Drawing 8770-C-453, Rev. 3, Emergency Diesel Generator 1A/1B Load List
ML18127B281
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 01/16/1998
From:
Ebasco Services
To:
Florida Power & Light Co, Office of Nuclear Reactor Regulation
References
8770-C-453, Rev 3
Download: ML18127B281 (1)


Text

EB ASCO SER VICES INCORP ORATED

~PPR VED SCALE:

NONE HJF NOTE:

THIS REFLECTS AS-B CONDITION PER PCM 9 009 DESCRIPTION BY CH APPROVED DATE E J AUSTIN DIV ELECTRICAL DR.

H M CHIN CH.

D E ROXAS 8770- C-453

-,. ".!S!ONS RJM UJ I

10 11 FICE:

UMOOOSS.DWO I

9 EDG 1A/1B LOAD LIST UNIT 1

LOOP LOAD KW TIME TO START (SECONDS NOTE 8)

TIME TO START (SECONDS NOTE 8)

UNIT 1

LOOP /LOCA LOAD KW LOAD BUS (NOTE 2)

EQUIP MENT NUMBER NAMEPLATE EQUIVALENT RATING (NOTE 1)

KW NOTES 0 60 60 SEC M 16N SEC 60 NIN 4 NRS (SEE NOTE 11)

(SEE NOTE ll) (SEE NOTE II) 0 60 60 SEC M NNC SEC 60 MIN 4 NRS (SEE NOTE 11) (SEE NOIE 11) (SEE NOIE ll)

E UIPMENT SE UENCED AND ACTlVATED BY AN AUTO PROCESS OR ACCIDENT SIGNAL CONT D 480V MCC IA-5 480V MCC IA-6 I LOT 20 20 KW IOHP+ 20KW 28.0 10 10 10 2(LO 10 10 10 HVA3A/ACC3A 6.7 28.0 6.7 28.0 6.7 6.7 6.7 6.7 29.3 6.7 28.0 HVA-3A 480V MCC IA-6 29.3 29.3 7.5 HP 29.3 26.0 29.3 29.3 29.3 3 HP 480V MCC IA-6 HVE-13A 28.0 HVS-4A HVE9A 53.9 53.9 53.9 28.0 53.9 480V MCC IA-5 480V MCC IA6 60 HP 50 HP 53.9 28.0 2.7 N/A 28.0 N/A N/a N/A N/A N/A 28.0 38.1 38.1 28.0 38.1 38.1

&BQV MCC IA-5 480V MCC IA-5 20 HP 15.5 15.5 15.5 15.5 15.5 HVS-2A HVE-3A 28.0 15.5 15.5 28.0 40 HP 21.6 21.6 28.0 21.6 480V MCC IA-5

21. 6 28.0 21.6 7.9

, 28.0 21.6 4.0 4.0 28.0 4.0 7.9 KW 21.6 IA 6.8 6.75 EA 6.75 KW EA N/A 28.0 1,4 6.8 28.0 6.8 6.8 48OV MCC IA-5, 6 N/A IA. 18 188.6 28.0 188.6 181.8 28.0 I 47.8 147.8 141.0 68 EA 52 480V MCC IA-5. 6 68 KW EA 52 52 40.0 52 1,4 52 IA. IAA 52 52 52 52 52 52 52 48QV MCC IA-5 480V SWGR IA-2 HVS-5A 1,12 27 27 N/A 30 HP 250 HP 27 45.0 27 27 27 45.0 27 IA 198.4 45.0 N/A N/A 45.0 19IL&

191E&

198.4 27 27 27 225 &

225.4 45.0 45.0 NOTE 13 (37.4)

(9.4) 70.0 70.0 208.5 N/A 208. 5 208.5 N/A I,'10,12 I LQT 1810.0 1810.0 N/A 208.5 Kw N/a 4.16KV SWOR IA-3 N/A N/A N/A N/A 1.12 328 480V MCC IA-6 40 HP 1810.0 1810.0 IA N/a 1.12 N/A N/A N/A 6.7 6.7 1810.0 1810.0 7.5 HP 6.7 480V MCC IAB 1,12 1.8 1.8 1810.0 1810.0 1.8 N/a N/A N/A 480V MCC IAB 2.0 HP N/A 2 49l8 249 8 N/A (87.4)

(87.4)

N/A 1810.0 1,12 1810.0 3610. 0 3610.0 (6.7)

(6.7)

(6.7)

