ML18130A486

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-281/79-38 on 790522-25 & Notice of Violation
ML18130A486
Person / Time
Site: Surry Dominion icon.png
Issue date: 06/29/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18130A481 List:
References
NUDOCS 7908240159
Download: ML18130A486 (2)


See also: IR 05000281/1979038

Text

\\

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

Virginia Electric and Power Company

Attn:

W. L. Proffitt

Senior Vice President, Power

Post Office Box 26666

Richmond, Virginia 23261

Gentlemen:

JUN 2 9 1979

This refers to the inspection conducted by J. D. Wilcox, Jr. of this office on

May 22-25, 1979 of activities authorized by NRC License No. DPR-37 for the Surry

Power Station facility, Unit No. 2, and to the discussion of our findings held

with W. L. Stewart at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.* Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

inspection findings.

These are discussed in the enclosed inspection report.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements.

This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's "Rules of Practice", Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of your

receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you, and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

I

In accordance with Section 2.790 of the NRC's "Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure.

Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, ~he report will be placed in the Public Document Room.

t :t.:\\:;i _: :,

\\'

.

.

J.{JfM \\ SC\\

7 9 O 8 2 4 0 lf\\J\\?\\F-' .

'

JUN 2 91979

Virginia Electric and Power Company

-2-

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

urphy, l;_;

Reactor Gonstruction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-281/79-38

cc w/enclosures:

W. L. Stewart, Manager

Post Office Box 315

Surry, Virginia

23883