+!**! i 0 -f-4
... --;--,1+-, +-r +-, +-1 b-r-+-+-'+-' l-t--i1H1 : i ; --l-L\\*--J.LLL1--L--W-r-l-1r~-~--1'--L. -l--H-. IJ LLi'-i. 1,-
~. -i, i,- '.,*-
'1 I
- l-r-
- TT )!
I lift! f*it,:,
l
!*.i!;i, 1 \\!
i
~.L-
, :II Ir ~i-~:-L-1-tt-' --i-LH--~.Li-j-.1 '-i-l--L!...(.j-,\\--~L-i-i-if I
1 1 I 1
- 1 I t
1 1 1 1,
i I '
I
! *:i* !
1 ! 1 l, *
! i i
1 !
1--t--:+-+--+--t--b-+:-l--.
I
+-- ---H+
I : :
-H-H--.. --+ H-*++t-++f H* +- N*+*H-i I*
, 1 1,
, 1
-!--1-4 i ~ --1---i, i...L, +--I r I 1,
i\\ l I j :,
--..,.....-+-f--!1---1--*,
1 1 1 1 1 r 1. 1, : 1 ; ----t-+-,-,
, r-r-TTr-, r-**,*t--t**1* -r't**:--,-r i I
I I i
I I I I
! I I H-- ---l I I I I I _I. LLI--. U-.LL,_1_
j.. (\\.1.. ~--t'. '.
I I I I I I
I ! I I I I '
I
! I ! ! IT
--1--- *
. : i H---
1-H++ --t-f-H--l-i--J-H---H-+H---H+ +~-+--H+-H---+ H--'N... i 0
40 80 120 BANK POSITION 37 160 CSTEPSJ 200 228
e Section 4 TEST RESULTS EVALUATION METHODOLOGY AND REVIEW CRITERIA
- 4. 1 Background As described earlier in this report,.the acceptability of the results of. the control rod bank worth tests serves to demonstrate the validity of the results of.the calculational models used to predict control rod bank worths as part of the design process. Traditionally, the evaluation of the acceptability of the results of control r.od bank worth tests has been based on a comparison
- of* the measured and predicted control* rod bank worths.
This comparison has.
typically been expressed in terms of the perc~nt difference. between the measured and predicted.result as shown in Equation (9).
= Pmeas - P design Pdesign X 100 (9)
In.the past, the measured control rod bank worths were obtained by using the dilution/boration technique.
The review criteria (design tolerance) used for this comparison has* been _:15% for the measurement of the reactivity.
worth of individual control rod banks as shown by Equation (10).
It.<%) I <* is%
(10)
For individual control rod banks with relatively low reactivity worths, Le.,..
~600 pcm, the difference bet~een the measured and predicted reactivity worth has been expressed in terms of absolute reactivity as shown by Equation (11).
A(pcm) = P meas :_ P design (11) 38
The review criteria used for this comparison has been +100 pcm as shown by Equation (12).
! A(pcm) 1. <
100 pcm (12)
Finally, in order to address additional concerns regarding shutdown margin verification, a review criteria has been established that the percent difference between the measured and predicted total reactivity worth of all four control banks be within +10% as shown by Equation (13).
It.<%) I A thru D
=
A-D Pmeas A....;D p design x A-D pdesign 100 4.2 Rod Swap Test Evaluation and Review Criteria
<. 10%
(13).
The measurement of the reactivi'ty worth of the reference bank is
- performed using the dilution/boration technique.* Therefore, the standard test result evaluation methodology and review criteria for individual bank worths using the dilution/boration technique, as described above, are used to evaluate the results of.that test.* As described in Section 3 of this report~ the design predictions of the individual test bank reactivity worths are on exactly the same basis as the*measured test results.
Therefore, it is appropriate to use the.same test result*evaluation methodology for the rod swap test results as for test results obtained using the dilution/boration technique.* The measured test bank worths,.. ~R(M), are compared to the design predictions, TfR(M), and
.the difference between the two is expressed either in terms of percent difference or in terms of absolute reactivity ~s appropriate. Additionally, since the individual test bank worth determinations are essentially the same in nature as the 1ndividual control rod bank reactivity worth tests using the dilution/boration technique, it is appropriate to use the same review criteria for the individual 39
e test bank worths determined through rod swap; i.e.
