Forwards IE Insp Repts 50-280/79-04 & 50-281/79-04 on 790115-19.No Noncompliance Noted
ML18113A959
Person / Time
Site: Surry  Dominion icon.png
Issue date: 02/16/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18113A960 List:
References
NUDOCS 7903280074
Download: ML18113A959 (2)


See also: IR 05000280/1979004

Text

  • In Reply Ref er:

RII:JDW

50-280/79-04

50-281/79-04


----

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303

FEB 1 6 1979

Virginia Electric and Power Company

Attn:

Mr. W. L. Proffitt

Senior Vice President, Power Operations

P. 0. Box 26666

Richmond, Virginia

23261

Gentlemen:

This refers to the inspection conducted by Mr. J. D. Wilcox of this office

on January 15-19, 1979, of activities authorized by NRC Operating License

Nos. DPR-32 and DPR-37 for the Surry facility, and to the discussion of our

findings held with Mr. W. L. Stewart at the conclusion of the inspection.

_/'

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were

disclosed.

One new unresolved item resulted from this inspection and is discussed in

the enclosed report.

This item will be examined during subsequent

inspections.

In accordance with Section 2.790 of the NRC's "Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within

20 days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the

basis of which it is claimed that the information is proprietary, and should

be prepared so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear from you in

this regard within the specified period, the report will be placed in the

Public Document Room.

7 903280011

I

~/

Virginia Electric and Power

Company

-2-

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Enclosure:

Inspection Report Nos. 50-280/79-4

and 50-281/79-4

Sincerely,

~~n~

c. E. ,:~c;~;J

Reactor Construction and Engineering

Support Branch