ML18130A633
| ML18130A633 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 07/20/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Praffitt W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18130A635 | List: |
| References | |
| NUDOCS 7909210034 | |
| Download: ML18130A633 (2) | |
See also: IR 05000280/1979037
Text
-
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
In Reply Refer To:
RII :BRC
50-280/79-37
50-281/79-56
Virginia Electric and Power Company
Attn:
W. L. Proffitt
Senior Vice President, Power
Post Office Box 26666
Richmond, Virginia
23261
Gentlemen:
JUL 2 o 1979
This refers to the inspection conducted by B. R. Crowley of this office
on June 28-29, 1979 of activities authorized by NRC Operating License
Nos. DPR-32 and DPR-37 for the Surry Nuclear Plant facility, Units 1 and
2, and to the discussion of our findings held with G. E. Kane at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report.
Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were
disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice",
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure.
Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
J
-
e
Virginia Electric and Power Company
-2-
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
/~~
C. E. Murphy, .cBl~
Reactor Construction and
Engineering Support Branch
Enclosures:
Inspection Report Nos. 50-280/79-37
and 50-281/79-56
cc w/enclosures:
W. L. Stewart, Manager
Post Office Box 315
Surry, Virginia 23883
JUL 2 0 1979