I M%) I I Ci (pcm)\\
.::_ 15% for bank worths > 600 pcm
< 100 pcm for bank worths 600 pcm (14a)
(14b)
Finally, a review criteria has been established that the percent difference between the measured and predicted total reactivity worth of all of the control rod banks (i.e., the sunnnation of the individual bank worths, control and shutdown) be within !10%; i.e.,
l tiCJ.) I
=
Total T
P design T
- ()design X 100 10%
(15)
In summary,a test result evaluation methodology and review criteria have been established to evaluate the control rod bank worth test results obtained by using the rod swap technique.
The evaluation methodology and review criteria are appropriate with respect to the test procedure, the test data analysis methods, and the design methods; and are identical to those used to evaluate the results of control rod bank worth tests using the dilution/boration technique.
As in the case of the current. testing programs, should the results of the rod. swap tests fail to meet the established review criter:ta, the Station Nuclear Safety and Operating Committee will be informed as required by the Vepco Nuclear Power Station Quality Assurance Manual.
Based on the results of this review, the Committee may decide to perform additional testing.
This additional testing may be a repeat of the original test or the performance of other appropriate confirmatory tests.
40
- Section 5 ROD SWAP TEST RESULTS The Surry 1, Cycle 5 and North Anna 1, Cycle 2 rod swap test data were analyzed using the methodology presented 1.n Section 2.2.
The design predictions associated with these tests were performed using the methodology presented in Secti'on 3.* Figures 5.1 and 5.2 provide a comparison of the measured and predicted integral wort.h of the reference bank for Surry 1, Cycle 5 and North Anna 1,. Cycle 2, respectively.
The results of the test bank worth measurements, together with the associated design predictions and test review criteria are summarized on Table 5.1. *As can be seen from the information presented on this table, all of the test results met *the test review criteria and were acceptable.
41
TABLE 5.1 ROD SHAP TEST.RESULTS SURRY 1, CYCLE 5 Bank Worth Review Control
( cm)
Criteria Rod Bank Measured Predicted l\\(Ecm) l\\(%)
(%)
B-reference bank 1405 1374 31
+2.3
+15 e
D 1257 1205 52
+4.3
+15 C
881 856 25
+2.9
+15 A
649 637 12
+1.9
+15 SB 977 925 52
+5.6
+15 SA 1178 1158 20
+l. 7
+15
_.r,,.
Total 63l17 6155 192
+3.12
+10 NORTH ANNA 1, CYCLE 2 Bank Worth Review Control
( cm)
Criteria
- Ro<l Bank Measured Predicted
- t. (Ecm) ll (%)
(%)
e D-reference bank 1069 1095
-26
-2.4
+15 C
684 637 47
+7.4
+15 B
1085 1089
-4
-O.L1
+15 A
843 905
-62
-6.9
+15 SB 6L19 600 49
+8.2
+15 SA 930 966
-36
-3.7
+15 Total 5260 5292
-32
-0.6
+10
'----------------~=------------------------------------------
c:::,
0 N
i I
I !
I I
I I !
0 I
I 0
ii I
I I I i I I
I I
I I I I
I Z:o I
(;.JO Q..~
I ' I I i
I I
I !
~ --:..:....
.;_~
~c:,
I I
I oo I
- ?:;;
..J I '
a:
I I I
~
0 I
I L&Jo I
I.
.... ii z
I I '
~
r *.1 I
I 0
I I I '
I i
! I I
I I I I
-ll B
I I
i I
I I
I I
i I
j.1 I
' I I !
i j
I I
I I I I : I i i I.I I
I I
I I
I I
I i
I I
I I i i I
i I
I I
! I i
I I
I j
I I
' I I !
I i
I !
