ML18136A217
| ML18136A217 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 09/27/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Proffitt W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18136A215 | List: |
| References | |
| NUDOCS 7911260175 | |
| Download: ML18136A217 (2) | |
See also: IR 05000280/1979050
Text
. ,,,
.t
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
Virginia Electric and Power Company
Attn: W. L. Proffitt
Senior Vice President, Power
Post Office Box 26666
Richmond, Virginia 23261
Gentlemen:
SEP 2 71919
This refers to the inspection conducted by B. R. Crowley of this office on
August 27-29, 1979 of activities authorized by NRC License Nos .. DPR-32 and
DPR-37 for the Surry Nuclear Plant facility, and to the discussion of o~r findings
held with W. L. Stewart at the conclusion of the inspection.*
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirements. This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2. 201 of the NRC' s "Rules of Practice", Part 2, Title 10, Code of Federal Regula-
tions.
Section 2.201 requires you to submit to this office, within 20 days of
yo,ur receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you, and the results achieved; (2)
corrective steps which will be taken to avoid further noncomplia~ce; and (3) the
date when full compliance will.be achieved.
In accordance with Section 2. 790 of the NRC' s "Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed. in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure)
Any such
- application must include a full statement of the reasons on the basis of which
.......
7911260 175'
- . ,,.
.....
Virginia Electric and Power Company
-2-
- SEP c, 71979
it is claimed that the information identified in the application is contained in a
separate of the document. If we do not hear from you in this respect within the
specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
,t.
Murphy,
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-280/79-50
and 50-281/79-70
cc w/enclosures:
W. L. Stewart, Manager
Post Office Box 315
Surry, Virginia 23883
.. _ ....