ML18116A214
| ML18116A214 | |
| Person / Time | |
|---|---|
| Site: | Surry |
| Issue date: | 05/31/1979 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Proffitt W VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| Shared Package | |
| ML18116A215 | List: |
| References | |
| NUDOCS 7907300075 | |
| Download: ML18116A214 (2) | |
See also: IR 05000280/1979019
Text
-* ,..
-*-*'*....: .. ~----*,,. _ _.. ...... -.... ~-~--:- .... --~--******----***-****-***-**-* -*.-* ._._, ..... --~ .. -- *--*-----~ ..... -.
l
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
MAY 3 1 1979
In Reply Refer To:
RII:SAE
50-280/79-19
50-281/.79-28
0
Virginia Electric and Power Company
ATTN:
W. L. Proffitt
Senior Vice President, Power
P. 0. Box 26666
Richmond, VA 23261
Gentlemen:
This refers to the inspection conducted by S. A. Elrod of this office on
April 16-19, 1979, of activities authorized by NRC Operating License Nos.
DPR-32 and DPR-37 for the Surry Power Station, Unit 1 and 2 facilities, and
to the discussion of our findings held with W. L. Stewart at the conclusion
of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in
the enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If
this report contains any information that you (or your contractor) believe
to be proprietary, it is necessary that you make a written application
within 20 days to this office to withhold such information from public
disclosure.
Any such application must include a full statement of the
reasons on the basis of which it is claimed that the information is proprie-
tary, and should be prepared so that proprietary information identified in
the application is contained in a separate part of the document. If we do
not hear from you in this regard within the specified period, the report
will be placed in the Public Document Room ..
(~ \\
\\ _,)
.... ,.--
. *****---~- *-.--.. : .. ..-,,.-.,* *-* -....,.-*-~*-....... **-****** -* ~
--*----**-
-~ ... -..-
... ~ .*.*** J.- -----. -***-.
Virginia Electric and Power Co.
-2-
MAY 3 1 1979
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Enclosure:
Inspection Report Nos.
50-280/79-19 and 50-281/79-28
cc w/encl:
W. L. Stewart, Manager
P. 0. Box 315
Surry, VA
23883
Sincerely,
e.c. I
,
R. C. L~g Chief
Reactor Operations and Nuclear
Support Branch