(6.7)

N/A N/A 29.7 1,12 40 HP 29.7 IA 4810.0 29.7 4810.0 N/A 480V MCC IA-8 N/A (13.1)

(283.4) 4810.0 4810.0 1.12 1.3 721 0 1.5 HP 7.5 HP RV-3 HVE-11 N/a 480V MCC IA-5 480V MCC IA-6 N/A 721 0 N/a N/a 1,12 N/A N/a N/A N/A 4.1 4.1 721 0 721 0 4.1 Ii)0 (30.6)

(30.6) 721 0 QF THE DESIGN INFORMATION FOR THE CHANGES SHOWN IN THIS REVISION HAS BEEN ENGINEERED BY FLORIDA POWER dc'UGHT COMPANY.

KW 3500 KW 3730 KW 3790 KW 3860 KW 3960 KW OC KCQRDS KCBCEIITCSiTFDL CENTER NUCLEAR SAFETY RELATED PC/M %003 REY'O'f LOADS (E97, (EIZ)

LDAD BI.K 11 TOT (BIZ)

IHE ORIGINAL DRAWING AND SUBSEQUENT REVISIONS

THEREOF, WITH APPROVAL NAMES, INITIALS AND WITH THE PE SEAL, IF APPUCABLE ARE MAINTAINED IN THE FILES OF EBASCO SERVICES INCORPORATED.

UNIT 1A/1B LOOP RAG I-L.Q IZIP P IU Opz Q

cn w I-oQ 80 MIN 4 HRS 60 SEC 80 MIN PC M 016 194 REV:

MOV LOADS (B3,B4,B5),

LOAD BLK 1

TOT (C5),

CALC REV (G9),

LOOP/LOCA TOTAL LOAD (J7)

FLORIDA POWER 8c LIGHT COMPANY ST LUCIE UNIT NO 1

I-O cc Z

p) O ICO zw(S p o cn

~ K OJ I~O bJ OJ O fY CO CLJ

)-I-z In +

2346.2 2326.4 33.0%

33.5%

12/~/94 EMERGENCY DIESEL GENERATOR 1A/1B

. LOAD LIST PC M 149 193 REV:

EDG 1A/1B LOAD LIST, (K2) NOTE 7, (H6) REF.(J7 8) UNIT 1A/1B LOOP/LOCA SETTINGS.

DATE 12/l/92 EDG 1A/1 B LOAD LIST UNIT 1

LOOP UNIT 1

LOOP /LOCA LOAD KW TIME TO START (SECONDS NOTE 8)

TIME TO START (SECONDS NOTE 8)

LOAD BUS (NOTE 2)

EQUIPMENT NUMBER NOTES LOAD KW EQUIVALENT KW (NOTE 1)

DESCRIPTION NAMEPLATE RATING 0 60 60 SEC M NiN-SEC 60 NIN 4 NRS (SEE NOTE Il) (SEE NOTE 11) (SEE NOIE ll) 0 60 60 SEC M NIN-SEC 60 MIN 4 NRS (SEE NOTE Il) (SEE NOTE ll) (SEE NOIE I'I)

E UIPMENT SE UENCED AND ACTIVATED BY AN AUTO PROCESS OR ACCIDENT SIGNAL 324.4 10.2 324.4 324. 4 10.2 32&.h 400 HP 16KV SWOR IA-3 IA N/A N/A N/A HIGH PRESSURE SAFETY INJECIION PUMP 1.9 N/A N/A 91.6/ 0.5 HP VARIOUS 825J9 4 KW I LQT 82.5 10.0 N/a MOTOR OPERATED VALVES N/A 10.0 1,4 10.0 124.4 124.4 124 4 124.4 124.4 124.4 10.0 124.4 KW 480V MCC la5.6,7.8 124.4 I LQT EMERGENCY LIGHTING 135.7 KW 135.7 10.0 135.7 460V MCC IA5,6,7,AB CLASS IE POWER PANELS I LQT 135.7 135.7 10.0 135.7 135.7 135.7 10.0 19.8 19.8 10.0 13.1 EA 25 HP EA 13.1 13.1 480V MCC IA-6 480V MCC IA-7 IA; 18 BORIC AE)0 MAKEUP PUMPS N/A N/A 1.4 10.0 2.3 5 HP IA 0/0 FUEL TRANSFER PUMP 10.0 10.0 27.7 27.7 71.3 100 HP 10 HP EA 40 HP 12 HP 1.6 KW 480V SWOR IA2 IA CHARGING PUMP RCP OIL UFT PUMPS CABLE SPREAD ROOM A/C COMPUTER ROOM A/C 27.7 10.0 36 71.3 36 10.0 71.3 18 18 71.3 10.0 9 EA 182-A IA2-B IAT-A 181-8 N/A 480V MCC IA-5, 6 N/A 10.0 480V MCC IA-6 480V MCC IA6 480V MCC IA-6 N/A N/A 10.0 10.8 10.8 10.8 10.8 10.0 10.8 10.8 10.0 10.8 ACC IQA 1.6 1.6 1.6 1.6 10.0 1.6 1.6 10.0 1.6 SA HYDROGEN ANALYZER CUBICLE 10.0