- I I
I e
FIGURE S.1 SURRY UNIT 1 -
CYCLE 5 REFERENCE BANK WORTH BANK WITH ALL OTHER BANKS PIDICT!D I
I I
I
. I I
I-I I I I : ! I I
I I
. I I '
I I
I I I I I
I I I I 1 I I
I I
I I i I I I I I I '
i I
! I I I I I
I I :
I I
I I
I I
I I
I I I I '
I
' I I
I I
I I
I I ! I I
I I I I ' I i I I
I i I I I !
I I
! I I I !
I I I
I I I I I
I I i I I I ! I I
I I
I I
I I
I I
I I
i I
I I
I., ;
' I I
I I
j
! I I I i ! I I I
I i I I I I !
I I i I i I I I
I I I
I i
I
'I I
I i
I I
i i I
! I I i i i I I
I ! I I
I I i I
I i
'.i i i I I
! I i I I I I *I
! ' I I !
I i
I I I I I ! ' I I
I I I
I I I
I I I I
I I I i I
i I I
! I i I i I
! ! I I I
I I
I I I I
I I I I I
I I
I I
I I I
I I
I I
I I
I I I
I
/
I I
I I
I
' i I
I I '
I I
I I I I I
I I I I I ! ! I I i I ' I I I I I I
I I I I '
I I
I I
I I
I I
I I
I
! I i
I I
i
.1 I
i I
I I
I I ! '
i I
i I
! I
' I '
I I I i I
I I
I.
i I
I I
I I I
I I
I I I
i I
I I
I
,-...,1, I
i I
I !
i i
I ! I I '
I I
- ' :...... )
I I
I 1
- ... 1 I
I I '.,
I I
I I
' ! I I I I I I ' -*
' I i
I I
I i I
i I
! r: I I i
~
I i !
I I !
I I I I
I, __
i I
I I
i I
I I
I I
I I i
i I I i
I I
I
- aa..-j I
I i
I I
I I i 1-*
I I
I I
I I I
I 1 I ! I i
.! i I
I illlt...... !
i I I I
i I
I !
I I
~
- : i
! I I
' i i
~
I i
I I :
I
)
i I
I I I
I I
I i I
s:--
i
! I ii I I
i I !
I i '
I I 1~1 '
- i i I I I
' i I
I I
i I I I
I I
I I
I i I-._
I
! I : '
I I
I I
I I
I
)
I I i i I I i
I i
' i I ' ! '
I '
I I
- I I i I I
I I J....Li-L I ' i I
- -H-:
l
,o 80 120 160 BANK POSITION ( STEPS )
43 OUT i
I I ' '
i I '*
I I
I I
I I
j I
I I
I I
I ' I I i*
- .I I
i i
' i I I i
! i I
I !
I I
I I '
i I
i I
I I I I
! ' I i
I '
I i I I
I I i i i I
I I
i I I I I
I
! ! i i
I i
i I i I
I I
I I !
' I
.. i I
' ' I
' I j
)
i I
i
.i I
I I '
I '
I '
.~
I L. ~;__!.._~.
200 229
D FIGURE s.2 NORTH ANNA UNIT 1 -
CYCLE REFERENCE BANK WORTH BANK WITH ALL OTHER BANKS IEl5UIID 2
OUT
- l-'--'-+-'--'---'--+--'--i-.._l,-..
- --1.....
- ....;...--'-....;....-'--i-.._-'-+-'--...:......;'---..-,1-.J'-'--'-....--'---'-J-,.._'--'-'...... --'---'---'---'-+-'-'--'---'--
~-,--!-
I,..' --l1'-+l_.._
!~---+--l'-..__
1~-l-' -.,...;
!~-'-++ l:..1 +-!-+---+__:..' ++--+-'-+-++-!--'l-4i-+...._+..:...;..' _!~-!.-++-1-.,.....,.__ J'
.. i I I I I I
I I
I I i I
I I
I I
,, :, 1, ;,
, 1,
1
- 1
, r 1,
, I g HH,-+-+-
1 !-
1 c--!1-+:-'--f-.!!!!!"i:'"-==+-,'-, -'f-"'~-.i.:---r-h1H1-+1--,--H 1 -+-+--:+-HH-'--1+-i-!,H-+,_;.4-...J1H-+-'-__..-'H:-+'-l_:_+...J'-+1-i ;::; 1--,,.....,-.;-1+',-..--:l-i--+:--i---1--,1-i,--+1-+""'*~...
