Text
.,...,.*
oiJ:(-
- DISTRIBUTION qentral Filj NRC PDR Ot.C 1 S i97S PSB Reading MOORANDUM FOR:
R. J. Mattson, Director, Division of Systems Safety FROM:
V. Stello> Jr., Director, Division of Operating Reactors
SUBJECT:
REQUEST FOR REVIEW ASSISTANCE (TAC 7170)
Plant Name:
Surry Nuclear Power Station, Units 1 and 2 Docket Noss: 50-280/231 Resoonsible Branch:
ORB#l Project Manager:
D. Neighbors Request Completion Date:
January 15. 1979 Status: Review pending Enclosed are supplemental reports on the Surry. Units 1 and 2 NPSH concerns on both the containment recirculation spray pumps and the 1 ow head saf aty i n.j ecti on pumps.
He request your assistance in reviewing and oroviding a safety evalua-tion of the mass and energy release data submitted by the 1icensee by early January. 1979.
We believe that the Anaiysis Branch is the appro-priate branch to conduct this review.
The rapid review of these submitta1s is required in order to approve the modifications which are scheduled to be implemented during the next refueling outage currently planned in the early spring, 1979. The completed safety evaluation should be fort1arded to 0. G. Eisenhut~ :-\\cting Assistant Director for Systems and Projects.
The material enclosed contains:
- 1.
One copy of a VEPCO NPSH report with cover letter from C. M. Stallings to E.G. Case, dated November 22~ 1977.
- 2.
Letter from C~ M. Stallings to E.G. Case~ dated March 15, 1978.
- 3.
One copy of \\/EPCO's responses for rmc request for additional information with cover letter from C. M. Stallings to E.G. Case, dated April 14, 1978a
.d
- j);)
- Jij. 4.
One copy of VEPCO's res~oaee for NRC request for additional 1nfonnation with cover letter from C. M. Stallings to E.G. Case.
dated April 28> 1978~
- 5.
One copy of VEPCO's response for NRC request for additional information with cover letter from C. M. Stallings to H. R. Denton, dated November 22, 1978.
Enc 1 osures:
As stated
Contact:
O. Shum 492-8077 cc:w/o enclosures:
V. Stello D. Eisenhut R. Tedesco G. Labas A. Schwencer B. Bue kl ey D. Shum D. Neighbors OFFJC:.E~
PSB: DOR SURNAME~
DAT'E~
V. Stallo, Jr., Director Division of Operating Reactors Office of Nuclear Reactor Regulation AD-DOR D: DCJl\\S) o'i.~+~?.... ~~-......
1'2{~/is..........
..,..2.{C,:>7'1s........
NRC F0RM 318 (9-76) NRO£, 0240 U; S..GiOVERNMENT PRINTING OFFICEa 1978 -
828-824**.
... &,,,., - - ---~ - -..