ML18116A281

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 79-17, Pipe Cracks in Stagnant Borated Water Sys at PWR Plants. Action Required
ML18116A281
Person / Time
Site: Surry, North Anna  
Issue date: 07/26/1979
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
References
NUDOCS 7908070761
Download: ML18116A281 (2)


Text

Ii I

I Refer To:

e UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTA ST., N.W., SUITE 3100 ATLANTA, GEORGIA 30303 JUL 2 6 1979 Virginia Electric and Power Company ATTN:

W. L. Proffitt Senior Vice President, Power P. 0. Box 26666 Richmond, VA 23261 Gentlemen:

The enclosed Bulletin 79-17 is forwarded to you for action.

A written response is required.

If you desire additional information regarding this matter, please contact this office.

Sincerely,

Enclosure:

IE Bulletin 79-17 7908070761

Virginia Electric and Power Company cc w/encl:

e W.R. Cartwright, Station Manager Post Office Box 402 Mineral, Virginia 23117 P. G. Perry Senior Resident Engineer Post Office Box 38 Mineral, Virginia 23117 W. L. Stewart, Manager Post Office Box 315 Surry, Virginia 23883 e ~

~*

f f