~.;..-.;--+-+'-11"11~',-;:--+-+----+-....:.+-1-l--i--+--+--1:.....J:1-;--+....:.--1--'--+-...;..+-..-'-i---l--',-1...:.;....;........... ;~ l-l--i-!H,_J....,~'-._'H.... '-+'--1--':......--+-+-'--*~""llloio1--J....1-',-""~~:-+..... +....:.J....1~1--i-'---'--'-...J-1H,_._;_--1-....:......J11-,.... -i--Ll.....J_;__
1 I '
1 I
I
)~
1 I I
I I ' !
-o--~-~-i-
- j i ; ;
I i
I I
1"-.i I
I I I i
I i
I I
1 J I I I
! i I i' L' I
. i..J...L.l.....l...L.L.:...L.:.__
i
. I l-1-;-,;~,:~1:~, :;~1;~1:-t... '--.,.~_-t-'"_"'._-""1-+_--t*--+J..--.,..'""_-'1;::::;~~i.~,::1:~,:-t--~;-' -'l<-+:-+1+1-t--'-ii---+
11 +
i: _f<"TTi-:'-+-,--1-;_*...
.,.....;-<,-/-+ -_
_.-+ -----... -_t1=!~~===!=;=t:,=~i=~,-+L-1*
501-',,:-... :~1,:-+;'_:,:::'-,,~.. ::::!:~1:::~':~:~:'-,:..,:::::*~~~;-'~*,~~-:~-... ~-~~~~'-'!;::.. :::,:-+1.,_1:~:::~::::!:~:::~::::t1*::::~:~~:::'*:~,:.. :~~~'.. i-~
a.. ii H,H;-t' ----: -+, +...---:-, --,,;-;;---i--+--fH_.-i--+-+--l,---, ':
- ~~
- ! l I
I l I
- ; I j
-: i I I,
I 1-'H'-'--'--'--ih-+-T..-l--iH-+f-+-J**"'11H-+--l+-' -f-l\\.i_~,.;i-1--..-+--i'h-+~-l--+*-i'H'-+-+-~
.._-,-;.-+-I- :.-
-, I I !
I I
I i
I I
- '\\.. I
~ I T
[
I. I i :
I l I I I i
i I
1.., I I
I,
- c
... J-.;..1, """',-,.I-+-!
........_.J.___._~,-+-1------'--'-------o--....._.i_,.I_..!+
- '- I I
I I,,,
, ; 1 ! I I
I I
! I I I s
- i:TT Q::
1--i,--+,---'-: -....:.
,;_..;iµ....;.,_;_4....:...+.;.._+-;_..;e---;.....!.-+4-+-..J-J....+--1-s-l.--l--'1111111__;_~,-'--ll,"V.+-.J,....:...-+-'--l-....:...+...i.-.;..___,;.....;~_;_-*--.,--- j
- I
-! _.,__l!Hl---+1-+, -..-1---;,HI-"-'--.-!, +...;....-i-..-HHH-......:...-+--+--+---+--'-----;- !l..f I I i C) 0 hH-+-+-
,t-H---+-'--*--r--t--'--+---H-+-'--1---'---i---'-t--;-1 -,,-'-+-'--+'1--1,-'--+--~'-.-.-+--l--+-+--+-,..:.....1.....-f--1--+--t---~ 1*
- I: CD 1---",H,--,.:-+--:._: -,H-.---t---.---,..-,-+--,,-! ++..,-....
'1-,-;---,.--+.----+--'-+,-, -+--'--..;:""-"-""'='"1-~:-~-,.:-'----+-'---<ri-'---'--'--+-'--+-...._4----..... ;...... __ I..