.9 EA 460V MCC IA-7 480V MCC IA-7 D/0 OIL CIRCULATION PUMPS EDG AIR COMPRESSOR MOTOR 1.8 1.8 1.8 10.0 I HP EA 7.5 HP IAI, IA2 1.8 1.8 1.8

'/A 6.7 10.0 6.7 6.7 N/A 6.7 10.0 6.7 20 KW 480V MCC IAB 10.0 PLANT sECURITY INvERTER 20 20 20 20 10.0 20 20 20 10.0 20 KW 20 480V MCC IAB UPS INVERTER RECTIFIER 20 20 20 10.0 20 20 20 749.2 10.0 489.1

&79.7 423.9

'31. 6 10.0 668.7 LOAD BLOCK NO I TOTAL 304.8 N/A LOW PRESSURE SAFETY INJECllON PUMP 304.8 4.16KV SWGR IA-3 N/A N/A N/A 400 HP 13.0 13.0 304.8 IA 123.6 123.6 123.6 13.0 235 235 235 15 13.0 CONTAINMENT FAN COOLERS 480V SWGR IA-2 150 HP EA 123.6 EA Ia, 18 123.6 123.6 13.0 539.6 13.0 539.8 235 123.6 LOAD BLOCK NO 2 TOTAL 354.9 354.9 16.0, 354.9 354.9 354.9 16.0 354.9 354.9 COMPONENT COOUNG WATER PUMP SHIELD BUIIJ)ING EXHAUST FAN 4.16KV SWOR IA-3 480V MCC IA-6 IA 450 HP 60 HP 27 27 16.0 N/A 27 N/A N/A 27 16.0 6A N/A N/A N/A 31.5 31.5 16.0 31.5 16.0 31.5 31.5 KW 480V MCC IA-6 HVE 6AI. 6A2 SHIELD BUILDING VENTIL HEATERS 16.0 354.9 354.9 413.4 354.9 16.0 LOAD BLOCK NO 3 TOTAL 449.2 449.2 449.2 449.2 449. 2 19.0 449.2 19.0 449.2 4.16ICV SWOR IA-.3 600 HP IA INTAKE COOUNG WATER PUMP 449.2 449.2 449.2 19.0 449.2 449.2 449.2 19.0 LOAD BLOCK NO 4 TOTAL 500 HP IA N/A N/A N/A 1.5,6.7 22.0 CONTAINMENT SPRAY PUMP 4.16KV SWOR IA3 439.5 22.0 403.2 LOAD BLOCK NO 5 TOTAL 1,5 25.0 235.2 322.6 286.3 235.2 286.3 25.0 4.16KV SWOR IA-3 350 HP IA 286 3 286.3 AUXIUARYFEEDWATER PUMP 286.3 25.0 286.3 286.3 313.1 235.2 235.2 25.0 LOAD BLOCK NO 6 TOTAL

REFERENCES:

NOTES:

l.

CALCULATION PSL-1 F-J E90013 REV'3, ST LUCIE UNIT 1

EMERGENCY DIESEL GENERATOR 1A 6c IB ELECTRICAL LOADS l.

THE KW LOADS NOTED REFLECT EITHER NAMEPLATE DATA OR CALCULATED DATA REFER TO CALCULATION PSL-1-F-J-E-90-013 FOR THIS INFORMATION.

8.

THE TIME TO START INCLUDES THE 10 SECONDS REQUIRED FOR THE EDG TO COME UP TO RATED FREQUENCY AND VOLTAGE, AND THE EDG GENERATOR OUTPUT BREAKER TO CLOSE.

2.

