ML18113A955

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-280/79-07 & 50-281/79-07 on 790129-0201.No Noncompliance Noted
ML18113A955
Person / Time
Site: Surry  
Issue date: 02/15/1979
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Proffitt W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
Shared Package
ML18113A956 List:
References
NUDOCS 7903280028
Download: ML18113A955 (2)


See also: IR 05000280/1979007

Text

>

I

. .:..

~R REGc,"'

.*

l-:,~c,,.;

>-o~~

!

~

II)

I

~

~

cf

~'le

.

o'

.,,

~

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION II

101 MARIETTA STREET, N.W.

ATLANTA, GEORGIA 30303

In Reply Refer To:

RII:JLS

50-280/79-7

50-281/79-7

FEB 1 5 1979

Virginia Electric and Power Company

Attn:

Mr. W. L. Proffitt

Senior Vice President, Power Operations

Post Office Box 26666

Richmond, Virginia 23261

Gentlemen:

This refers to the inspection conducted by Mr. J. L. Skolds of this

office on January 29 through February 1, 1979 of activities authorized

by NRC License Nos. DPR-32 and DPR-37 for the Surry Power Station facility,

and to the discussion of our findings held with Mr. W. L. Stewart at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report.

Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were

disclosed.

In accordance with Section 2.790 of the NRC's "Rules of Practice",

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure.

Any such application must

include a full statement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained

in a separate part of the document.

If we do*not hear. from you .in this

regard within the specified period, the report will be *pla.ced in .. the

Public Document Room.

  • .:9Cf>

Virginia Electric and

Power Company

-2-

FEB 1 5 1979

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

Enclosures:

Sincerely,

~

R. C. Lewis, Acting Chief

Reactor Operations and

Nuclear Support Branch

Inspection Report Nos. 50-280/79-7

and 50-281/79-7

cc w/enclosures:

Mr. W. L. Stewart

Station Manager

Surry Power Station

Post Office Box 315

Surry, Virginia 23883