ML18117A086

From kanterella
Jump to navigation Jump to search
Submittal of Updated Final Safety Analysis Report - Unit 4 Cycle 29 Update and License Renewal 10 CFR 54.37(b) Report
ML18117A086
Person / Time
Site: Turkey Point  
Issue date: 04/26/2018
From: Coffey R
Florida Power & Light Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML18117A085 List:
References
L-2018-103
Download: ML18117A086 (3)


Text

Security-Related Information - Withhold Under 10 CFR 2.390 10 CFR §50.71(e) 10 CFR §54.37(b)

L-2018-103 April 26, 2018 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555-0001 Re:

Turkey Point Units 3 and 4 Docket Nos. 50-250 and 50-251 Updated Final Safety Analysis Report - Unit 4 Cycle 29 Update and License Renewal 10 CFR 54.37(b) Report Florida Power & Light Company (FPL) has completed the Unit 4 Cycle 29 (4C29) update of the Turkey Point Units 3 and 4 Updated Final Safety Analysis Report (UFSAR) and review of design activities to identify any new systems, structures, and components for potential impact on the license renewal aging management programs. This letter submits both the periodic update of the UFSAR and the results of the license renewal review in accordance with the requirements of 10 CFR 50.71(e) and 10 CFR 54.37(b), respectively.

The enclosed UFSAR chapter files accurately reflect plant changes made since the previous update (Unit 4 Cycle 28). This update incorporates changes for the period covering April 29, 2016 through October 31, 2017. Miscellaneous user comments have also been incorporated. The documents enclosed are identified in the Attachment as public files with redactions in Chapters 2, 3, 4, 6, 8, 9, and 14, and non-public which are to be withheld from public disclosure under 10 CFR 2.390.

The Turkey Point UFSAR is maintained as an electronic living document. Identified changes are posted against applicable chapters and considered incorporated upon approval and implementation.

This UFSAR update is a snapshot of the continually revised UFSAR. Accordingly, FPL identifies periodic UFSAR updates required by 10 CFR 50.71(e) as Unit 4 cycle-specific updates, consistent with the existing UFSAR update commitment linked to completion of each Unit 4 refueling outage (10 CFR 50.71(e)(4) exemption dated July 16, 1998). While revision dates have been incorporated on UFSAR pages, in order to ensure consistency beginning with this update revised pages are annotated in the lower right corner by the date the change was added to the document and a revision issued. The cycle designator (in this update C29) is provided with the revision bar to identify changed portions.

(Certain enclosures transmitted herewith contain SUNSI as identified in the Attachment. When separated from those enclosures, this transmittal document is decontrolled.)

Florida Power & Light Company 9760 SW 344th St., Homestead, FL 33035

Security-Related Information - Withhold Under 10 CFR 2.390 Florida Power & Light Company Turkey Point Nuclear Plant License Renewal 10 CFR 54.37(b) Report L-2018-103 UFSAR Update Unit 4 Cycle 29 Page 2of2 The license renewal review addressed the requirements of 10 CFR 54.37(b) for the current UFSAR update period. This review did not result in any newly identified systems, structures, and components per the requirements of 10 CFR 54.37(b).

If you have any questions, then please contact Mr. Robert Hess, Licensing Manager, at 305-246-4112.

Sincerely, Regional Vice President - Southern Region Florida Power & Light Company

Enclosures:

Identified on Attachment cc:

Regional Administrator - USNRC Region II USNRC Senior Resident Inspector - Turkey Point (letter only)

USNRC Project Manager - Turkey Point (letter only)

Security-Related Information - Withhold Under 10 CFR 2.390 Florida Power & Light Company L-2018-103 Turkey Point Nuclear Plant Attachment Page 1 of 1 Attachment Turkey Point Nuclear Plant Updated Final Safety Analysis Report Unit 4 Cycle 29 Update List of Public Files (certain redacted pages in seven files) 01_LOEP_P.pdf 158 KB 02_CHAPTER_01_P.pdf 3,907 KB 03_CHAPTER_02_P.pdf 2,325 KB 04_CHAPTER_03_P.pdf 11,761 KB 05_CHAPTER_04_P.pdf 3,263 KB 06_CHAPTER_05_P.pdf 38,985 KB 07_CHAPTER_06_P.pdf 2,459 KB 08_CHAPTER_07_P.pdf 6,769 KB 09_CHAPTER_08_P.pdf 819 KB 10_CHAPTER_09_P.pdf 2,702 KB 11_CHAPTER_10_P.pdf 351 KB 12_CHAPTER_11_P.pdf 1,712 KB 13_CHAPTER_12_P.pdf 70 KB 14_CHAPTER_13_P.pdf 36 KB 15_CHAPTER_14_P.pdf 62,737 KB 16_CHAPTER_14_APPENDIX_A-G_P.pdf 6,730 KB 17_CHAPTER_15_P.pdf 14 KB 18_CHAPTER_16_P.pdf 150 KB 19_APPENDIX_A_P.pdf 105 KB 20_APPENDIX_B_P.pdf 36 KB List of Non-Public Files (SUNSI) 03_CHAPTER_02_NP.pdf 2,459 KB 04_CHAPTER_03_NP.pdf 16,135 KB 05_CHAPTER_04_NP.pdf 7,074 KB 07_CHAPTER_06_NP.pdf 3,619 KB 09_CHAPTER_08_NP.pdf 8,342 KB 10_CHAPTER_09_NP.pdf 3,032 KB 15_CHAPTER_14_NP.pdf 63,621 KB