PER CALCULATION NO PSL-I F-J-E-90-013 PARA 5.1 THE IA EDG HAS THE HIGHEST KW LOADING AND THEREFORE THE 1A DATA ENVELOPES BOTH EDG 1A 6c 1B.

9.

THIS LOAD HAS A.2 SECOND llME DELAY BUT IS CONSIDERED TO BE PART OF THE FIRST LOAD BLOCK.

10.

LOAD STARTS AT 30 MINUTES (REFER TO CALCULATION PSL-1-F-J-E-90 0) 3).

3.

REVISIONS TO (HIS DRAWING MUST BE DONE CONCURRENTLY WITH REVISIONS TO ELECTRICAL CALCULATION NO PSL-1-F-J-E-90-01 3 AND MECHANICAL CALCULATION NO PSL-l FJM-90-024.

11.

THE LOADS SHOWN FOR EACH TIME INTERVAL ARE THE MAXIMUM LOADS IDENTIF)ED FOR THE TOTAL INTERVAL EVEN THOUGH THEY MAY BE EUMINATED OR REDUCED PRIOR TO COMPLETION OF THAT INTERVAL REFER TO CALCULATION PSL1-F-J-E-90-013 FOR EXACT LOAD.

4.

DENOTES EITHER A REDUCllON OR ELIMINATION OF A LOADREFER TO CALCULATION PSL-IF-J90-013.

12.

MANUALLYAPPLIED LOAD 13.

AUTOMATIC LOAD SEQUENCING OF EQUIPMENT IS COMPLETED AT T=45 SECONDS.

5.

PER CALCULAl)ON NO PSL-1-F-J-E-90-013 THE LOADING IS REDUCED AFTER 4 HOURS FOR LOOP/LOCA AND 27 HOURS FOR LOOP.

MAXIMUMLOAD USED FOR CONSERVATISM.

TOTALS MAXIMUM VALUES FROM CALCULATION PSL1 FJE90 013 (NOTE 11)

DESIGN MARGIN (BASED ON CONTINUOUS RATING) 14.

'IHE FIRE PUMP IS ENABLED TO START AT T=45 SECONDS FOR LOOP ONLY.

IT IS NOT EXPECTED TO START UNLESS THE FIREWATER HEADER PRESSURE DROPS BELOW 85 PSIG.

6.

REFLECTS AN INCREASE IN LOAD DUE TO PUMP RUNOUT (REFER TO CALCULATION PSL-1-F-J-E-90-013).

7.

PER CALCULATION NO PSL-1-F-J-E-90-013 THE RUNNING KW MAY INCREASE TO 439.5 AT 80 MINUTES DESCRIPTION BORIC A(30 HEAT TRACING/WASTE MANAGEMENT ~

CONTROL ROOM A/C OUTDOOR UNIT CONTROL ROOM A/C INDOOR UNIT CONTROL ROOM BOOSTER FAN AUXIUARY BUILDING SUPPLY FAN ECCS AREA EXHAUST FAN REACTOR CAVITY COQUNG FAN REACTOR SUPPORT CQOUNG FAN CVCS HEAT IRA(3NG BORIC A(30 TANK HEATERS LOAD BLOCK NO 7 TOTAL BATTERY CHARGERS LOAD BLOCK NO 8 TOTAL AUX. BLD. SWGR RM SUP FAN FIRE PUMP LOAD BLOCK NO 9 TOTAL LOAD BLOCK NO 10 TOTAL PRESSURIZER HEATERS INSTRUMENT AIR COMPRESSOR AIR COMPRESSOR COOUNG FAN AIR COMPRESSOR COOUNG PUMP LOAD BLOCK NO 11 TOTAL LOAD BLOCK NO 12 TOTAL FUEL POOL COQUNG PUMP LOAD BLOCK NQ 13 TOTAL ELEC EQUIP ROOM ROOF VENT FAN ELEC EQUIP ROOM EXH FAN LOAD BLOCK NO 14 TOTAL GENERAL NOTES:

1.

N/A NOT APPUCABLE 2.

G RATING R F FSAR TAB 8.3-3 BASE CONTINUOUS O93'F 2000 HR/YEAR 7 DAY YEAR 4 HR/YEAR 1/2 HR/YEAR UNIT 1A/1B LOOP/LOCA 0 60 SEC 60 SEC 80 MIN 80 MIN 4 HRS 0 60 SEC 2128.3 39.2%

3218 3145 0 2767 5 10.1%

20.9%

8.1%