I I '
I I
i T ' ". I
- '\\.
..J
- '-+-~'--+l---+-r....:...~l,.....:-1..!..'--,--'...:....~'__;_-+...!..--!--.L-J---l,-~....+'....;.+-.---!--+---J----L,.....!.I_-....Jaj.....:---l----\\l--+.....:.....L_'_;_!_;_-+-....:...-J--_;_l-!.....iL,.....!.-I a:
1--H1-+'---+-1....-+-+---+1--i--+--+-+-+-
1..-H--+---+---1---'-....--,--+
1 +1..;1-'-+-
1..-f.--'h 1--+--
1,......:"~'---'----t~....:...-,....~+--;......h-'-I-+-+-...;......., -
I 1
I I
I f
i"'\\,._____,
'; i I
0:::
- I 1 I i I ' I I,
I I
0
,, 1 1 : 1,
, 1
,, 1,,,
l.&J
. l --+--:H-'--i--'---+-~1----+--+-+...-;-...-+-+++--+--i,,--i--l+--i l!i--:-!-+-1:.-tl--c-, -!---:,---+-+-iii--:----+-, -i._..i1-~,i IH_---,.-~1-'-!-, -+-,. -----1 C,
I I
'\\.1 f---
- I I
I i
i I
'i
'I I
'""i!
~
! I I
I I
I I
- i j'\\.' I'\\.
1---f--, +-+-H-+-i-! -'1i---l---i----+1--+: -Hr---+, -+--i:-+--f.....:...-+--+.-i;--+-!.....:...-+--.:....1---;.__:..+-'--.,__'-i--'--I-++:
J._:a,;.--:;~
~....;...+_;_4-__.._--1--~ !-
~ -+-+-
,+1 -i;......_:., -+--il-1+1 ++--+-,-+,-'-+--',--1---'--+-,., -.,...;,,---++...;......:...4-:.....:.,----+-+---+--"--!-'--l---'--+=,~.:..,....;.....,...-+-.1--'---'-'-....J...--'--..:....j I
I I
! i i I l'C-_;
I° I.. i;-+,-+-,.J,--11-+:-~
1
,-+-t-+-+---;-t---i--1-+-+....:...-1-.L+'-+-;-~1'~'--+-'~:-~':-+--+-~,-+--,L..'t---i'-4:1--;.,-+'...;..-1-..,....+;'-,--+...,...-+--'--+:-~,-~--i:.:-:i~:=;::....,:f-j
- l -1f--i;--+-
1 -'--~1-'--l-,.1 -f--i 1
--"-'--+-++--,-.J--f--iH1-+-'-' _...__I'-+-l-'--f-'---'---+--+~';....;--'-1--+' ~+--'--.;.' ---'--....- r','"-*----+--+--!---l 1--+H-+-r' +'..;1:..-;'--t-+-IH-+!-++-+--+--+i-f--' -i'-+-+'-+-' -'H---+'----1-~-----;----;---;'H---'--f--'H---+--'~--;',_;'---1-~WL...i,_,i-
- 1 i'
i I 11 1 I I I;
- 11
- I I
I Ii j
I! l I
I I
I I I I i
I I I
I I i I I i
I I
I
- ;.I
+-
I I
i i
I I
I I
L.
I I
I
-"""."i...
80 120 BANK POSITION 44 160 CSTEPSl 200 228
Section 6
. VALIDATION OF THE ROD SWAP METHODOLOGY As mentioned earlier in this report, in addition to the control rod bank reactivity t;ests that were performed using the rod swap technique, control rod bank reactivity tests were performed using the conventional dilution/bora-
- tion technique during the reload startup of Surry 1, Cycle 5 and North Anna 1, Cycle 2.
The purpose of performing these side-by-side programs was to establish the technicalbasis for validating the rod swap methodology.
The results of these tests are presented in Tables 6.1 and 6.2, respectively, for
-*. Surry and North Anna.
The design values for these tests together with the test review criteria are also shown.
