Docket Nos. 50-280 and 50-281 Mr. W. L. Proffitt OCTOBER

2. 3 1979 Senior Vice President - Power Virginia Electric and Power Company Post Office Box 26666 Richmond, Virgi~ta 23261

Dear Mr. *Proffitt:

DISTRIBUTION Docket Files 50-280 and 50-281 NRC PDR (2)

Local PDR NRR Rdg ORB1 Rdg D.Eisenhut W. Gammi 11 B. Grimes A. Sc hwencer D. Neighbors P. Kreutzer

. I&E (3)

OELD TERA NSIC ACRS (16)

Dech..t-~; (0 -

~-,

s-D-- ~ & p He have received your letter dated October 15, 1979~regarding Amendment Nos.@ind 53 to Operating license Nos. DPR-32 and DPR-37 for the Surry Power Station~ Unit Nos *. 1 and 2. These amendments add 1 icense conditions incorporating the Surry Fire Protection Program and approving implementation of certain modifications for increased fire protection..

The second paragraph of Section 3.1, Modifications of the Fire Protection Safety Evaluation Report (SER) indicates that the NRC staff will require additional infonnation in the form of design details, test results, or acceptance criteria to assure that the design is acceptable prior to actual irnpl ementation~

Your 1 etter stated that you did not agree with this paragraph because design detail approval prior to implementation is not required since design criteria as documented in the SER was established after extensive correspondence and meetings between VEPCO and the NRC.

You stated, also, that you ~ill submit a monthly status report of all modifications and design descriptions of the modifications as they are developed.

You are required by License Amendment Nos. 54 and 53 to provide information prior to implementation of the modifications.

You do not have to wait for NRC approval prior to implementation which is at your risk. However, if we find that additional information is required, we will request and expect to receive it. Within 20 days you should provide the dates by which design descriptions wil 1 be provided for each of the modificatfons so designated by an asterisk in Section 3.1 of the SER *

. Sincerely,.

Original Signed By A. Schwencer, Chief.*

    • operating Reactors Branch f}l Division of Operating Reactors cc:. See ~ext page. *SEE PREVIOUS YELLOW FOR CONCURRENCE OFFICE-~ i ~~~-::~~~.1. ~-.... -~~-~: ~~~~..... -~~~-=-~?.B.~........ *-~~~-~~-...........................................

SURNAM'.E~:...J.~~~~*9_h'.~?~~... ~?~.~\\\\/~-~~-~~.. *.. ~~~-i-~~?. * *..... -* -~~~-~~~-i. ~- * * * * * * * * * * * * * -* * * * -* * * * * * * * * * * * * * * * * * *

  • DATE~. :1.~(~-~e~~ *:.... -~ ?}t !??........ 1.~(1? !?.~.......... 1.~!.~~!?.~.........................

NRC FORM 318 (9-76) N'RCM 0240 f.u.s. GOVERNMENT PRINTING OFFICE: 1979-289-369

~

e g~~i~t8~Tf 2~ 50-280 -

NRC PDR Local PDR NRR Rdg ORB1 Rdg D. Eisenhut 50-281 Docket Nos. 50-280 and 50-281 W. Gammi 11

/

B. Grimes //

A. Schwe'JP'er D. Nei gbf,ors P~ KreOtzer Mr. W. L. Proffitt Senior Vice-~resident - Power

  • virginia Electric and Power Company*

Post Office Box 26666

_Richmond, Virginia 23261

Dear Mr *. Proffitt':

_ I &1x:(3)

Q[;tD ITRA NSIC ACRS (16)

We have received your letter dated Oc~ober 15, 1979, regarding Amendment Nos. 54 and 53 to Operating License ~os. DPR-32 and DPR"".37 for the Surry.

Power Station, Unit Nos_. l and 2. /hese amendments add license conditions *

  • incorporating the Surry Fire Prot7ction Program and approving implementation of certain modifications for increased fire protection.

