Text

-.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

JUL O 2 1979

In Reply Refer To:

RII:CME

50-281/79-40

Virginia Electric and Power Company

ATTN:

W. L. Proffitt

Senior Vice President, Power

P. 0. Box 26666

Richmond, VA

23261

Gentlemen:

This refers to the inspection conducted by C. M. Erb of this office on May 21-25,

1979, of activities authorized by NRC Operating License No. DPR-37 for the

Surry Power Station, Unit 2 facility, and to the discussion of our findings

held with W. L. Stewart at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard

within the specified period, the report will be placed in the Public Document

Room.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Sincerely,

, .

"

I

C. E. Murphy, Chi~

Reactor Construction and Engineering

Support Branch

    • I'

'1908240'2..7~

Virginia Electric and Power

-2-

Company

Enclosure:

Inspection Report No. 50-281/79-40

cc w/encl:

W. L. Stewart, Manager

P. 0. Box 315

Surry, VA

23883

JUL O 2 \\979

...