ML18117A103

From kanterella
Jump to navigation Jump to search
Updated Final Safety Analysis Report, Chapter 13, Initial Tests and Operations
ML18117A103
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 04/26/2018
From:
Florida Power & Light Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML18117A085 List:
References
L-2018-103
Download: ML18117A103 (1)


Text

13.0 INITIAL TESTS AND OPERATIONS

13.1 Initial Preparation Before Fuel Loading

The organization of the startup group and the tests to be performed prior to reactor refueling at the time of initial plant startup can be found in the original docketed FSAR.

13.2 Final Unit Preparation

The procedures for core loading and post loading tests can be found in the original docketed FSAR.

13.3 Initial Testing of the Operating Reactor

Tests that will be performed from initial core loading to rated power can be found in the original docketed FSAR.

13.4 Operating Restrictions

Restrictions on tests to be performed during normal operations at power are addressed in the original docketed FSAR.

13.5 Reload Physics Testing

Startup physics testing will be performed in accordance with ANSI/ANS 19.6.1-2005, "Reload Startup Physics Tests for Pressurized Water Reactors."

13-1 Revised 03/11/2016