The second paragraph of 5ectlo(3.1, ModHications of. the Fire Protection Safety Evaluation Report (SsR]\\ indicates that the NRC staff will require additional information in the fqrm o;f design details, test results, or

  • acceptance criteria to as~Gre tha,~ the design is acceptable prior to actual.implementation. /our 1 etter stated that you did not agrGe with this para*graph because design detail app'roval prior to implementation is not required since design/Criteria as documented in the SER was established after extensive corr;,esponden~e and m7~tings betw~en VEPCO and_the NRC.

You stated-, also, tflat you w1l1 -submit\\ monthly status report of all modifications/

ad ciesign descriptions of*\\he-modifications as they are

-developed.

, Yo~ are r~qufoed by ~icense Amendm~n! ~,Jo~. 54\\and 53. to provide info~m9tign pr10r to 1mpfementat10n of the mod1f1cat1ons. \\You do not have to wait for NRC ap~roval prior to implementation which i,~ at your risk.

However, if we find th,at additional information is required, \\we will request and expect to receive* it in accordance with l O CFR 50.109{ c).\\,,.:,,,_

~-------~--------~).

(.

Sincere1y,

  • 11 I JL\\

C G \\L <..*~-1,_\\\\'\\.,

~"""J.\\._\\l,.__t, ~

\\

~-

,, ' \\' 1;\\,;

t-0 L,, -,._,, b~'

p t~,._J._,\\. fL ~~

vJ-._:,J_,,J

'v-J 1 ' _..._,

1'rf G

  • c\\

c vi fi n.,5uJ'-U-'

pc,_ t-u -

\\

J d-fu 'oo- "'-~\\u<..\\.- hl',__0.uf'~ :'. P A. Schwencer, Chief t _.- {c.o-,,JL cl 8= ~cJ.,_f_c_i; 1._.,~_--/.,,, 0.

O~e~a ~i ng Reactor~ Branch #1 r,

~ \\)'

1

~v,., c!-~1'-f!/,,, __.,,.*,

D1v1s1 on f Opera:c ng.J!eactors.

i,.l.."wl s..

('l,u.::,_,._"',""~ - -,'.,.

a-

,11 d

I.~

~

v.... '\\ '-~ $

  • I er-tr:~ S ~ ¥- '

(z}'*.,, I,.:*-,/ I '=' h ~, '(/:,

\\'""'

oCJ c.

JNK FORM 318 (9-76) NR~ ~240 __

  • u.a. QOVB:RNMl!!:NT PRINTING OP'FICC: tD70 - 260.. 76P

.::::::::~:::::,

            • --------/

--d30

"-ck

.~. 60~281 * *

"" et --

.,, 1979

.. : r-,-~.~~ _***

DISTRIBUTION Docket Files* 50-280 arid 50-281 NRC PDR (2)

  • Loca 1 PDR '"* '.

. NRR Rdg ORBl

  • Rdg ',

D. Ei senhut * '

W. Gammill

. ~-:. '

-*-. ~>w. t~' Proffitt

  • senforiV1ce President-~ Power*

V1rgf i11a ** El ectr1c and Power <:ontpany B. Gr ini'es ;-;,. ::

  • A. Schwericer,-:;

D. Neighbors

  • Post *Office Box 26666

~-Richmon.d, Virginia 23261

Dear Mr.-:

Proffitt:

P. Kreutzer

. I &E ( 3)

OELD __ :*

TERA NSIC ACRS (16).

We have received your *letter dated October 15, 1979, regarding Amendment Nos. 54 and 53 to* Operating license Nos. DPR-32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2. These amendments add 11cense condtttons

_incorporating the Surry fire Protection Program and approving implementation of-certain mod1f1catfons,for increased fire protection.

The s_econd paragraph of Section 3.1. Modifications of the Fire Protection Safety Evaluation Report (SER) indicates that the_ NRC staff wfll require additional infonnation in the fonn of design details, test results. or.

acceptance criteria to assure that the desfgn is acceptable prior to actual implenentation_~,.Your*letter stated that you d1d not agree with

  • this paragraph because design detail approval prior* to* 1mplenentat1on 1s
  • not required since design criteria as documented 1n the SER was established

. after extensive correspondence and meetings between VEPCO and the NRC.

