Text
e
eC~F,lc__
UNITED STATES
NUCLEAR REGULATORY COMMISSION
.REGION II
In Reply Refer
RII:DJB
50-280/79-31
50-281/79-49
To:
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
JUN 2 6 1979 -
Virginia Electric and Power Company
ATTN:
W. L. Proffitt
Senior Vice President, Power
P. 0. Box 26666
Richmond, VA
23261
Gentlemen:
This refers to the inspection conducted by D. J. Burke of this office on
April 30 - June 1, 1979, of activities authorized by NRC Operating License
Nos. DPR-32 and DPR-37 for the Surry Unit 1 and 2 facilities, and to the
discussion of our findings held with W. L. Stewart at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
We have examined actions you have taken with regard to previously identified
enforcement matters.
These are discussed in the enclosed inspection report.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within
20 days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis
of which it is claimed that the information is proprietary, and should be
prepared so that proprietary information identified in the application is
contained in a separate part of the document.
If we do not hear from you in
this regard within the specified period, the report will be placed in the
Public Document Room .
(
/
e
Virginia Electric and Power
Company
-2-
JUN ~* 6 1979
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Enclosure:
Inspection Report Nos. 50-280/79-31
and 50-281/79-49
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA
23883
Sincerely,
e.c. I
-
R. C. ~ting Chief
Reactor Operations and Nuclear
Support Branch