ML18130A620

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-280/79-35 on 790620-22 & 28.No Noncompliance Noted
ML18130A620
Person / Time
Site: Surry Dominion icon.png
Issue date: 07/12/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18130A621 List:
References
NUDOCS 7909200176
Download: ML18130A620 (2)


See also: IR 05000280/1979035

Text

-

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

In Reply Refer To:

RII:EJV

50-280/79-35

Virginia Electric and Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. 0. Box 26666

Richmond, VA 23261

Gentlemen:

JUL 121979

This refers to the inspection conducted by E. J. Vallish of this office on

June 20-22 and 28, 1979, of a*ctivities authorized by NRC Operating License No.

DPR-32 for the Surry Power Statio~, Unit 1 facility, and to the discussion of

our findings held with W. L. Stewart at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2. 790 of the NRC' s "Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

C. E. Murphy, Chi

Reactor Const

ion and

Engineering Support Branch

-~**-~*~-'-

--~-*A --- ------*--

u

.-.---=-, * -**-*-.* "*-*"*~* *- ,*,

0

,

,-*,

        • ..-.c--.,

Virginia Electric and Power Company

Enclosure:

Inspection Report No.

50-280/79-35

cc w/encl:

W. L. Stewart, Manager

P .. 0. Box 315

Surry, VA_ 23883

-2-

JUL 12 1979

    • -*

-

-*~,~~-~ ~

.... ~- ......... ¥ ....... _----~*** -*