You stated,. al so.- that you will submit a monthly status report of all modifications and design descr1pt1ons of the mod1f1catfons as they are.

developed.

You are required by License Amendment No5'.,54 and 53 to provide fnformatfon prior to implementation of the modifications.

You do not have to watt for NRC*approval prior to implementation which fs at your risk *. However,.

1f we, find that additional ii,fonnatie>n *1s required. we will request and

  • expect to receive 1t. Within 20 days you should provide the dates by __.

which design descriptions will.be provided for each of the modff1cat1ons so designated by an asterisk in Sectfon 3.1 of the SER.

~Sincerely,..

.

  • Original Signed By_

.........j.

A. Schweneer,* Ch 1 ef a**

'operating.Reactors Branch fl <Y*--.a-*<--***--~***' =a*

D1vis1on of Operating Reactors;

.cc: '*see -~ext.page :_ *SEE PREVI ous YELLOW FOR CONCURRENCE

.. :..... -..... ~......... -"",,'....

---O~FICE-~ :~?.~-~-'.-~~~.1. ~-... _*; -~~-~-:~~~~..... -~~~-=-~~~-~....... ~ --~~-~-~~---.*.... _......... ::.:_;;~:. ~--.\\.~;;_.. ::~tz:=;=:r....

iJDNeighbors ASchwencer Gla inas MCutchi n

  • r.:,:t,~e iO:i'.'-.

SURNAME

ATE~.~-~(~.~(!.~****** *1. ~~1 !??. * * * * * *.1.~!~?e.~ * * * * * * *.. 1.~r~~!!~ ****** --* --~
,.... ** * ***.. ~--?~~\\~af.*.. ~

NRC FORM 318 (9-76) NRCM.0240

  • u.s. GOVERNMENT PRINTING OFFICE: 1979-289-369
  • ~~-

<~-

-"80 Docket

~ 281

---. ~-- *W. -L~: Proffitt senior :Vice President - Power*

~ 1979 Virginia -El ectrfc and Power Company_, -

Post/Offfce*aox 26666

--Richmond, Virginia 23261

Dear Mr. Proffitt:

./

r, rt **

DISTRIBUTION Docket* Fi 1 es. 50-280

_:

  • an'd 50-281 NRC P.DR (2)

Local 'PDR ** -.-

NRR Rdg - '._,: **>

ORBl: Rdg -,,. __ -~

D. Eisenhut *---

W. Gammill->':'> "

8. Grimes <~lU,."';;:

A

  • Sc hw e*ncer£ f: :'

D. Neighbors P. Kreutzer -

I&E ( 3:)

OELD : '.

TERA*--*:.:_, \\: '.'.,_: -

NSIC ACRS (16)

We have received your letter dated October 15. 1979, regarding hnendment

  • No_s. 54 and 53 to Operating License Nos.. DPR-32 and DPR..;37 for the Surry Power Station. Unit Nos.land 2 *. These amendments add license conditions incorporating the Surry Fire Protection Program and approving 1mp1ementat1on of certain modifications,for increased fire protection.

The second parag*raph of Section 3.1, Modifications of the Fire Protection Safety Evaluation Report (SER) indicates that the NRC staff will require additional infonnation in the fonn of design details, test results. or _

acceptance criteria to assure that the design 1s acceptable prior to

.actual imp1 enentation~

Your 1 etter stated that you did not agree wfth this paragrapta because design detail approval prior to--1mplanentat1on 1s not required since design criteria as documented 1n the SER was estab11shed

-after extensive correspondence and meetings between VEPCO and the NRC. -

You stated, al.so,- that you will submit a monthly status report of a11 modifications and design descriptions of the mod1ffcat1ons as they are developed.

You are required by License Amendment No~,54 and 53 to provide 1nfomation prior to implementation of the mod1ficatfons.

You do not have to wait -

for NRC approval prior to implementation which 1s at your r1sk *. However, if we -find that additional infonnatfon is required, we will request and

--. expect to receive it. Within 20 days you should provide the dates by_ -.

which design descript;ons will be provided for each of the modifications so designated by an asterisk in Sect.ion 3.1 of the SER *

~

~Sincerely,_

Original Signed By

  • .:-... 1 ~.