The data on these tables indicate the basic similarities that exist
- between the*results of these two test techniq11es with respect to the accepta-bility of the test r~sults, and therefore, the.verification. of the design calculations.
More specifically, for the Surry 1, Cycle 5 test results, the average absolute percent difference for the individual bank worth tests was 2.78% for the dilution/boration tests and 3.12% for the rod swap tests.
The percent difference associa_ted with the total reactivity worth of the control rod banks that were measured was 1.2% for the dilution/boration tests and 3.12%
for the rod swap tests.
For the North Anna 1, Cycle 2.tests results, the-average absolute percent difference for the individual bank worth tests was 3.46% for the dilution/boration tests and 4.83% for the rod swap tests.
The percent difference associated with the total reactivity worth of the control rod banks that were measured was -1.7% for the dilution/boration tests and
-0. 6% for _the rod swap tests.
In summary, the results of all of the tests were acceptable since all of the review criteria were met.
Therefore, the 45
e e
results of both test techniques demonstrated the validity of the results of the design calculations for.. control rod bank worths.
Since the reactivity worth of all of the control rod banks is deter-mined as part of *the rod swap methodology,. and since the same conclusions are*
- reached regarding the verification of the results of the design calculations for control rod bank worths, the results of the side-by-side programs demon-strate the validity of using the rod swap methodology in future Vepco startup physics testing programs.
46
-I"
--.J Control Rod Bank B-reference bank D
C A
Control Rod Bank C-Bank Din B-Banks C+D in A-Banks B+C+D in E A-+D TABLE 6.1 SURRY 1, CYCLE 5 ROD WORTH RESULTS ROD SWAP TECHNIQUE Bank Worth (pcm)
Measured Predicted Li(pcm) 1405 1374 31 1257 1205 52 881 856 25 649 637 12 977 925 52 1178 1158 20 6347 6155 192
~%)1 DILUTION /BORATION TECHNIOUE ( 6)
~--~--~~~~~__.__~
Bank Worth
( cm)
Measured Predicted Li(pcm) 1207 1188
- }.9 1082 1056 26 1999 2040
-41 1304 1242 62 5592 5526 66 Iii(%) I Review Criteria ll (%)
(%)
+2.3
+15
+4.3
+15
+2.9
+15
+1.9
+15
+5.6
+15
+l. 7
+15
+3.12
+10
= 3.12%
e Review Criteria ll (%)
(%)
+1.6
+15
+2.5
+15
-2.0
+15
+5.o
+15
+1.2
+10
= 2.78%
-1:--
CXl Control Rod Bank Table 6.2 HORTH ANNA 1, CYCLE 2 ROD WORTH RESULTS ROD SWAP TECHNIQUE Bank Worth (pcm)
Heasured Predicted l'.(pcm)
D-reference bank 1069 1095
..:.26 C
684 637 47 B
1085 1089
-4
- A 843 905
-36 Total 5260 5292
-32 1"'<%)1 J.HLUTION /BO RATION TECHNIQUE ( l)
Bank Worth Control (pcm)
Rod Bank Heasured Predicted l\\.(pcm)
D 1069 1095
-26 C-Bank Din 908 873 35 B-Banks C+D in 1321 1434
-113 A-Banks n+c+n in 1651 1649 2
SB-Banks A+B+c+D in 933 907 26 N-1 5942 6044
-102 IL\\ (%)1 Review Criteria l'.(%)
(%)
...:2.4
+15
+7.4
+15
-0.4
+15
-6.9
+15
+8.2
+15
-3.7
+15
-0.6
+10
= 4.83%
Review Criteria L\\ (%)
(%)
-2.4
+15
+4.0
+15
-7.9
+15
+O.l
+15
+2.9
+15
-1. 7
+10
= 3.46%
Section 7 CONCLUSIONS*
Based on the results of the side-by-side demonstration programs, it has. been concluded that it is appropriate to use the rod swap methodology to demonstrate *the validity of the results of the calculational models used to predict control rod bank reactivity worths.
