ML18130A476
| ML18130A476 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 07/09/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Proffitt W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18130A477 | List: |
| References | |
| NUDOCS 7908230688 | |
| Download: ML18130A476 (2) | |
See also: IR 05000281/1979039
Text
\\
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
JUL O £ 1979
In Reply Refer To:
RII:MJG
50-281/79-39
Virginia Electric and Power Company
ATTN:
W. L. Proffitt
Senior Vice President, Power
P. 0. Box 26666
Richmond, VA
23261
Gentlemen:
This refers to the inspection conducted by M. J. Gouge of this office on June
19-22, 1979, of activities authorized by NRC Operating License No. DPR-37 for
the Surry Unit 2 facility~ and to the discussion of our findings held with
W. L. Stewart at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure.
Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identifi~d in the application is contained in a
separate part of the document.
If we do not hear from you in this regard
within the specified period, the report will be placed in the Public Document
Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Sincerely,
C. E. Murphy, C
Reactor Construction and Engineering
Support Branch
-.
- I
'i9082S0tJ8'g
r
Virginia Electric and Power
Company
Enclosure:
Inspection Report No. 50-281/79-39
cc w/encl:
_W. L. Stewart, Manager
P. 0. Box 315
Surry, -VA
23883
JUt O 9 1979
-2-