~. "*'.

A. Schwencer; Chief'.- *

    • operating Reactors Branch 11.~-------...... -.....,_..

D1vis1on of Operating Reactors:

\\

cc: *see ~ext page. *SEE PREVIOUS YELLOW FOR CONCURRENCE


.-DOR:ORBl*

DOR:ORBl DOR:PSB*

--OELD*

  • '*':_-:*'."""~'.'/

OFFICE~,-.*............... *... *.. *.... * *.

.-.- **......** *.-* **** -** -,- *.-. --~-*- 0 -

~- -.-,-******.*

, JDNeighbors ASchwencer GLainas MCutchi n suRNAME DATE.,.~-~!~.~(?-~....... ~ ~~t !??........ 1.~(1? e.~--........

1.~(~~(!~.............. 0 **** *; ******** -:~~::*:*::_ ******

NRC FORM 318 (9-76) N~CM 0240

  • u.s. GOVERNMENT PRINTING OFFICE: 1979-289-369

Docket Nos. 50-280 and 50-281 Mr. H. L. Proffitt e

OCTOBER 2 9 1919 Senior Vice President. - Power Virginia Electric and Power Company Post Office Box 26666 Richmond, Virginia 23261

Dear Mr. Proffitt:

    • DISTRIBUTION Docket Files 50-280 and 50-281 NRC PDR (2)

Local PDR NRR Rdg ORB1 Rdg D.Eisenhut W. Gammill B. Grimes A. Schwencer D. Neighbors P. Kreutzer I&E (3)

_OELD TERA NSIC ACRS (16)

He have received your letter dated October 15, 1979,, regarding Amendment Nos. 54 and 53 to Operating License Nos. DPR-32 and DPR-37 for the Surry Power Station, Unit Nos. 1 and 2.

These amendments add license conditions incorporating the Surry Fire Protection Program and approving implementation of certain modificijtions for increased fire protection.

The second paragraph of Section 3.1, Modifications of the Fire Protection Safety Evaluation Report (SER) indicates that the NRC staff will require additional information in the form of.design details, test results, or acceptance criteria to assure that the design is acceptable prior to actual implementation.

Your letter stated that you did not agree with this paragraph because design detail approval prior to imp1 ementation is _

not required since design criteria as documented in the SER was established after/ extensive correspondence and meetings between VEPCO and the NRC.

You dtated, alsp, that you will submit a monthly status report of all rnodi:fications' and design descriptions of the modifications as they are devEtloped.

Vou *are required by License Amendment Nos. 54 and 53 to provide information prior to implementation of the modifications.

You do not have to wait for. NRC approval prior to implementation which is at your risk.

However, if we find that additional information is required, we will request and expect to receive it. Within 20 days you shouid provide the dates by
  • which d\\;!s,gn, d~scriptions will be provided for each of the modifications
    • so desi_.gnated by an asterisk in Section 3.1 of the SER.

/ -

"*7

.. ':,}

./

Sincerely,.

/

.. //;xi(

      • c-*~

,~~~Y.pl '

A. Sc hwence.r, Chief

.. i

,s

(.

cc: S~e,next page

  • SEE PREVIOUS YELL Operating Reactors Branch #1 Division of Operating Reactors

\\

OFFiCE ~1):DP~;Q~~J.~..... _.OOR:.O~~.l......... PQ~;PS~.*:.......IPO_l;~D.................

1 I

suRNAME~l1 *:J.Q~~J.9~!:>.Qr~... AScn.w~n.G~r... 1.G.L.arnas...........................................................

D~TE ~i) ~n ~/?9~~. J_qr..11~...... i.1 P.1Fa~.......... 1 Pl...1?~.........,*........... _........ -~*-*._.. _..

.NRC FORM 3\\8 (9*76),NRCM 024G 1:ru.s. GOV-E11NMENT PRINTING OFFICE: 1979-289-369