Additionally, the rod swap tests that were performed during the initial startup of Surry 1, Cycle 5 and North Anna 1, Cycle 2 demonstrated that the implementation of the *test procedure was very straightforward and that the data acquisition and analysis were no more difficult or complex than that associated with control rod bank reactivity worth tests using the dilution/boration technique.
The potential savings in testing time and boron recovery processing requirements were also demonstrated.
49
e Section 8 REFERENCES
- 1)
M. L. Smith, "The PDQ07 Discrete Model," VEP-FRD-19, July, 1976.
- 2)
W. C. Beck, "The Vepco FLAME Model," VEP-FRD-24, October, 1978.
- 3)
W. C. Beck, "Rod Swap Design Data for Surry Unit 1, Cycle 5," NFE Technical Report No. 73, April, 1978.
- 4)
M. C. Cheok, "North Anna Units 1 and 2 Design Report," NFE Technical Report No. 106, *August, 1979.
- 5) J. G. Miller, S. A. Ahmed, R. T. Robins, H. H. Barker, "Design Predictions for Surry Unit No. 1, Cycle 5," NFE Technical Report No. 74 (Parts 1 and 2), May, 1978.
- 6)
T. J. Kunsitis, J. H. Leberstien, "Surry Unit 1, Cycle 5 Startup Physics Test Report," VEP-FRD-30, September, 1978.
- 7)
T. J. Kunsitis, J. H. Leberstien, T. K. Ross, "North Anna Unit 1; Cycle 2 Startup Physics Test Report," VEP-FRD-35, To Be Published.
50
.... './)
~
e e
APPENDIX IMPACT OF THE ROD SWAP TESTS ON THE HOT ZERO POWER STARTUP PHYSICS TESTING PROGRAM FOR RELOAD CORES Table A.l identifies the series of tests that have been routinely performed as part of the Vepco reload hot zero power physics testing programs.
Table A. 2. identifies the series of tests that will be performed in the future.
As can be seen from the information presented on these two tables, a basic trade-off is taking place.
Through the implementation of the rod swap program, more control rod bank reactivity worth information will be obtained in lieu of several. boron endpoint measurements.
This is justified for the following reason.
The boron endpoint data is supplementary to the control rod bank reactivity worth data in that the change in the boron endpoint values is merely another way of measuring the reactivity change associated with a change in the configura_tion of the control rod banks.
Since th_e rod swap tests provide a mechanism for measuring the reactivity worths of all of the control rod
- banks, the elimination of selected boron endpoint measurements does not repre-sent a loss of significant information.
In summary, the implementation of the rod swap tests will change the composition of the reload hot*zero power startup physics*testing program.
However, this change will result in more control rod bank reactivity worth data being obtained.
The elimination of sele.cted boron endpoint measurements does not result in the_ loss of required data.
51
e TABLE A.l HOT ZERO POWER STARTUP PHYSICS TESTING PROGRAM Reactivity Computer Checkout Boron Endpoint -
ARO Temperature Coefficient -
ARO H/D Flux Map*- ARO Bank D Worth Boron Endpoint - Din Temperature Coefficient - Din M/D Flux Hap - Din Bank C Worth - Din Boron Endpoint C+D in
- Temperature Coefficient -
C+D in
-Bank B Worth -
C+D in Boron Endpoint - B+c+D in Bank A Worth - B+c+D in Boron Endpoint - A+B+c+D in Banks A-+D Worth in Overlap
/
- Only performed when it is necessary to supply measured data to establish control rod bank withdrawal limits in order to meet the Technical Speci~
fication limits for the moderator temperature coefficient.
52
e TABLE A.2 HOT ZERO POWER STARTUP PHYSICS TESTING PROGRAM WIT'.d ROD SWAP Reactivity Computer Checkout Boron Endpoint -
ARO Temperature Coefficient -
ARO M/D Flux Map -
ARO Reference Bank Worth Boron Endpoint - Reference Bank In Temperature Coefficient - Reference Bank In M/D Flux Hap - Reference Bank In Control Rod Bank Worths (Control and Shutdown) 53