Forwards IE Insp Repts 50-280/79-65 & 50-281/79-85 on 791126-30 & Notice of Violation
ML18139A126
Person / Time
Site: Surry  Dominion icon.png
Issue date: 12/31/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18139A123 List:
References
NUDOCS 8004040250
Download: ML18139A126 (2)


See also: IR 05000280/1979065

Text

i

e

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORG,IA 30303

In Reply Refer To:

RII:BTM

50-280/79:..65

50-281/79.;85

Dtc s 1 1979

Virginia Electric and

1Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. 0. Box 26666

Richmond, VA

23261

Gentlemen:

'-

This refers to the in$pection conducted by B. T. Moon of this office on

November 26-30, 1979, of activities authorized by NRC Operating License No.

DPR-32 and DPR-37 for the Surry facility, and to the discussion of our findings

held with W. L. Stewart at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

  • selective examinations of procedures and representative records, interviews with

per~onnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

These items and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal

Regulations.

Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further ~oncom-

p_liance; and (3) the date when full compliance will be achieved.

In accordance with Section 2. 790 of the NRC ,-s "Rul'es of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) belie've to be

proprietary, it i~ necessary that you ma~e a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained_ in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

s'004 0 40 2 So

J

e

Virginia Electric and*Power

Company

-2-

t)

DEC S 11979

Should you have any -questions concerning this letter, we will be glad to discuss

them with you.

R. C. Lewis, Acting Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-280/79-65

and 50-281/79-85

cc w/encl:

W. L. Stewart, Manager

P. 0. Box 315

Surry, VA

23883

/